基于模糊物元的垃圾焚烧发电PPP项目绩效评价
本文选题:PPP + 垃圾焚烧发电 ; 参考:《华东交通大学》2017年硕士论文
【摘要】:随着PPP模式在我国各领域的广泛普及应用,对PPP项目开展绩效评价越来越受到重视。绩效评价是项目全生命周期中的不可或缺的反馈和总结环节。对PPP项目开展绩效评价有助于提高PPP项目决策、建设以及运营全过程的效率,对后续PPP项目的实施具有重要借鉴价值。垃圾焚烧发电技术是在高温下焚烧垃圾,使毒害物质充分燃烧分解,这个过程中产生的大量高温烟气可以在净化后使用余热锅炉回收,从而获得较高温度和压力的热蒸汽,使用发电机组将这些转化为电能,最终实现垃圾处理和废物资源再利用,良好的垃圾处理效果和环保效益使其在世界范围内受到大力推广。将PPP模式应用于垃圾焚烧发电项目既能够有效缓解政府财政压力,又能够有效提高垃圾处理管理水平。同时,由于缺乏统一的行业实施标准,且受项目特性和技术难度的制约,我国垃圾焚烧发电PPP项目也出现了一些失败的案例。为了能够提高项目实施成功率,总结经验以便能进行更高效的推广,对垃圾焚烧发电PPP项目绩效评价的研究显得十分重要。论文对我国垃圾焚烧发电PPP项目的应用现状进行研究,在大量文献阅读和资料查询的基础上,结合项目关键成功因素构建了垃圾焚烧发电PPP项目绩效评价指标体系,使用模糊物元综合评价方法建立绩效评价模型,在评价中使用熵权法确定指标权重,采用三角型隶属度函数对指标值模糊化处理求取结果。最后通过对具体项目实际执行情况做出评价,证明所构建的绩效评价指标体系和模糊物元综合评价模型的有效性及实用性。
[Abstract]:With the widespread application of PPP model in various fields of our country, more and more attention has been paid to the performance evaluation of PPP projects. Performance evaluation is an indispensable feedback and summary link in the whole project life cycle. The performance evaluation of PPP project is helpful to improve the efficiency of decision-making, construction and operation of PPP project, and has important reference value for the implementation of subsequent PPP project. The technology of waste incineration for power generation is to incinerate garbage at high temperature, so that toxic substances can be fully burned and decomposed. A large amount of high temperature flue gas produced in this process can be recovered by waste heat boiler after purification, thus obtaining hot steam at higher temperature and pressure. The generator sets are used to convert these into electric energy and realize the waste disposal and reuse of waste resources. Good waste treatment effect and environmental protection benefit make it widely used all over the world. The application of PPP model in MSW incineration power generation project can not only effectively relieve the government financial pressure, but also effectively improve the management level of MSW treatment. At the same time, due to the lack of uniform industry standards, and restricted by the characteristics of the project and technical difficulties, there have been some cases of failure in the PPP project of MSW incineration power generation in China. In order to improve the success rate of the project and summarize the experience so that it can be popularized more efficiently, it is very important to study the performance evaluation of the PPP project of MSW incineration power generation. In this paper, the application status of PPP project in China is studied. On the basis of a large amount of literature reading and data query, the performance evaluation index system of MSW incineration power generation PPP project is constructed in combination with the key success factors of the project. The fuzzy matter-element comprehensive evaluation method is used to establish the performance evaluation model, the entropy weight method is used to determine the index weight, and the triangular membership function is used to obtain the result by fuzzifying the index value. Finally, the effectiveness and practicability of the performance evaluation index system and the fuzzy matter-element comprehensive evaluation model are proved by evaluating the actual implementation of the specific project.
【学位授予单位】:华东交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.61;F283;X705
【参考文献】
相关期刊论文 前10条
1 汤健;邓文伟;;基于DPSIR模型的资源型企业环境绩效评价[J];会计之友;2017年01期
2 周正祥;张秀芳;张平;;新常态下PPP模式应用存在的问题及对策[J];中国软科学;2015年09期
3 宋金波;宋丹荣;付亚楠;;垃圾焚烧发电BOT项目收益的系统动力学模型[J];管理评论;2015年03期
4 叶苏东;;城市垃圾焚烧发电BOT项目的偿付机制[J];北京交通大学学报(社会科学版);2014年04期
5 王俊豪;付金存;;公私合作制的本质特征与中国城市公用事业的政策选择[J];中国工业经济;2014年07期
6 兰兰;高成修;;基于AHP的PPP绩效评估体系研究[J];海南大学学报(人文社会科学版);2013年03期
7 孙慧;申宽宽;范志清;;基于SEM方法的PPP项目绩效影响因素分析[J];天津大学学报(社会科学版);2012年06期
8 宋金波;宋丹荣;孙岩;;垃圾焚烧发电BOT项目的关键风险:多案例研究[J];管理评论;2012年09期
9 孙邦栋;孙大松;莫雁安;;西方国家公共投资项目绩效评价理论研究综述[J];当代经济;2012年04期
10 袁竞峰;季闯;李启明;Skibniewski Miroslaw J.;;基于虚拟标杆的基础设施PPP项目绩效评价体系构建[J];现代管理科学;2011年07期
相关博士学位论文 前1条
1 刘志峰;绿色产品综合评价及模糊物元分析方法研究[D];合肥工业大学;2004年
相关硕士学位论文 前7条
1 严丹良;公私合作项目绩效评价研究[D];西安建筑科技大学;2014年
2 张绍伶;基于熵权法的水利工程工期方案评价研究[D];大连理工大学;2014年
3 刘剑;我国垃圾焚烧发电项目的技术经济评价研究[D];吉林大学;2013年
4 李程;天津滨海新区第一垃圾焚烧发电厂项目后评价研究[D];华北电力大学;2013年
5 赵新博;PPP项目绩效评价研究[D];清华大学;2009年
6 孙明远;我国地方政府财政投资基础设施建设项目绩效评价研究[D];中国海洋大学;2009年
7 游亚宏;政府投资项目采购及其绩效评价研究[D];天津大学;2006年
,本文编号:1801761
本文链接:https://www.wllwen.com/jingjifazhanlunwen/1801761.html