国家战略物资储备工程代建制项目管理模式研究
[Abstract]:As an important means to realize government functions, such as macro-control and policy guidance, in the traditional management mode of government investment projects, there are serious phenomena such as low investment benefit, low management benefit, low engineering benefit, etc. Even to a certain extent, there are over-batch estimate, over-construction scale, over-construction standard "three super" problem. The emergence of these phenomena and problems is mainly due to the long time under the planned economy system our country government function localization is not correct, the management scope is too wide and so on. In order to ensure the efficient use of state financial budget funds and to effectively improve the level of efficiency of investment, management and engineering, the State Council has proposed to reform the investment system. In particular, it is pointed out that for non-operating government investment projects, we must speed up the implementation of "agent system". It is hoped that the present situation of low investment benefit and low engineering management level can be really improved by introducing specialized third party engineering management institutions. After more than 20 years of practical operation, the "agent system" has been recognized by most government departments in the country, and the "agent system" management mode has been implemented in the process of organizing and constructing non-profit-making government investment projects. Has become the consensus of government departments at all levels. The national strategic material reserve project is a project which is invested directly by the central budget to store the storage facilities of the national strategic materials. It is generally approved and approved by the National Development and Reform Commission. It is a typical non-commercial government investment project. At present, the national strategic material reserve project still follows the traditional management mode in the process of organizing and implementing, the project construction lags behind the time limit plan, and the management operation efficiency is traditional and inefficient. The outstanding problems in traditional engineering management mode such as high investment cost and low benefit are common. Under the framework of the current national laws and regulations, it is necessary to introduce the agent system in the national strategic material reserve project, which is a non-profit-making government investment project, in order to improve the project management level and improve the management efficiency. This paper has studied and combed the domestic literature and basic theories on agency construction and foreign public works project management, and has successively carried out field research in Inner Mongolia, Shanxi, Hubei and Guangdong. This paper summarizes and analyzes the problems existing in the project management of the national strategic material reserve project. On this basis, the paper puts forward the general idea of the project management mode design of the national strategic material reserve engineering agent system, as well as the project management system, the project management organization and the project management evaluation system optimization suggestions, combined with the actual situation, Starting with the implementation process of the national strategic material reserve engineering agent system model, the paper clarifies the construction plan of the project construction management center, the construction plan of the engineering project department and the selection process of the agent construction unit. In addition, the paper analyzes the risk of implementing the agent construction project management mode in the national strategic material reserve project, and puts forward the establishment of the national strategic material reserve project agent construction market access system and the strengthening of supervision over the bidding behavior. Control the relative independence of participating units, give full play to the role of supervision of grass-roots warehouses, establish a scientific and reasonable evaluation system and other risk prevention measures.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F283
【参考文献】
相关期刊论文 前10条
1 林静;吴波;周武飞;;集中代建制在政府投资项目中管理方式的探讨[J];四川建材;2017年03期
2 李丽光;孙明禄;;浅谈“代建制”管理模式的风险及管理对策[J];财会学习;2016年22期
3 张蕾;;高校新校区建设监管风险分析与控制——基于代建制模式[J];财政监督;2016年20期
4 王兴盛;;浅析建筑工程项目管理模式[J];江西建材;2016年17期
5 惠博;;工程项目管理代建制模式理论初探[J];中外企业家;2016年25期
6 戴大双;吕途;顾强;;基于不同治理强度的代建制项目结构研究[J];预测;2016年02期
7 荣灯;南毅;;PMC项目管理模式应用研究[J];石化技术;2015年12期
8 詹约丹;林海燕;;中外政府类投资项目管理模式对比探析[J];山西建筑;2015年14期
9 王卓甫;张显成;丁继勇;;项目管理与项目治理的辨析[J];工程管理学报;2014年06期
10 陈瑞;;PM/PMC模式与常用项目管理模式的对比[J];山西建筑;2014年13期
相关博士学位论文 前1条
1 赵淳怡;我国非经营性政府投资工程项目代建制研究[D];同济大学;2008年
相关硕士学位论文 前6条
1 陆霞;基于委托代理理论的政府投资项目激励监督机制研究[D];南京财经大学;2015年
2 陈刚;日本主导产业产业关联分析[D];辽宁大学;2012年
3 张良;治理视角下我国政府投资行为中的委托代理关系研究[D];电子科技大学;2011年
4 彭天明;基于委托—代理理论的政府投资项目代建制风险研究[D];重庆大学;2008年
5 彭杰;代建制委托代理问题研究[D];清华大学;2008年
6 郭留洋;政府投资项目代建制管理模式研究[D];天津大学;2006年
,本文编号:2135125
本文链接:https://www.wllwen.com/jingjifazhanlunwen/2135125.html