A公司新型煤化工大修项目管理研究
发布时间:2018-01-02 19:36
本文关键词:A公司新型煤化工大修项目管理研究 出处:《华东理工大学》2017年硕士论文 论文类型:学位论文
【摘要】:近两年国外和国内煤化工竞争异常激烈,尤其是国际油价下跌和国内煤化工产能过剩,造成公司产品价格低下,企业利润下降严重。为了进一步提高企业的竞争力,不少煤化工企业开始探索延长煤化工大修周期,缩短大修时间,以达到减少大修成本的目的。A公司属于以煤为原料生产甲醇、醋酸和醋酸乙酯的新型煤化工生产基地。面临竞争激烈的环境,作为煤化工的新型示范性基地,迫切需要保证大修质量以及安全,缩短大修时间,提升公司的竞争力。本文以A公司为例,阐述了公司进行大修项目管理的背景和意义,分析了A公司大修检修项目、大修的基本情况和面临的问题。然后,基于WBS对大修项目进行工作结构分解,确定大修项目工序之间的先后关系及时间参数,绘制大修项目的网络进度计划图,通过计算最早开始时间、最早完成时间、最晚开始时间和最晚结束时间等时间参数,确定了项目的关键路径。同时,提出了项目进度控制的保障措施。在此基础上,提出了大修项目质量的计划和控制,提出了相应的安全目标和安全控制措施。
[Abstract]:In the last two years, the competition between foreign and domestic coal chemical industry is extremely fierce, especially the drop of international oil price and the overcapacity of domestic coal chemical industry, which results in the low price of the company's products. In order to further improve the competitiveness of enterprises, many coal chemical enterprises began to explore the extension of coal chemical overhaul cycle and shorten the overhaul time. In order to reduce the cost of overhaul, Company A belongs to the new coal chemical production base of producing methanol, acetic acid and ethyl acetate from coal. Facing the fierce competition environment, A Company is a new model base of coal chemical industry. There is an urgent need to ensure the quality and safety of the overhaul, shorten the overhaul time, and enhance the competitiveness of the company. This paper takes company A as an example to explain the background and significance of the project management in the company. This paper analyzes the overhaul project of company A, the basic situation of overhaul and the problems faced. Then, based on WBS, the work structure of the overhaul project is decomposed to determine the relation and time parameter between the working procedures of the overhaul project. By calculating the earliest start time, the earliest completion time, the latest start time and the latest end time, the critical path of the project is determined. On the basis of this, the plan and control of the quality of the overhauling project are put forward, and the corresponding safety objectives and safety control measures are put forward.
【学位授予单位】:华东理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.7
【参考文献】
相关期刊论文 前9条
1 俞宗卫;屈江;俞靖贤;;网络计划技术在施工项目管理中应用问题的讨论[J];四川建筑科学研究;2008年05期
2 庞秋翠;黄琦;田兵权;;浅论基于动态目标管理的项目进度管理[J];价值工程;2008年05期
3 万立;陈性攀;刘清华;;面向产品开发的项目管理在产品数据管理中的研究[J];计算机集成制造系统;2007年01期
4 王忠平;;现代项目管理在科技项目中的应用研究[J];中国科技论坛;2006年06期
5 杨锁强,樊建新,刘芳;产业化技术项目评价指标的系统集成与综合评价模型的构建[J];研究与发展管理;2004年04期
6 程锡礼,张延林,崔新生;蒙特卡洛仿真在工程项目进度管理中的应用[J];工业工程;2004年03期
7 廖清平;建筑项目管理中的冲突管理[J];工程建设与设计;2003年07期
8 谢琳琳,傅鸿源;初探生态化建筑项目管理[J];建设监理;2003年03期
9 秦朔;美国企管思维十大变化[J];领导决策信息;2001年41期
,本文编号:1370666
本文链接:https://www.wllwen.com/gongshangguanlilunwen/1370666.html