澄合二矿资源整合项目可行性研究
[Abstract]:In order to solve the problems of insufficient exploitation of mineral resources in the original mining area and to expand the mining output in this area, the Chenghe No. 2 Coal Mine Mineral Resources Integration Project is prepared to further expand the extension and development of mineral resources in the third level coal seam of No. 2 Coal Mine. The aim of this paper is to improve the whole exploitation level of the whole mining area, the intensive exploitation degree and the risk control of the mineral enterprises, and to promote the rational expansion of the production of the mineral resources in Chenghe No. 2 Mine. Based on the analysis of the actual progress in the development of mineral resources in Chenghe No. 2 Mine, it is found that the integration of resources has begun to solve the problem of production expansion. However, because of the limitation of mining scope, the backward mining technology and the lack of specialized technicians, the production of coal resources in this area has entered the bottleneck of continuing exploitation because of the limitation of mining scope, the lack of specialized technicians, especially the local coal mining enterprises. In the face of the transformation and adjustment of the national energy consumption structure, no matter whether the resource integration project is the merger and reorganization of the small coal enterprises familiar with the surrounding areas or the further deep mining in this mining area, it is looking for ways to expand the output of coal resources. Will face great risks. The feasibility study on the integration project of mineral resources has very important practical and theoretical significance for coal enterprises. On the basis of summing up the existing research at home and abroad, this paper studies the feasibility of Chenghe No. 2 Mine Resource Integration Project by the methods of literature research, questionnaire survey, qualitative and quantitative research. Firstly, the necessity of resource integration project is analyzed by analyzing the actual situation of the existing mine, production status and market situation in Chenghe No. 2 Mine. Secondly, the risk of the project, especially the environmental risk, is analyzed. This paper demonstrates the safety feasibility of the integrated project, and through the analysis of the new level of development conditions, the situation of the mining area, the level of the production auxiliary system and so on, obtains that the integration project is technically feasible, and finally, The economic feasibility of the project is further analyzed through financial evaluation, and it is proved that the project is economically feasible. On the basis of this, the project scheme of resource integration in Chenghe No. 2 Coal Mine is established. This scheme has certain reference and reference significance in realizing rational utilization and development of new resources in mining area, optimizing allocation of resources, realizing intensive development of enterprises, and is more conducive to the optimization of the development layout of mineral resources in Chenghe No. 2 Mine. It also brings the influence of taxes, profits and costs to the local economic transformation, and realizes the sustainable development of mineral regions.
【学位授予单位】:西安科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.21;TD82
【参考文献】
相关期刊论文 前10条
1 宋国明;郑子敬;;澳大利亚矿业投资环境[J];国土资源情报;2012年12期
2 罗小南;;关于矿产资源整合所面临困局的思考[J];中国国土资源经济;2010年11期
3 刘伯恩;鲁晓琨;;矿产资源整合中的经济关系研究[J];矿产保护与利用;2010年04期
4 宋磊;汪雄武;;浅议我国的矿产资源整合[J];中国国土资源经济;2010年07期
5 朱永全;;从资源整合到体制、机制和人心整合的转变——中小煤矿实施资源整合的新突破[J];中国煤炭工业;2010年05期
6 张建平;马司玺;;山西煤炭资源整合若干问题的探讨[J];中国高新技术企业;2010年12期
7 陈春林;;关于进一步推进矿产资源开发整合工作[J];世纪行;2010年03期
8 曹慧芳;;对资源整合操作问题的探讨[J];煤;2010年02期
9 贾宝亮;;山西煤炭资源的整合利用[J];山西能源与节能;2009年06期
10 原俊恩;;煤炭资源整合是社会发展的需要[J];山西煤炭;2009年03期
相关硕士学位论文 前5条
1 刘小军;S公司煤炭资源整合方案设计研究[D];华南理工大学;2014年
2 张磊;小保当矿井投资项目可行性研究[D];西南石油大学;2014年
3 杜菲;山西JM集团煤炭资源整合矿井G项目可行性研究[D];天津大学;2012年
4 王飞;山西省煤炭产业整合研究[D];山西财经大学;2011年
5 秦利斌;郑庄矿井项目可行性分析及管理运营模式研究[D];天津大学;2010年
,本文编号:2136598
本文链接:https://www.wllwen.com/gongshangguanlilunwen/2136598.html