高层混凝土框架—核心筒结构施工期安全性研究
[Abstract]:According to incomplete statistical data, at least 2/3 of the project collapse safety accidents occur in the construction stage. To reduce the probability of safety accidents in the construction period of the high-rise concrete structure and to form the safety control system for the construction period of the high-rise building concrete structure, it must be built on the construction of the concrete structure of the high-rise building. The concrete frame core tube structure, as an important high-rise and super high rise building structure, has been widely used in our country in recent years. At the same time, the continuous occurrence of safety accidents in construction has brought great challenges to the engineering and academic circles of our country. In the construction period of concrete, the material performance is unstable, the construction load is more complex and the force is large and changeable. It has the time-varying characteristics of the concrete structure performance with time. Therefore, it is more complicated and difficult to study the performance of the concrete structure during the construction period. In this paper, the time-varying performance of concrete materials in the construction period, the joint action mechanism of the concrete structure and the temporary formwork support system, the measured study on the loading of the vertical member in the whole process of the construction of the concrete frame core tube structure in the high building, as well as the experimental research and theoretical analysis of the reliability of the high-rise concrete structure, and the theoretical analysis in this paper. In view of the strength characteristics of the present high building concrete, the compressive strength and modulus of the concrete material are tested with the time-varying characteristics of the standard curing age. The function of the compressive strength and modulus of concrete with the increase of the age of the concrete is established and the nonlinear minimum 2 is adopted. The parameters of the fitting equation are given by the multiplicative algorithm. According to the material characteristics of the HPC used in the high-rise building structure, the experimental study on the time-varying characteristics of the compressive strength and modulus of concrete with different strength grade, different water binder ratio, different fly ash content and different admixture content of concrete with the standard curing age is carried out. The effect of water glue ratio, admixture and fly ash content on the time-varying performance of HPC is summarized. Based on the construction of Chongqing Zhonghua new town project, the structure performance of the time-varying structure system is simulated and analyzed by the simulation model established by finite element software. The construction proposal and control measures are given. 2 test models of two storey single span reinforced concrete frame are made in the laboratory. The experimental study on the effects of loading of the model frame on the model frame, the construction period, the age of concrete and other factors on the common effect of the concrete structure and the temporary formwork support system during the construction period is studied. The joint action law of concrete structure and temporary formwork support system during the construction period is less than the load of cracking load. Taking the Zhongshan international