当前位置:主页 > 管理论文 > 工程管理论文 >

郑徐高铁开封段地面沉降分层监测方法

发布时间:2018-03-14 12:49

  本文选题:高铁 切入点:地面沉降 出处:《测绘通报》2017年11期  论文类型:期刊论文


【摘要】:高铁沿线施工期间引起地面沉降的因素错综复杂、相互影响,本文提出通过对沉降区域地下水位、孔隙水压力等进行分层观测,根据分层观测得到地下水位变化、孔隙水压力变化等数据,并采用回归分析法构建了沉降区域地面沉降与诸影响因子的关联模型,通过对郑徐客运专线开封段进行的地面沉降监测量与同时采用二等精密水准测量得到的监测点沉降量进行对比分析,结果表明本方法的有效性和可靠性。
[Abstract]:The factors that cause the ground subsidence along the high-speed railway line during construction are complicated and influence each other. This paper proposes that the groundwater level changes can be obtained by stratified observation of groundwater level and pore water pressure in the settlement area. Based on the data of pore water pressure variation and regression analysis, the correlation model between land subsidence and influencing factors in subsidence area is established. By comparing the ground subsidence monitoring quantity of Kaifeng section of Zhengxu passenger dedicated line with that of the monitoring point obtained by using the second class precision leveling at the same time, the results show that the method is effective and reliable.
【作者单位】: 黄河水利职业技术学院测绘工程学院;河南理工大学矿山空间信息技术国家测绘地理信息局重点实验室;
【基金】:2016年度国家重点研发计划重点专项(2016YFC0803103)
【分类号】:P642.26;U212.22

【相似文献】

相关期刊论文 前1条

1 ;山东省人民政府关于组织实施山东省地面沉降防治规划(2012—2020年)的通知[J];山东省人民政府公报;2014年13期



本文编号:1611282

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/gongchengguanli/1611282.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户94588***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com