深基坑开挖对邻近既有地铁隧道影响规律研究
[Abstract]:With the rapid development of urban construction, in order to meet the convenience of daily travel of residents, the development and utilization of underground space become more and more common in the crowd gathering center in the first and second tier cities, so a large number of deep foundation pit projects appear in the city center. During the construction of this kind of foundation pit, the existing buildings, underground pipelines and adjacent subway tunnels will be affected. Therefore, how to accurately calculate the horizontal and vertical displacement of soil and subway tunnel in the design and construction of deep foundation pit, to ensure the safety of foundation pit itself and supporting structure, and the safety and normal use of adjacent buildings and subway tunnels, It is an urgent problem in foundation pit construction. In this paper, the 3D finite element model of the excavation foundation pit is established by using ANSYS finite element software combined with the DK-2 deep foundation pit project of Xi'an International Center, and the deformation of the retaining structure of the foundation pit during the excavation process is quantitatively analyzed. The uplift of the soil at the bottom of the foundation pit, the settlement of the surrounding soil and the horizontal and vertical displacement of the adjacent existing subway tunnel are studied, and the different horizontal distances between the tunnel and the foundation pit are studied. The horizontal and vertical displacement of the adjacent subway tunnel structure is affected by the influence factors of the tunnel under different soil conditions. The main conclusions are as follows: (1) at the beginning of foundation pit excavation, the earth pressure on both sides of the foundation pit is relatively small, and the deformation of the retaining structure of the foundation pit is less affected. With the increasing of the excavation depth, the horizontal and vertical displacement of the retaining pile body of the foundation pit is also increasing. However, the increasing amplitude of vertical displacement shows a decreasing trend. (2) during the excavation process, with the release of soil stress at the bottom of the foundation pit, the uplift of the soil at the bottom of the foundation pit increases continuously, and the maximum displacement reaches 28.8cm. (3) during the excavation of shallow soil, The deformation of soil around the foundation pit is approximately linear, but with the increase of excavation depth, there will be a certain nonlinear change. (4) during excavation, the deformation of tunnel is mainly horizontal displacement. And the horizontal displacement is far greater than the vertical displacement. (5) through the simulation of the different buried depth of the subway tunnel, the results show that the deformation of the tunnel gradually decreases with the increasing of the buried depth of the subway. When the buried depth is less than 20m, the variation of the buried depth has a great influence