超大断面隧道爆破质量三维可视化数字模型与评价
发布时间:2018-08-29 08:12
【摘要】:现有的隧道爆破质量评价与控制大多依赖决策者的工程经验和主观认识,仅凭人为观测做定性分析,评价与控制成果一般表现为二维平面图,不能直观、可视化对隧道爆破质量进行表达。本文基于隧道数据采集模块、隧道数据前处理模块和隧道三维可视化模型构建模块等提出了隧道爆破质量三维可视化数字模型构建的方法,以成渝高铁某隧道为例,设计了隧道爆破质量三维可视化数字模型基础数据采集方案,建立了隧道爆破质量三维可视化数字模型,提出了隧道爆破质量综合评价的方法。研究结果表明,建立的三维可视化模型可再现隧道爆破超欠挖的真实结构特性,可实现对隧道爆破质量的综合评价,弥补目前隧道爆破质量评价与控制存在的不足。
[Abstract]:Most of the existing evaluation and control of tunnel blasting quality depend on the engineering experience and subjective understanding of the decision makers. The qualitative analysis is only based on artificial observation. The results of evaluation and control generally show two-dimensional plan, which can not be intuitionistic. Visualize the quality of tunnel blasting. Based on tunnel data acquisition module, tunnel data pre-processing module and tunnel 3D visualization model construction module, this paper puts forward a method of constructing 3D visual digital model of tunnel blasting quality, taking a tunnel of Chengdu-Chongqing high-speed railway as an example. The basic data acquisition scheme of 3D visualization digital model of tunnel blasting quality is designed, the 3D visual digital model of tunnel blasting quality is established, and the comprehensive evaluation method of tunnel blasting quality is put forward. The results show that the 3D visual model can reproduce the real structural characteristics of tunnel blasting overdigging and realize the comprehensive evaluation of tunnel blasting quality, and make up for the shortcomings of tunnel blasting quality evaluation and control.
【作者单位】: 中国矿业大学(北京)深部岩土力学与地下工程国家重点实验室;浙江科技学院土木与建筑工程学院;同济大学地下建筑与工程系;中铁二局集团有限公司;
【基金】:国家自然科学基金(No.41602308,No.41502323,No.41572299) 浙江省公益技术应用研究计划(No.2016C33033) 浙江科技学院科研基金(F702104E03);浙江科技学院学科交叉预研专项(2015JC04Y) 中铁二局股份有限公司课题(201218)
【分类号】:TP391.41;U455.6
[Abstract]:Most of the existing evaluation and control of tunnel blasting quality depend on the engineering experience and subjective understanding of the decision makers. The qualitative analysis is only based on artificial observation. The results of evaluation and control generally show two-dimensional plan, which can not be intuitionistic. Visualize the quality of tunnel blasting. Based on tunnel data acquisition module, tunnel data pre-processing module and tunnel 3D visualization model construction module, this paper puts forward a method of constructing 3D visual digital model of tunnel blasting quality, taking a tunnel of Chengdu-Chongqing high-speed railway as an example. The basic data acquisition scheme of 3D visualization digital model of tunnel blasting quality is designed, the 3D visual digital model of tunnel blasting quality is established, and the comprehensive evaluation method of tunnel blasting quality is put forward. The results show that the 3D visual model can reproduce the real structural characteristics of tunnel blasting overdigging and realize the comprehensive evaluation of tunnel blasting quality, and make up for the shortcomings of tunnel blasting quality evaluation and control.
【作者单位】: 中国矿业大学(北京)深部岩土力学与地下工程国家重点实验室;浙江科技学院土木与建筑工程学院;同济大学地下建筑与工程系;中铁二局集团有限公司;
【基金】:国家自然科学基金(No.41602308,No.41502323,No.41572299) 浙江省公益技术应用研究计划(No.2016C33033) 浙江科技学院科研基金(F702104E03);浙江科技学院学科交叉预研专项(2015JC04Y) 中铁二局股份有限公司课题(201218)
【分类号】:TP391.41;U455.6
【相似文献】
相关期刊论文 前10条
1 齐景岳;隧道爆破技术的回顾与展望[J];铁道建筑;2005年S1期
2 李顺达;;隧道爆破对地表房屋的影响[J];安徽水利水电职业技术学院学报;2008年02期
3 梁文娟;焦平;种道坦;;施工隧道爆破对某住宅楼的影响分析[J];山西建筑;2012年35期
4 杨年华,刘世波;乳化炸药泵送装填技术及其在隧道爆破中的应用[J];铁道建筑;2005年S1期
5 杨建礼;张辉;黄升龙;;隧道爆破对地表房屋的影响[J];山西建筑;2007年11期
6 傅洪贤;;条形药包在隧道爆破中产生的应力场的实测分析[J];岩土力学;2009年02期
7 邹振;吴立;佐清军;;野山河码头隧道爆破设计[J];探矿工程(岩土钻掘工程);2009年11期
8 叶显亮;;隧道爆破施工对附近房屋的振动监测与影响分析[J];贵州大学学报(自然科学版);2010年02期
9 程围峰;梁旭;王振宇;;隧道爆破施工对邻近输油管道的影响评价[J];石油工程建设;2011年04期
10 冯义;赵先鹏;马菖林;陈寿根;;临近隧道爆破研究的现行问题分析[J];公路隧道;2011年03期
相关会议论文 前5条
1 郑大榕;;控制隧道爆破振动研究[A];中国土木工程学会隧道及地下工程学会第八届年会论文集[C];1994年
2 常翔;;侯月铁路云台山隧道爆破技术安全管理浅谈[A];爆破安全技术与管理研讨会论文集[C];2006年
3 王世n,
本文编号:2210704
本文链接:https://www.wllwen.com/guanlilunwen/gongchengguanli/2210704.html