BHEL交付使用在印度东北部最大的联合循环装置
发布时间:2018-10-11 19:05
【摘要】:正据《Gas Turbine World》2014年9-10月刊报道,印度重型电气公司已交付用在离阿格尔塔拉约50 km的特里普拉(位于帕拉塔纳)的2×363.3 MW燃气轮机联合循环电站第2台机组。OTPC(ONGC热电公司)的这个项目是在印度整个东北部该类电站中最大工程项目。帕拉塔纳项目的首台机组是在去年1月份交付使用的。
[Abstract]:As reported in the September-October 2014 issue of < Gas Turbine World >, Heavy-duty Electric India has delivered the project in Tripura, about 50 km from Agartala (2 x 363.3 MW gas turbine combined cycle power plant in Paralatana) for unit 2,. OTPC (ONGC Heat and Power Co., Ltd., which is located throughout India. The largest project of this kind of power station in the northeast. The first unit of the Paratana project was delivered in January last year.
【分类号】:F416.6
本文编号:2264928
[Abstract]:As reported in the September-October 2014 issue of < Gas Turbine World >, Heavy-duty Electric India has delivered the project in Tripura, about 50 km from Agartala (2 x 363.3 MW gas turbine combined cycle power plant in Paralatana) for unit 2,. OTPC (ONGC Heat and Power Co., Ltd., which is located throughout India. The largest project of this kind of power station in the northeast. The first unit of the Paratana project was delivered in January last year.
【分类号】:F416.6
【相似文献】
相关期刊论文 前7条
1 吉桂明;;用于联合生产的燃气轮机联合循环装置[J];热能动力工程;2008年06期
2 学牛;标准小型联合循环装置的价格[J];热能动力工程;1996年06期
3 廖勤;镇海增加350MW的联合循环装置[J];燃气轮机技术;1997年01期
4 吉桂明;;GE能源公司FlexEfficiency 50联合循环电站[J];热能动力工程;2012年03期
5 吉桂明;;用联合循环装置取代喷水的简单循环装置[J];热能动力工程;2013年02期
6 ;简讯[J];热能动力工程;2007年03期
7 ;[J];;年期
相关重要报纸文章 前1条
1 杨行年;年减少碳排放207万吨[N];中国审计报;2010年
,本文编号:2264928
本文链接:https://www.wllwen.com/jingjilunwen/gongyejingjilunwen/2264928.html