BIM技术在先进核电工程钢筋深化设计中的应用
发布时间:2018-11-25 17:40
【摘要】:以华龙一号、高温气冷堆为代表的先进核电示范工程大多属于设计、施工、修改并行工程,引入BIM技术,将核电规则融入其中,从而将BIM技术应用于钢筋深化设计并详细阐述BIM模式的优势。
[Abstract]:Most of the advanced nuclear power demonstration projects, represented by Hualong No. 1 and HTGR, belong to design, construction, modification of concurrent engineering, introduction of BIM technology, and incorporation of nuclear power regulations into them. Thus, the BIM technology is applied to the deepening design of steel bar and the advantages of BIM mode are expounded in detail.
【作者单位】: 中国核工业二四建设有限公司;
【分类号】:TU755.3;TU17
[Abstract]:Most of the advanced nuclear power demonstration projects, represented by Hualong No. 1 and HTGR, belong to design, construction, modification of concurrent engineering, introduction of BIM technology, and incorporation of nuclear power regulations into them. Thus, the BIM technology is applied to the deepening design of steel bar and the advantages of BIM mode are expounded in detail.
【作者单位】: 中国核工业二四建设有限公司;
【分类号】:TU755.3;TU17
【相似文献】
相关期刊论文 前10条
1 段新瑞;王晨香;;“关注中国核电工程建造”座谈会与会代表强调 要进一步提升核电工程自主建造能力[J];中国核工业;2006年09期
2 刘江华;丁晓明;;我国核电工程建设项目经济评价规范现状及应对[J];中国民营科技与经济;2006年10期
3 ;鞍钢研发核电工程用钢成功填补国内空白[J];钢铁;2010年02期
4 ;福清核电工程3号机组开工建设[J];电力安全技术;2011年01期
5 冯家举;;持续提升核电工程建造能力[J];中国核工业;2011年08期
6 ;中国核电工程公司成立[J];中国核工业;2006年04期
7 祖斌;;实施战略整合 适应新一轮核电工程建造需要[J];中国核工业;2006年09期
8 郭\,
本文编号:2356915
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2356915.html