莱州市云峰壹号二期进度控制研究
[Abstract]:Project schedule management is a management method that integrates project time and investment control, resource optimization, project schedule planning and management. With the rapid development of domestic economy, the quantity and scale of project construction are increasing. As one of the key contents of project management, the optimization and control of schedule is closely related to the cost, duration and quality of the project. It is also an important measure to ensure the completion of the project on time, to arrange the supply of resources scientifically and to save the cost, which directly affects the smooth construction of the project and relates to the reputation and benefit of the construction unit. At present, the research of project schedule management mainly focuses on the time and cost control and optimization of the project, and seeks a balance between the project construction time and the construction cost. The method of schedule management is to manage the schedule of a single project without the restriction of project resources, but in the actual work, There is a phenomenon of mutual influence and competition for resources among many projects or processes within projects. Therefore, how to coordinate the progress of projects under the condition of limited resources has become a key issue for scholars to study. Based on the comprehensive analysis of the status quo of project schedule management and construction schedule management at home and abroad, this paper aims at the problems existing in the current construction project schedule control. Combined with the actual situation of the second phase of project schedule management in Yunfeng No. 1, Laizhou, mainly from the project schedule planning, schedule optimization to the project and progress control management and implementation of analysis and research, The main research contents of this paper include the following aspects: (1) introduce the background and general situation of the second phase project of Yunfeng No. 1 in Laizhou City, analyze the characteristics and construction difficulties of the project and the risks faced by the project schedule management. This paper puts forward the necessity of the schedule management of the second phase of Yunfeng 1 project. (2) decomposing the WBS task of the second phase of Yunfeng 1 project in Laizhou City, analyzing the logical relationship of the project work, and compiling the horizontal road diagram of the project schedule plan by using the CMP method. The corresponding key routes and duration of Yunfeng 1 Phase II project are preliminarily determined. (3) the theory of critical chain and the optimization of project schedule are analyzed, including the classification of work tasks, the elimination of working procedure safety time, and the identification of project bottleneck resources. The key chain of the construction project, the setting and calculation of the project buffer, the calculation of the working elasticity coefficient and the calculation of the project buffer are determined. For an engineering example, this paper analyzes the second phase project schedule of Yunfeng No. 1 project by using the key chain theory (CMM method) and draws up the progress plan of the project. (4) according to the characteristics of the project, the author analyzes the advantages of the CMM method. (4) according to the characteristics of the project, the organization and technology are introduced. On the basis of contract and management, economy and information, this paper puts forward the guarantee measures, prevention and correction measures for the progress plan of the project. Based on the theory of key chain, the dynamic control and management method of construction schedule is put forward.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU722
【相似文献】
相关期刊论文 前10条
1 时润生;试论监理进度控制的方式[J];建设监理;2002年01期
2 李永奎,王井祥;结构化集成进度控制模式的研究和实践[J];基建优化;2003年06期
3 裴剑平;浅析施工阶段的进度控制[J];山西建筑;2005年04期
4 殷照生;;以质量优化成本 以进度控制成本[J];治淮;2006年08期
5 佘荣;;质量与进度控制在施工中的作用与关系[J];科技咨询导报;2007年23期
6 韩少辉;;浅析施工阶段的进度控制[J];中国水运(下半月);2008年01期
7 林韩龙;;进度控制理论和方法的探讨[J];广东建材;2008年10期
8 赵瑞卿;;公路施工成本、质量和进度控制[J];黑龙江交通科技;2009年09期
9 邵启德;;浅析如何发挥进度控制的作用[J];山西建筑;2010年06期
10 武强;;谈项目部进度控制的方法和措施[J];山西建筑;2012年04期
相关会议论文 前10条
1 毋琨;常中刚;李新庄;;监理如何做好工程建设的进度控制工作[A];河南省建筑业行业优秀论文集(2005)[C];2005年
2 杨利利;屠望;;浅谈业主对工程项目建设的进度控制[A];土木建筑学术文库(第16卷)[C];2012年
3 段红策;;项目计划进度控制与资源管理[A];河南省土木建筑学会2008年学术交流会论文集[C];2008年
4 乔军;;浅谈项目的进度控制[A];建材建设工程优秀论文集[C];2011年
5 余应厚;;工程建设施工阶段的进度控制[A];河南省土木建筑学会2010年学术大会论文集[C];2010年
6 王鑫;温红运;;谈建筑施工项目控制中的进度控制[A];土木建筑学术文库(第9卷)[C];2008年
7 胡晓聪;康汝杰;湛丽;;量化合同进度控制体系应用研究[A];中国核科学技术进展报告(第二卷)——中国核学会2011年学术年会论文集第10册(核情报(含计算机技术)分卷、核技术经济与管理现代化分卷)[C];2011年
8 陈友杰;;浅谈建设工程项目的进度控制[A];第五届全国矿山采选技术进展报告会论文集[C];2006年
9 张方良;李健;;P3E/C在石化项目实施阶段进度控制中的应用[A];2010年石油石化行业建设工程总承包与项目管理论坛文集[C];2010年
10 石继光;张鹏辉;;对当前监理进度控制工作的几点思考[A];土木建筑学术文库(第7卷)[C];2007年
相关重要报纸文章 前10条
1 记者 张建平;今年一季度我州安全生产控制指标平稳运行[N];大理日报(汉);2007年
2 记者 张建平;上半年我州安全生产整体运行平稳[N];大理日报(汉);2007年
3 记者 张建平 通讯员 苏云;我州一至九月安全生产运行平稳[N];大理日报(汉);2007年
4 ;常德市安全生产委员会办公室关于2010年1至5月全市生产安全事故及指标控制情况的通报[N];常德日报;2010年
5 梁英;浅议进度控制和质量控制在建筑施工中的作用[N];伊犁日报(汉);2010年
6 记者 张建平;我州1—9月安全生产运行平稳[N];大理日报(汉);2006年
7 记者 张建平;我州安全生产运行平稳[N];大理日报(汉);2006年
8 单晓敬;软包装企业如何做好生产与物料控制[N];中国包装报;2008年
9 王迪海 龚小忠(作者单位:浙江中联建设集团有限公司);浅谈施工项目的进度控制[N];建筑时报;2007年
10 记者 谢春阳;湖南通报指标进度[N];中国安全生产报;2005年
相关硕士学位论文 前10条
1 徐鹏;网络游戏项目的研发进度控制研究[D];昆明理工大学;2015年
2 毛亚南;A变电站建设项目进度管理研究[D];复旦大学;2013年
3 魏圣亭;电力工程施工阶段的进度控制[D];山西大学;2015年
4 宋晓华;基于关键法中小建筑企业施工项目的进度控制研究[D];江西理工大学;2015年
5 王友峰;煤矿企业项目管理信息系统的设计与实现[D];电子科技大学;2014年
6 李U,
本文编号:2176750
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2176750.html