辽阳市汤河温泉劳模修养楼装修工程进度及质量管理
发布时间:2018-10-09 10:41
【摘要】: 项目进度管理和质量管理是应用项目管理的方式方法在工程项目的实施过程中,对各个阶段的进展情况和完成期限及完成质量所进行的管理。劳模修养楼装修工程是由辽阳市汤河温泉职工疗养院投资兴建,具有要求高,工期短,涉及的专业技术工种多,各个工种、各个工序间关系密切,间隔周期短,要求交叉配合等基本特点。本文应用项目管理理论中项目进度和质量管理的先进理念及方法对工程的进度和质量进行科学控制。根据工程的特点,对工程建设过程中的设计阶段、采购阶段、施工阶段进行了综合分析。依照进度和质量目标,采取平行施工、“快速路径”法、流水施工等多种方法来完成计划。利用组织措施、技术措施、经济措施、合同措施等手段为装饰施工项目中的进度控制和质量管理提供积极有效的帮助,旨在探索一条行之有效的装饰工程项目的进度及质量控制途径。
[Abstract]:Project schedule management and quality management is the management of the progress, completion deadline and quality of each stage in the implementation of the project by applying the method of project management. The model building decoration project is built by investment of Tanghe spa sanatorium in Liaoyang city. It has high requirements, short construction period, many kinds of professional and technical work, close relationship between each working procedure, short interval period, Basic features such as cross-matching are required. In this paper, the advanced concepts and methods of project schedule and quality management in the theory of project management are applied to scientifically control the progress and quality of the project. According to the characteristics of the project, the design stage, purchasing stage and construction stage in the process of construction are comprehensively analyzed. According to the progress and quality target, parallel construction, "fast path" method, flow construction and other methods are adopted to complete the plan. The use of organizational measures, technical measures, economic measures, contract measures and other means for decorative construction projects progress control and quality management to provide active and effective help, In order to explore an effective decorative engineering project progress and quality control approach.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2010
【分类号】:F284
本文编号:2259036
[Abstract]:Project schedule management and quality management is the management of the progress, completion deadline and quality of each stage in the implementation of the project by applying the method of project management. The model building decoration project is built by investment of Tanghe spa sanatorium in Liaoyang city. It has high requirements, short construction period, many kinds of professional and technical work, close relationship between each working procedure, short interval period, Basic features such as cross-matching are required. In this paper, the advanced concepts and methods of project schedule and quality management in the theory of project management are applied to scientifically control the progress and quality of the project. According to the characteristics of the project, the design stage, purchasing stage and construction stage in the process of construction are comprehensively analyzed. According to the progress and quality target, parallel construction, "fast path" method, flow construction and other methods are adopted to complete the plan. The use of organizational measures, technical measures, economic measures, contract measures and other means for decorative construction projects progress control and quality management to provide active and effective help, In order to explore an effective decorative engineering project progress and quality control approach.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2010
【分类号】:F284
【参考文献】
相关期刊论文 前10条
1 刘宏;全凌云;;项目质量管理[J];电子质量;2008年10期
2 窦晓锐;;监理工程师对施工进度的控制[J];黑龙江交通科技;2007年02期
3 陈章六;张爱花;钟振华;;企业与项目的质量管理[J];中国建材科技;2008年04期
4 孙姝芳;浅谈监理工程师应如何抓好施工质量的事前控制[J];建设监理;2003年06期
5 宋震;;监理工程师在施工进度控制中的作用[J];建设监理;2006年05期
6 龙振华;董文平;赵培景;刘宏雷;;浅谈施工过程中监理工程计量中的几个问题[J];建设监理;2008年03期
7 徐广;霍岩;高莹;;建筑工程项目管理中的合同管理[J];建筑设计管理;2006年02期
8 白喜平;;谈施工项目质量管理[J];内蒙古科技与经济;2007年20期
9 钱达友;;工程项目进度管理中的时间观[J];四川建筑;2007年03期
10 吉守信;张旭明;;加强全面管理 提高工程质量[J];四川建筑;2007年03期
,本文编号:2259036
本文链接:https://www.wllwen.com/wenyilunwen/shinazhuanghuangshejilunwen/2259036.html