on the displacement of the tunnel, and when the depth is more than 20m, the influence is small. (6) through the simulation of the different horizontal distance between the subway tunnel and the supporting structure of foundation pit, the result shows that 7.5m is a critical point. In the process of increasing the horizontal distance from 7.5 m to 10 m, the amplitude of horizontal displacement of subway tunnel is the largest, reaching 42.2%. When the vertical displacement of subway tunnel increases from 10 m to 15 m, the reduction range of vertical displacement reaches 25.7m.
【学位授予单位】:西安建筑科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753
【相似文献】
相关期刊论文 前10条
1 刘兵;叶敬彬;余晓琳;颜全胜;;基坑开挖对邻近地铁影响的计算分析[J];科学技术与工程;2009年23期
2 张雪松;童博;罗天;;连续基坑开挖对相邻基坑的变形影响分析[J];广州大学学报(自然科学版);2012年02期
3 韩玲;土耳其正在进行奇内坝基坑开挖[J];水利水电快报;2000年18期
4 梁岗,曹志远,徐旭;地下工程中基坑开挖施工三维非线性时变计算分析[J];上海大学学报(自然科学版);2001年02期
5 王建勇,孟繁锋,袁英奇;深基坑开挖采用钢钣桩围堰防护施工的探讨[J];西部探矿工程;2001年04期
6 王生力,韩振富,刘唐生,裘平一;基坑开挖围护设计实例分析及问题探讨[J];工程勘察;2003年04期
7 姚念光 ,张良友 ,吴胜军;寒区适用的建筑物基坑开挖方法[J];水利天地;2003年09期
8 陈文海;南京河西某大型深基坑开挖与支护技术[J];江苏建筑;2004年01期
9 滕玉龙;高水位砂砾基坑开挖技术应用[J];甘肃科技;2004年05期
10 朱奎;仇乐民;吴冬虎;;深基坑开挖对邻近建筑物影响规律分析[J];工程勘察;2004年06期
相关会议论文 前10条
1 黄明;赵广强;;某基坑开挖对相邻高层建筑的影响分析[A];第九届全国现代结构工程学术研讨会论文集[C];2009年
2 侯悦琪;王建华;;基坑开挖对已有建筑影响分析[A];2010’力学与工程应用学术研讨会论文集[C];2010年
3 曾远;李志高;王毅斌;;基坑开挖对邻近地铁车站影响因素研究[A];上海软土地深基坑技术新进展研讨会论文集[C];2005年
4 武法伟;李方明;;基坑开挖与降水引起的周边地表沉降变形耦合计算[A];第九届全国工程地质大会论文集[C];2012年
5 谭晓恒;徐晓东;;河南省地质工程公司办公楼 深基坑开挖及支护简述[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
6 陈观胜;陈雪仙;郑旭晨;;深基坑开挖对周围建筑物的保护施工实践[A];中国土木工程学会市政工程分会2000年学术年会论文集[C];2000年
7 丁锐;范鹏;焦苍;徐成家;张文强;;建筑物受深基坑开挖影响的显式差分分析[A];2005全国地铁与地下工程技术风险管理研讨会论文集[C];2005年
8 陆培炎;曹洪;杨光华;李思平;熊丽珍;陈晓文;方大勇;;广东深基坑开挖工程实例[A];陆培炎科技著作及论文选集[C];2006年
9 严平;龚晓南;李建新;;软土地基中深基坑开挖围护的工程实践[A];中国土木工程学会土力学及基础工程学会地基处理学术委员会第四届地基处理学术讨论会论文集[C];1995年
10 陈郁;张冬梅;;基坑开挖对下卧隧道隆起的实测影响分析[A];全国城市地下空间学术交流会论文集[C];2004年
相关重要报纸文章 前8条
1 宋政琳邋邓继明;南京地铁河定桥站基坑开挖方案通过论证[N];人民铁道;2007年
2 张阿五 姚百祥 周长标;嘉兴市国际中港城超大型基坑开挖探讨[N];中国建设报;2005年
3 本报记者 冯tD 通讯员 徐昭;挑战“世界难题”[N];宁波日报;2010年
4 符能江 陆文忠;科学施工为潮州供水枢纽工程开路[N];中国水利报;2005年
5 记者 龙舟 和光亚;昆明地铁3号线开建[N];云南日报;2011年
6 记者 张遥;杭州楼降降 车过楼晃晃[N];新华每日电讯;2010年
7 张晓宏;福田车站:混合型枢纽的挑战[N];国际商报;2009年
8 冯tD 徐昭 邓明军 张绘薇;千丘万壑春风暖[N];宁波日报;2010年
相关博士学位论文 前8条
1 魏少伟;基坑开挖对坑底已建隧道影响的数值与离心试验研究[D];天津大学;2010年
2 马石城;基坑开挖的弹塑性与流变分析及其应用[D];湖南大学;2001年
3 秦昊;地铁车站基坑开挖对邻近地下管线的影响研究[D];中国地质大学(北京);2010年
4 宗金辉;深基坑开挖有限元模拟及现场实测研究[D];天津大学;2006年
5 倪才胜;基坑开挖渗流研究及其工程应用[D];中国科学院研究生院(武汉岩土力学研究所);2008年
6 张春会;基坑开挖的数值模拟及土体本构模型和参数反演研究[D];中国海洋大学;2007年
7 俞晓;深基坑开挖与支护的模型试验与ANSYS分析研究[D];武汉理工大学;2005年
8 丁江澍;城市地下结构施工对邻近构筑物影响的研究[D];长安大学;2013年
相关硕士学位论文 前10条
1 陆琰;明挖联络通道对既有车站结构影响分析研究[D];中国地质大学(北京);2015年
2 李国龙;基坑开挖对邻近既有隧道的影响分析[D];青岛理工大学;2015年
3 卜佳;基坑开挖对既有地铁隧道的变形影响研究[D];中国地质大学(北京);2015年
4 闫兴宝;复杂地层条件下深基坑施工对下卧地铁隧道结构影响研究[D];长安大学;2015年
5 贾银虎;基坑开挖变形数值模拟研究[D];河北工程大学;2015年
6 赵笑男;深基坑开挖对邻近既有地铁隧道影响规律研究[D];西安建筑科技大学;2015年
7 黎科;深基坑开挖对邻近桥桩的影响研究[D];天津大学;2007年
8 赵志俊;基坑开挖对邻近建筑物变形影响数值分析[D];合肥工业大学;2010年
9 师晓权;基坑开挖对下卧隧道影响的研究[D];西南交通大学;2008年
10 龙善新;基坑开挖的变形效应对桩基承载力的影响[D];汕头大学;2011年
,本文编号:2138941
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2138941.html