基于RCM的S公司变电设备状态检修管理案例研究
[Abstract]:With the progress of electric power technology and the development of power grid scale, the socialized service degree of power grid is becoming higher and higher, and the demands of society and users on power supply enterprises are increasing day by day. Under this background, the power supply enterprise comprehensively improves the transformer equipment maintenance strategy, how to promote the substation equipment condition maintenance management has become a research direction. On the basis of clarifying the background and significance of selecting the topic and summarizing the research trends of condition-based maintenance at home and abroad, this paper expounds in detail the theory and technology of equipment maintenance, condition-based maintenance and RCM maintenance. This paper takes S company substation equipment as the research object, analyzes the current situation from S Company to carry out the condition maintenance related condition, feasibility and the important measure to be taken. In view of the present situation, the paper puts forward the maintenance strategy of substation equipment based on condition maintenance in S Company, clarifies the overall goal, organization system and division of labor, basic requirements, steps and management flow of condition maintenance in S Company, and puts forward the main method of condition monitoring. The main methods of condition evaluation and maintenance decision. And try to apply RCM maintenance strategy decision system in S Company. The system requirements, the overall structure and the system functions are described in detail. According to the evaluation method of the equipment evaluation weight coefficient and the evaluation rules, the corresponding mathematical model is established. Based on the comprehensive consideration of the health state of the equipment and the degree of reliability of the equipment, the maintenance priority order of the equipment is comprehensively judged, and a set of reliability centered transformer equipment evaluation mechanism is established. Finally, the future improvement and development direction of S company substation equipment condition maintenance are prospected and analyzed. This paper provides a way and method to judge the maintenance priority of equipment based on the comprehensive consideration of equipment health and reliability, and provides an effective mathematical support for the reliable operation analysis of substation maintenance in power supply company. At the same time, this paper can be used as a reference for local power supply companies, especially for power supply companies to implement the RCM based transformer equipment condition maintenance strategy.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.61;TM507
【参考文献】
相关期刊论文 前10条
1 陈卫;;状态检修模式下探析变电检修技术[J];科技与创新;2014年24期
2 郭继芳;;状态检修在变电设备检修管理中的应用[J];电气技术;2012年10期
3 陈燕燕;陈忠义;;电力设备在线监测综合分析平台的构建[J];广东电力;2011年12期
4 曾成;苏锦华;;以可靠性为中心的维修在地铁车辆车门系统中的运用[J];机车电传动;2011年06期
5 党永成;;电力设备状态检修应用探讨[J];中国电力企业管理;2011年16期
6 纪金荣;;关于设备状态检修在供电企业中的应用探讨[J];价值工程;2010年36期
7 孙磊;孙晓伟;;关于变电设备状态检修策略的应用研究[J];科技创新导报;2009年35期
8 王世达;杨剑锋;;以可靠性为中心的维修方法在离心压缩机系统的应用[J];中国设备工程;2009年11期
9 汪洋;钟骏杰;;以可靠性为中心的船舶维修管理策略[J];科技创新导报;2009年32期
10 何钟武;;浅谈国内外RCM技术的研究与应用[J];航空标准化与质量;2006年03期
相关博士学位论文 前2条
1 苍安裕;基于可靠性预测的淀粉生产系统维修决策理论与实证研究[D];吉林大学;2012年
2 高萍;基于可靠性分析的复杂设备预防性维修决策研究[D];清华大学;2008年
相关硕士学位论文 前10条
1 雷晨;目标层级分析法在成本估算中的应用研究[D];中南大学;2011年
2 罗冠军;基于RCM的电站设备维修管理信息系统的研究[D];华北电力大学(北京);2009年
3 杨红军;变电设备状态检修决策支持系统研究[D];华北电力大学(北京);2008年
4 刘远龙;青岛供电公司变电设备状态检修项目管理研究[D];华北电力大学(河北);2008年
5 张道荣;基于生产MIS系统的变电设备状态检修管理系统的设计与实现[D];合肥工业大学;2008年
6 杜亚平;电力设备状态检修辅助分析系统[D];西安理工大学;2007年
7 高亚娴;电力变压器故障诊断及寿命预测方法的研究[D];西安电子科技大学;2007年
8 蒋太立;基于RCM理论的维修决策研究[D];武汉理工大学;2006年
9 蒋献伟;基于可靠性的供电设备检修计划优化的研究[D];浙江大学;2006年
10 余杰;RCM和免疫算法在变电设备状态检修中的应用[D];浙江大学;2005年
,本文编号:2197196
本文链接:https://www.wllwen.com/gongshangguanlilunwen/2197196.html