烟台栖霞双峰公司超细粉技改扩能项目投资风险研究
[Abstract]:In this paper, the background and significance of this study are first expounded. Based on the analysis of the current research situation at home and abroad, the specific scheme of this study is established, including the research objectives, research contents, research methods, and the technical route of this study. It is hoped that the feasibility of the super fine powder technical transformation and expansion project of Shuangfeng Company and the reasonable control of the risk can be obtained through this study to ensure the smooth implementation of the project. According to the basic theory of risk management combined with the expansion project of super fine powder technology of Shuangfeng Company, the third part of this paper introduces the construction background and condition of the project in detail. According to the above research and elaboration, the fourth part of this paper studies the content of risk identification of the project, including the selection of risk identification methods, and the investment planning stage of the super-fine powder technical transformation and capacity expansion project. The risk factors of the project construction stage and the project operation stage are analyzed, and the main risks are analyzed from the aspects of technical risk, market risk, environmental risk, economic risk and management risk. The fifth part of this paper is mainly from the qualitative and quantitative aspects of the super-fine powder expansion project of the venture capital evaluation analysis, select the appropriate evaluation method and establish an evaluation system. Through fuzzy comprehensive evaluation, it is concluded that the project belongs to moderate risk, and risk management should be strengthened, and the evaluation of investment risk result is put forward. In the sixth part of this paper, the investment risk control of bimodal ultrafine powder expansion project is studied, and the methods of risk control are put forward, including risk prevention, risk aversion, risk transfer and risk control. In addition, the corresponding countermeasures are put forward for different types of risks. Finally, I summarize the research results, and put forward some reflections and prospects according to the problems encountered in the course of the research and the estimation of the future market. Through the research of this subject, we hope to find out the advantages of the enterprise, and find the key to the effective advancement of the project, in order to give full play to the role of enterprise resources and play its own advantage. Therefore, this paper provides some feasible measures for the operation of the project, hoping that as the guidance of the company for the future development planning, the technical transformation and capacity expansion project of the company can be completed as soon as possible, and the company can put into production as soon as possible. For the company to achieve due benefits, promote the company's continuous development and progress.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.7;F272
【参考文献】
相关期刊论文 前10条
1 武平刚;;试论风险管理在城市地铁工程中的应用[J];经营管理者;2013年25期
2 王洁方;;基于竞争视野优化的政府投资项目评价模型[J];科学技术与工程;2012年35期
3 曹丽;;建设工程项目投资控制体系与方法浅析[J];中国集体经济;2012年09期
4 王娟;;模糊层次分析法在储罐施工HSE风险评估中的应用[J];安全与环境工程;2011年05期
5 姚彩英;;浅议工程项目评估[J];甘肃科技纵横;2011年02期
6 仉瑞红;孙鹏;;建设工程项目业主风险管理中的合同管理[J];科技信息;2011年04期
7 杨红霞;;项目进度管理方法研究[J];山西建筑;2010年29期
8 宁建平;;基于流程驱动的项目进度管理研究[J];项目管理技术;2010年09期
9 林方敏;;清洁生产在化工项目环境影响评价中的应用[J];大众科技;2010年09期
10 周立法;;浅析药品生产企业的质量风险管理[J];机电信息;2010年17期
相关会议论文 前1条
1 王峰;王敬敏;;基于多级物元分析的建筑工程承包商风险评价研究[A];第九届中国青年信息与管理学者大会论文集[C];2007年
相关硕士学位论文 前3条
1 郑志满;XH制药原料药工艺优化项目管理模式研究[D];中国海洋大学;2012年
2 顾连胜;大型工程投资决策中风险管理的理论与应用研究[D];西安建筑科技大学;2004年
3 杨志军;建筑工程的风险控制研究[D];大连理工大学;2003年
,本文编号:2131962
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2131962.html