financial center project as the background, using reasonable test means, the loading deformation of the concrete frame core tube structure of the concrete frame core tube structure with different strength grade of the concrete vertical member during the construction process. The field monitoring is carried out, and the development law of the bearing deformation of the vertical member of the concrete frame core tube structure in the construction period is summarized. The dynamic model based on the structural reliability analysis is based on the two storey frame model test and the typical structure of the Chongqing Zhonghua new town project, and the concrete structure characteristics of the construction period are combined. By using the Monte Carlo stochastic algorithm, the reliability analysis method of concrete structure during construction period is put forward by Monte Carlo stochastic algorithm, and the construction proposal of concrete structure during construction period is put forward according to the calculation results.
【学位授予单位】:重庆大学
【学位级别】:博士
【学位授予年份】:2015
【分类号】:TU973.17;TU974
【相似文献】
相关期刊论文 前10条
1 苏幸福;浅谈抗渗抗冻混凝土的配制与施工要求[J];安徽建筑;2000年06期
2 王克强;功能奇特的混凝土[J];武汉科技大学学报(自然科学版);2000年02期
3 熊子发;论混凝土裂缝、坍塌的原因和对策[J];混凝土;2002年07期
4 程宜;混凝土裂缝与坍塌的质量控制[J];筑路机械与施工机械化;2003年01期
5 张松洪;析混凝土非结构受力裂纹[J];中外建筑;2003年04期
6 谢尚能;混凝土非结构受力裂纹的分析[J];中外建筑;2004年04期
7 王鹏;混凝土常见裂缝的预防与处理[J];安徽电气工程职业技术学院学报;2004年03期
8 杨军,纪润强;混凝土胀模原因分析及对策[J];散装水泥;2004年04期
9 王俊海;混凝土裂缝的预防与处理[J];甘肃科技;2005年11期
10 曹仕娟;;浅谈粉煤灰在混凝土中的应用[J];科技信息;2006年04期
相关会议论文 前10条
1 侯付根;常斌;张志强;;混凝土裂缝产生的原因与补救措施[A];河南省建筑业行业优秀论文集(2006)[C];2006年
2 张慧;张广华;;现浇混凝土裂缝产生的原因与防治[A];山东水利科技论坛2006[C];2006年
3 陆冰洋;李志超;;浅析混凝土裂缝的成因、预防与处理[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
4 张定前;;预拌混凝土关键环节质量控制要点研究[A];矿山建设工程新进展——2006全国矿山建设学术会议文集(下册)[C];2006年
5 何冬明;;防水抗裂混凝土在地下工程中的应用[A];中国土木工程学会隧道与地下工程分会防水排水专业委员会第十五届学术交流会论文集[C];2011年
6 沈典巍;;九宫山风力发电基础的混凝土浇注[A];地基基础工程与锚固注浆技术:2009年地基基础工程与锚固注浆技术研讨会论文集[C];2009年
7 王军民;;混凝土早期裂缝控制技术研究[A];2013年混凝土与水泥制品学术讨论会论文集[C];2013年
8 陈志量;张业明;穆e鹒g;方达经;林安;甘复兴;;浅谈海水对混凝土沉管隧道的腐蚀与防护[A];第七届全国表面工程学术会议暨第二届表面工程青年学术论坛论文集(一)[C];2008年
9 黄泽林;张立敏;许德亮;;某商住楼剪力墙混凝土置换处理研究[A];中国老教授协会土木建筑(含建筑物改造与病害处理)专业委员会全国第九届建筑物改造与病害处理学术研讨会论文集[C];2011年
10 于战涛;黄欣;;浅析混凝土裂缝原因及控制[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
相关重要报纸文章 前10条
1 段红生;浅谈我市预拌混凝土产业的发展[N];临汾日报;2006年
2 本报实习记者 任晶惠;逐步消除混凝土质量通病[N];中国交通报;2009年
3 安徽省散装水泥办公室;安徽太湖县推广使用预拌混凝土措施及启示[N];中华建筑报;2009年
4 江苏省宿迁市泗洪县住房和城乡建设局建筑业管理处 张宗标;浅谈混凝土裂缝的成因与对策[N];中华建筑报;2011年
5 韩先福;改善产业发展环境 迈向低碳绿色之路[N];中国建材报;2011年
6 广安市广安区花桥水利技术推广站 程国凌;如何控制普通混凝土出现的裂缝[N];四川科技报;2010年
7 潘学根;混凝土早期受冻与预防措施[N];山西科技报;2001年
8 代为国;混凝土滴灌节水保湿养生技术简述[N];中华建筑报;2010年
9 山西金信建筑有限公司 陈保金;混凝土早期受冻与预防措施[N];山西科技报;2002年
10 善鄯;搅拌站跟着工程走[N];中华建筑报;2007年
相关博士学位论文 前6条
1 汤庆荣;高层混凝土框架—核心筒结构施工期安全性研究[D];重庆大学;2015年
2 杨健辉;侧压下混凝土静态受拉与受拉疲劳性能研究[D];大连理工大学;2003年
3 高原;干湿环境下混凝土收缩与收缩应力研究[D];清华大学;2013年
4 于海祥;基于理想无损状态的混凝土弹塑性损伤本构模型研究及应用[D];重庆大学;2009年
5 牛建刚;一般大气环境多因素作用混凝土中性化性能研究[D];西安建筑科技大学;2008年
6 宋军;混凝土索塔开裂行为的宏细观力学分析[D];重庆交通大学;2014年
相关硕士学位论文 前10条
1 李建新;大型LNG储罐穹顶施工数值仿真分析[D];东北石油大学;2012年
2 周潇雨;高温后混凝土微裂纹分形分析[D];华南理工大学;2010年
3 许懿;快速应变率下混凝土单轴受拉本构关系试验研究[D];河北理工大学;2010年
4 王祥鲁;混凝土桥梁钢筋锈蚀机理及防治对策研究[D];长安大学;2003年
5 韩光翔;光弹贴片法实验研究混凝土Ⅰ-Ⅱ复合型断裂[D];大连理工大学;2008年
6 李茂光;西部温湿度条件下混凝土体积变形与开裂规律研究[D];哈尔滨工业大学;2013年
7 常洪雷;环境作用下混凝土内部相对湿度与宏微观性能演变研究[D];青岛理工大学;2013年
8 陈月霞;改性魔芋葡甘聚糖制备混凝土脱模养护一体化材料的研究[D];北京化工大学;2010年
9 宣方龙;混凝土双参数和双K参数模型的比较研究[D];大连理工大学;2002年
10 张忠;预应力混凝土管桩填芯混凝土抗拔试验研究及理论分析[D];合肥工业大学;2006年
,本文编号:2172342
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2172342.html