绿色建筑利益相关者风险识别与评估
本文选题:绿色建筑项目 切入点:利益相关者 出处:《天津大学》2015年硕士论文 论文类型:学位论文
【摘要】:建筑是能源消耗和环境问题的主要制造者,为实现可持续发展,绿色建筑应运而生。项目利益相关者是绿色建筑的成功推行主要因素之一,对各参与者的相关风险进行分析十分必要。然而,文献分析结果表明缺乏对我国绿色建筑利益相关者风险的识别与评估。本文在对我国绿色建筑典型案例分析的基础上,总结了绿色建筑成功推行的关键技术因素和市场因素,其中技术因素包括空调通风系统的广泛应用,市场因素则包括企业缺乏利益驱动、各方缺乏有效合作等。随后,通过文献阅读和“经典的基于经验的方法”识别出现阶段我国绿色建筑项目的10个关键利益相关者,包括业主、施工单位、设计单位、监理单位、分包单位、供应商、政府、金融机构、最终客户、物业管理;并通过焦点团体法将各利益相关者与项目的各个阶段对应,结果表明,决策阶段涉及的利益相关者最多,这也一定程度说明了该阶段的潜在风险较大。在文献阅读的基础上,得到与10个利益相关者有关共87个风险因素。最后,以中国铁建幸福塘绿色建筑项目为案例。通过文献和专家访谈识别了该项目各个关键利益相关者有关的41个关键风险,如通过专家访谈将“执行绿色建筑项目实施标准行为”列为业主的主要风险之一。构建了基于利益相关者的风险评估模型并运用属性层次模型进行风险评估,结果发现与设计单位、分包商和政府三方有关的风险较高,整体风险水平为中等偏低。本文从利益相关者角度构建了我国绿色建筑的风险评价指标体系以及评价方法,对加深各参与方对其相关风险的理解以及评估具有一定指导意义,也有利于后续风险分担和应对。
[Abstract]:Construction is the main producer of energy consumption and environmental problems. In order to achieve sustainable development, green building emerges as the times require. Project stakeholders are one of the main factors for the successful implementation of green building. It is necessary to analyze the relevant risks of each participant. However, the results of literature analysis show that there is a lack of identification and evaluation of the risk of the stakeholders of green building in China. Based on the analysis of typical cases of green building in China, The key technical factors and market factors for the successful implementation of green building are summarized. The technical factors include the extensive application of air conditioning and ventilation system, and the market factors include the lack of benefit driven by enterprises, the lack of effective cooperation between the parties and so on. Through literature reading and "classic experience-based methods" to identify 10 key stakeholders in green building projects in China during the emergence phase, including owners, construction units, design units, supervision units, subcontractors, suppliers, government, Financial institutions, end customers, property management; and through the focus group approach, stakeholders are matched to each stage of the project, and the results show that the decision-making phase involves the most stakeholders, This also explains to some extent the potential risks in this phase. Based on the reading of the literature, 87 risk factors related to 10 stakeholders have been obtained. Finally, In the case of China Railway Construction's Green Building Project, 41 key risks related to key stakeholders of the project were identified through literature and expert interviews. For example, "implementing standard behavior of green building project" is listed as one of the main risks of the owner through expert interviews. A stakeholder based risk assessment model is constructed and the attribute hierarchy model is used to evaluate the risk. The results show that the risk associated with the design unit, subcontractor and government is relatively high, and the overall risk level is on the low side. This paper constructs the risk evaluation index system and evaluation method of green building in China from the perspective of stakeholders. It has a certain guiding significance to deepen the understanding and evaluation of the relevant risks of the participants, and is also conducive to the subsequent risk sharing and coping.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.92;TU201.5
【相似文献】
相关期刊论文 前10条
1 季文;项目成功的12个关键原则[J];技术与市场.园林工程;2004年06期
2 梁松波;项目管理专业基础概述[J];上海标准化;2005年10期
3 张海东;;“法人管项目”下的人资管理[J];施工企业管理;2012年05期
4 徐亮辉;;汽车零部件企业的项目管理成熟度模型研究[J];上海汽车;2012年12期
5 和宏明;论西方项目范畴[J];基建优化;1998年03期
6 赛云秀;;项目三大目标相互作用分析[J];建筑经济;2008年08期
7 利镇有;何继善;;项目业绩系统评价模型及其改良研究[J];中国工程科学;2011年08期
8 卢锡雷;;“法人管项目”利弊何在[J];施工企业管理;2012年05期
9 许心华,崔婷;前进中的中德合作山东粮援项目[J];山东水利科技;1998年03期
10 秦刚;;成功的项目管理事业[J];江西建材;2014年07期
相关会议论文 前10条
1 ;征集项目一览表[A];2010’第五届绿色财富(中国)论坛会刊[C];2010年
2 赵彬;焦书长;;“三次会议”制度推进项目稳步持续发展[A];河南省建筑业行业优秀论文集(2010)[C];2010年
3 刘中平;周甄;李亚玲;马韬;;项目团队组织、分工与工作模式[A];2013年中国航空学会管理科学分会学术会议论文集[C];2013年
4 陈登慧;郭红梅;;水土保持执法项目目标竞争岗位责任制的形成与效益分析[A];水土保持监督管理论文选编[C];2003年
5 冯亮;;用项目管理模式开展ICT外包服务项目[A];海南省通信学会学术年会论文集(2006)[C];2006年
6 盛汉滨;樊军;王纪泉;;杭甬高速公路项目目标可持续发展评价[A];第一届全国公路科技创新高层论坛论文集环保与可持续发展卷[C];2002年
7 纪存兴;;项目管理在原子能院核电项目中的应用研究[A];中国核科学技术进展报告(第二卷)——中国核学会2011年学术年会论文集第10册(核情报(含计算机技术)分卷、核技术经济与管理现代化分卷)[C];2011年
8 杨来成;唐慧中;;改革管理机制 搞好藉河项目建设[A];中国水土保持探索与实践——小流域可持续发展研讨会论文集[C];2005年
9 王作功;贾元华;李素芬;;高速公路项目目标持续性评价指标体系及方法研究[A];可持续发展的中国交通——2005全国博士生学术论坛(交通运输工程学科)论文集(上册)[C];2005年
10 袁伟峰;;基于WBS的项目挣值分析及其应用[A];2011年中国航空学会管理科学分会学术交流会议论文集[C];2011年
相关重要报纸文章 前10条
1 崔晶炜;如何确定项目目标?[N];中国计算机报;2004年
2 记者 庄启e,
本文编号:1594927
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1594927.html