当前位置:主页 > 经济论文 > 工业经济论文 >

华能魏家峁煤电一体化项目投资效益分析

发布时间:2018-05-25 17:06

  本文选题:煤电一体化电厂 + 层次分析法 ; 参考:《华北电力大学》2014年硕士论文


【摘要】:投资效益分析是项目生命周期中不可或缺的环节,对项目进行投资效益分析有利于提高项目的决策水平和管理质量,,可以有效地减少盲目投资行为和短期行为。电力建设项目由于其本身具有投资额高和建设期长的特点,使得在此类建设项目中一旦出现投资决策失误将给企业带来巨大损失,这使得针对电力建设项目所进行的投资效益分析显得尤其重要,同时其分析过程和评价标准也更为严格。 本文在对华能魏家峁煤电一体化项目建设方案进行具体介绍的基础上,结合该项目的财务效益、国民经济效益和社会效益三个方面的分析,对整个建设项目的投资效益进行了分析评价。首先对选题背景和选题意义进行了阐述,分析了国内外研究学者在项目的投资效益评价分析上的研究现状;然后给出了对煤电一体化项目进行投资效益分析的理论基础并对华能魏家峁煤电一体化电厂的概况进行了介绍并对该项目建设的必要性进行了研究分析;进而介绍了项目的基本情况并分析此项目技术可行性;最后,从财务效益、国民经济效益和社会效益三个方面建立了华能魏家峁煤电一体化项目的评价指标体系、运用层次分析法确定各项权重、运用模糊综合评价的方法对该项目进行全面分析评价得到该项目方案的投资效益分析评价结果。结果显示该项目方案在财务效益、国民经济效益、社会效益评价上均具有较高的得分,表明项目各方面效益较好,方案可行。希望本文的研究成果能够为今后类似项目方案的投资效益分析提供借鉴参考。
[Abstract]:Investment benefit analysis is an indispensable link in the project life cycle. Investment benefit analysis can improve the decision-making level and management quality of the project, and can effectively reduce blind investment behavior and short-term behavior. Because the electric power construction project has the characteristic of high investment and long construction period, it will bring huge losses to the enterprise once the investment decision error occurs in this kind of construction project. This makes the investment benefit analysis of electric power construction project especially important, at the same time, its analysis process and evaluation standard are more strict. On the basis of introducing the construction plan of Huaneng Weijiaomao coal and electricity integration project, this paper analyzes the financial benefit, national economic benefit and social benefit of the project. The investment benefit of the whole construction project is analyzed and evaluated. First of all, the background and significance of the topic are expounded, and the research status of domestic and foreign scholars in the evaluation of investment benefits of the project is analyzed. Then it gives the theoretical basis of investment benefit analysis of coal-power integration project, introduces the general situation of Huaneng Weimao coal-power integrated power plant, and studies the necessity of the project construction. Then it introduces the basic situation of the project and analyzes the technical feasibility of the project. Finally, the evaluation index system of Huaneng Weijiaomao coal and electricity integration project is established from three aspects: financial benefit, national economic benefit and social benefit. The analytic hierarchy process (AHP) is used to determine the weight of the project and the fuzzy comprehensive evaluation method is used to analyze and evaluate the project comprehensively. The result of investment benefit analysis and evaluation of the project is obtained. The results show that the project has a higher score in financial benefit, national economic benefit and social benefit evaluation, which indicates that the project has better benefit in all aspects and the scheme is feasible. It is hoped that the research results of this paper can provide a reference for the investment benefit analysis of similar projects in the future.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:F406.7;F426.61

【参考文献】

相关期刊论文 前10条

1 沈黎明;;电力建设项目经济评价研究[J];电气技术;2012年03期

2 聂宏展;吕盼;乔怡;姚秀萍;;基于熵权法的输电网规划方案模糊综合评价[J];电网技术;2009年11期

3 范荣;;项目动态经济评价指标的分析比较[J];经营管理者;2013年01期

4 彭红;孙昌玲;;建设项目财务盈利能力动态分析[J];工程与建设;2013年06期

5 李玉琳;高志刚;韩延玲;;模糊综合评价中权值确定和合成算子选择[J];计算机工程与应用;2006年23期

6 黄生权;项目评价指标──净现值的扩展[J];技术经济与管理研究;2001年06期

7 张建辉;武锐;;风电场投资项目的社会效益评价研究[J];价值工程;2011年05期

8 岳意定;刘丹;曾之明;;基于人工神经网络的投资项目效益评估模型[J];矿冶工程;2007年06期

9 谢丽娟;陈俏;;模糊综合评判中合成算子的选取[J];科协论坛(下半月);2012年09期

10 周光秋;;企业项目建设投资偿债能力分析与研究[J];企业家天地下半月刊(理论版);2010年03期

相关博士学位论文 前1条

1 尹峰;煤炭应急储备规模与布局研究[D];中国矿业大学(北京);2013年



本文编号:1933993

资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/gongyejingjilunwen/1933993.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户6d9e4***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com