现行法规框架下的项目现场签证效力研究——基于判例研究

发布时间:2018-10-21 08:15
【摘要】:现场签证是工程发承包双方在建设过程中补偿合同状态失衡的重要手段,具有快速性与灵活性,但是常因为其效力问题引起双方的争议。根据最高人民法院司法解释,结合2013清单规范以及工程价款结算暂行办法等相关文件的规定,配合实际判例,厘清实现现场签证的法律效力,为双方解决此类纠纷提供共同的依据。
[Abstract]:On-site visa is an important means for both parties to compensate for the imbalance of contract state in the process of construction. It is quick and flexible, but it is often disputed by both parties because of its effectiveness. In accordance with the judicial interpretation of the Supreme people's Court and the provisions of the relevant documents such as the specification of the 2013 list and the interim measures for the settlement of project prices, and in accordance with practical cases, the legal effect of realizing on-site visas is clarified. To provide a common basis for both parties to resolve such disputes.
【作者单位】: 天津理工大学管理学院;天津大学管理学院;
【基金】:国家自然科学基金资助项目(71172175)
【分类号】:D922.297


本文编号:2284513

资料下载
论文发表

本文链接:https://www.wllwen.com/falvlunwen/jingjifalunwen/2284513.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户90348***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com