旅游职业学院2#学生公寓建设工程造价管理研究
[Abstract]:At present, the number of college students is increasing year by year, and the increase of the number of college students puts forward higher requirements for the conditions of running schools, which makes colleges and universities constantly improve the construction of infrastructure in order to meet their own development needs. The construction of infrastructure is a work of great investment and long-term benefit for colleges and universities, which is very important to the development of colleges and universities. Therefore, how to manage and control the investment of infrastructure construction effectively, reasonably manage the cost and maximize the benefit under the premise of safety, economy, applicability and energy saving is the key to the project construction in colleges and universities, and it is also an important problem in the development of colleges and universities. In this paper, the construction of 2 # student apartment in tourism vocational college is effectively controlled by using the principles of system science, management, (WBS), operational research, project management and the basic theory of engineering cost management, and aiming at the feasibility study and investment estimation in the early planning stage of the engineering project construction of tourism college. The scheme optimization and the application of value engineering principle in the investigation and design stage, the bill of quantities valuation and reasonable bid evaluation in the bidding stage, the construction progress and cost in the project implementation stage, and the settlement review in the completion and settlement stage are deeply analyzed, and the basic theory of the whole process cost management is explained in detail. In the whole process of cost management, relying on the actual situation of each stage of the project cost, this paper analyzes the causes of the project cost, analyzes and evaluates the risks existing in the current construction project cost management, and further puts forward the corresponding solutions in order to effectively control the project cost.
【学位授予单位】:哈尔滨理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU723.3
【参考文献】
相关期刊论文 前10条
1 马桂芬;陆世岩;;工程竣工结算阶段造价管理措施研究[J];红水河;2013年04期
2 尹中立;;解读新一轮房地产调控[J];当代经济管理;2013年04期
3 何永恒;李进;;项目的敏感性分析[J];交通科技与经济;2012年04期
4 李岩;;决策阶段投资估算的策略与方法探讨[J];山西建筑;2012年07期
5 郑忠哲;;建设项目全过程工程造价控制[J];科技创新与应用;2012年01期
6 李欣;查京民;李豪杰;庄洪涛;;基于案例推理的港口工程建设风险评价研究[J];港工技术;2011年05期
7 李晓宁;宋妤;;基础设施建设项目投资估算编制方法与问题探讨[J];铁路工程造价管理;2011年04期
8 柳志慧;熊周兰;;谈工程造价管理的必要性[J];中国招标;2011年10期
9 李磊;;建设项目技术经济评价敏感性分析[J];改革与开放;2010年24期
10 唐林凤;;建筑工程造价快速估算的研究[J];价值工程;2010年30期
相关硕士学位论文 前9条
1 查富军;房地产项目工程造价的控制[D];天津大学;2012年
2 李红菊;工程项目造价管理与实证研究[D];西安建筑科技大学;2012年
3 冯仕静;学生宿舍建设工程造价管理研究[D];长沙理工大学;2012年
4 刘潇;珠三角大学生宿舍整合生态设计[D];华南理工大学;2011年
5 孙传菲;现代高校学生公寓优化设计研究[D];东华大学;2011年
6 胡波;对建筑工程全过程造价管理的研究[D];天津大学;2010年
7 邓琼;高等学校学生公寓投资模式研究[D];湘潭大学;2010年
8 陈蔚;建设项目设计阶段工程造价的控制研究[D];西安建筑科技大学;2007年
9 华荷锋;高校学生社区建设研究[D];河海大学;2006年
,本文编号:2498554
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2498554.html