超大PC构件起吊结构分析
发布时间:2018-12-14 17:09
【摘要】:预制超大剪力墙由于自重和尺寸较大,在初期混凝土强度不是很高的情况下脱模起吊,容易使墙板产生裂缝或发生危险,因此保证墙板的完整性和吊装的安全性是极其重要的事情,必须进行吊装内力分析,运用力学计算方法合理确定起吊吊点位置,以减少初期起吊对墙板的损害。
[Abstract]:Because of the large weight and size of prefabricated super-large shear wall, when the initial strength of concrete is not very high, the wall board is easy to be cracked or dangerous. Therefore, it is very important to ensure the integrity of the wall board and the safety of the hoisting. It is necessary to analyze the internal force of the lifting and use the mechanical calculation method to determine the location of the lifting point reasonably, so as to reduce the damage caused by the initial lifting to the wall board.
【作者单位】: 中国十七冶集团有限公司;
【分类号】:TU37;TU756
本文编号:2378993
[Abstract]:Because of the large weight and size of prefabricated super-large shear wall, when the initial strength of concrete is not very high, the wall board is easy to be cracked or dangerous. Therefore, it is very important to ensure the integrity of the wall board and the safety of the hoisting. It is necessary to analyze the internal force of the lifting and use the mechanical calculation method to determine the location of the lifting point reasonably, so as to reduce the damage caused by the initial lifting to the wall board.
【作者单位】: 中国十七冶集团有限公司;
【分类号】:TU37;TU756
【相似文献】
相关期刊论文 前10条
1 姜鼎俊;;板、梁构件合理吊点位置的选择[J];建筑技术;1986年03期
2 江正荣;;变截面柱两点绑扎起吊吊点位置的计算[J];建筑工人;1996年03期
3 宋开爽;任广平;赵青;侯旭魁;;变截面柱吊点位置选择[J];工业建筑;2006年S1期
4 周泽来;工业厂房施工中吊装柱子吊点位置确定与计算[J];甘肃科学学报;2004年04期
5 江正荣;;变截面柱一点绑扎起吊吊点位置的计算[J];建筑工人;1996年04期
6 江正荣;;等截面预制构件一点绑扎吊点位置的计算[J];建筑工人;1995年12期
7 傅钟鹏;;确定预制柱吊点位置的计算[J];建筑技术;1981年03期
8 艾宇光;;塔式起重机水平臂架吊点位置探讨[J];建筑机械化;1984年05期
9 吴玉厚;宋国仓;张珂;吴杰;孙佳;;U型高处作业平台提升吊点位置分布[J];沈阳建筑大学学报(自然科学版);2010年03期
10 毕永道;;按等弯矩法确定塔吊水平臂架单吊点位置的通用方程[J];建筑机械化;1987年01期
相关会议论文 前1条
1 齐朝晖;徐新生;曲牧;;吊挂结构悬索吊点位置的优化[A];第十届全国结构工程学术会议论文集第Ⅲ卷[C];2001年
,本文编号:2378993
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2378993.html