约束混凝土柱组合梁框架节点及框架施工技术
[Abstract]:As a new frame, the constrained concrete column composite beam frame has the characteristics of good self-weight and light anti-seismic performance. The existing specifications and procedures have no relevant provisions for the design and construction of such a frame. In this paper, the seismic performance, the node construction technology, the high-strength and continuous composite spiral hoop construction technology of the cast-in-place confined concrete column composite beam frame, the connection node of the prefabricated part of the combined beam frame of the integral restrained concrete column and the construction technology of the integral frame are assembled, and the system research is carried out. The main research contents and conclusions are as follows: (1) By the quasi-static test, the anti-seismic performance of the lower wing edge weakening node at the end plate 10-node steel plate band is studied. The results show that the restraint of the end plate and the steel plate band of the node changes the brittle shear failure of the node to the ductile shear failure; the flange of the steel beam in the node is equivalent to the pull rod in the pressure rod-pull rod model, and the edge of the steel beam in the node is weakened against the earthquake resistance, in that invention, the anti-seismic performance of the node can be improve by the increase of the bolt and the reinforcement of the weakened wing, so that the anti-seismic performance of the node should be fully reinforced; (2) the concrete in the core region of the column node in a wide-end plate and a node steel plate hoop constraint is adopted, in that invention, the ratio of the volume of the stirrups in the height range of the edge of the combined beam in the node is improve; the concrete in the core area of the side column node is restrained by the end plate and the node steel plate hoop, The volume distribution of the high-range stirrup of the combined beam in the node is equivalent to that of the high-range stirrups at the edge of the combined beam in the edge-weakening node, and the quasi-static test is carried out on the four wide-edge reinforcement connecting nodes. The results show that the restraint effect of the wide end plate + node steel plate hoop is better than that of the end plate and the node steel plate hoop, in that case of avoid the local shear failure and the local pressure failure of the concrete, the end plate and the node steel plate hoop can exert the constraint effect on the concrete; and (3) the stress mechanism of the node is discussed on the basis of the test research on the beam-column node of the combined beam of the confined concrete column, The calculation formula of the shear bearing capacity of the beam-column joint is proposed, the calculated value of the formula and the test value are in good agreement with the test value, and the formula is simple and practical; (4) the repeated loading test of one cast-in-place comparison beam and the low-cycle repeated loading test of the four outer-clad steel pipe and the bolt rod connecting column are carried out through two outer-clad steel pipe + bolt-rod connecting beams, In this paper, the performance of the connecting mode of the steel tube and the bolt rod for the anchoring of the longitudinal bars on both sides of the joint and the filling of the grouting material is studied, and the mechanism of its force is also analyzed. The steel pipe of the outer bag and the connecting beam of the bolt rod do not have a steel bar sliding phenomenon, so that the anchoring performance of the steel pipe joint is good; the bearing capacity and the ductility of the assembled integral beam are good in the cast-in-place beam, and the connection mode of the outer bag steel pipe and the bolt rod is reliable; the connecting column of the outer bag steel pipe and the bolt rod is not damaged at the joint, and the ductility is good; It is indicated that the connecting mode of the steel pipe and the bolt rod of the steel pipe with the longitudinal bars on both sides of the joint and the grouting material is reliable and the anti-seismic performance is good. When the longitudinal bar in the column is dense, the construction measures of the steel sleeve anchor reinforcement are put forward; and (5) the anti-shear performance of the plate-plate connecting node of different construction plates is studied, and the stress mechanism of the steel sleeve is analyzed. The results show that the side of the plate is in the form of a groove, and the lower beards on the side of the plate are welded into the form of a tripod, which can effectively resist shear and have good ductility. The connection structure of the plate and the plate (beam) is given according to the test results; (6) the construction technology of the cast-in-place frame beam-column node, the high-strength continuous composite spiral hoop and the assembled integral-restrained concrete column combined beam without temporary support is studied. The engineering practice shows that when the node construction technology is given, the labor-saving is labor-saving, and the two nodes are convenient for concrete pouring and the construction site reflects well; the high-strength continuous composite spiral hoop construction technology provided herein can meet the construction requirements and is simple and fast, The efficiency is more than 2 times higher than that of the conventional stirrups; with respect to the regular stirrups, the use of the high-strength stirrups can save the steel bar by 50%; the construction process of the assembled integral-restrained concrete column composite beam frame is reasonable, and the construction speed is more than 50% more than that of other assembled integral structures.
【学位授予单位】:大连理工大学
【学位级别】:博士
【学位授予年份】:2015
【分类号】:TU375.4;TU755
【参考文献】
相关期刊论文 前10条
1 郭子雄;朱奇云;刘阳;黄群贤;;装配式钢筋混凝土柱-钢梁框架节点抗震性能试验研究[J];建筑结构学报;2012年07期
2 余琼;闻文;戴绍斌;;钢梁混凝土柱节点中梁贯穿与柱贯穿节点受力性能对比[J];四川建筑科学研究;2012年03期
3 闫维明;王文明;陈适才;李洪泉;高杰;;装配式预制混凝土梁-柱-叠合板边节点抗震性能试验研究[J];土木工程学报;2010年12期
4 张略秋;;钢梁-混凝土柱L型刚性节点性能试验和应用[J];武汉大学学报(工学版);2009年S1期
5 戴绍斌;李兵;林明森;黄俊;;钢梁-混凝土柱柱贯穿型节点抗震性能研究[J];武汉理工大学学报;2009年10期
6 蔡建国;冯健;王赞;朱洪进;;预制预应力混凝土装配整体式框架抗震性能研究[J];中山大学学报(自然科学版);2009年02期
7 吕西林;范力;赵斌;;装配式预制混凝土框架结构缩尺模型拟动力试验研究[J];建筑结构学报;2008年04期
8 王会丽;李升才;;蜂窝钢梁—混凝土柱组合节点抗震性能试验研究[J];郑州大学学报(工学版);2008年02期
9 黄俊;徐礼华;戴绍斌;;混凝土柱-钢梁边节点的拟静力试验研究[J];地震工程与工程振动;2008年02期
10 陆铁坚;贺子瑛;余志武;肖林红;;钢-混凝土组合梁与混凝土柱节点的抗震性能试验研究[J];建筑结构学报;2008年01期
相关博士学位论文 前3条
1 司炳君;普通及高强钢筋混凝土桥墩地震抗剪强度研究[D];大连理工大学;2008年
2 陈丽华;新型外包钢—混凝土组合连续梁及梁柱节点的试验研究[D];东南大学;2006年
3 马宏伟;组合梁与连续复合螺旋箍混凝土柱节点研究[D];西安建筑科技大学;2003年
相关硕士学位论文 前3条
1 王哲夫;钢梁—钢筋混凝土柱柱贯穿型节点受力性能研究[D];武汉理工大学;2007年
2 李云涛;混凝土柱—钢梁梁贯穿型节点受力性能研究[D];武汉理工大学;2007年
3 易勇;钢梁—钢筋混凝土柱组合框架中间层中节点抗震性能试验研究[D];重庆大学;2005年
,本文编号:2430583
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2430583.html