整体式拼缝连接的预制楼板-预制剪力墙节点试验
[Abstract]:In order to study the mechanical behavior of precast floor-precast shear wall joints with integral joint under vertical load at cantilever end of precast floor, the static tests of one side joint specimen and two middle joint specimens were carried out. The results show that the crack distribution of the three specimens is the same, and all of them are bending failure, the vertical load-deflection curve of the cantilever end of the floor before the ultimate state of bearing capacity of the three specimens is basically the same, the bending bearing capacity of the fixed end of the precast floor is not much different, and the average ratio with the calculated value of the code formula is 1.29. The steel bar tension of the precast floor can be effectively transmitted by the sleeve extrusion lap connection. The integral joint can ensure the integrity of the fully assembled floor. When the assembled shear wall structure adopts the fully assembled floor, the prefabricated floor and the prefabricated wall can be connected by the integral joint of the specimen in this paper.
【作者单位】: 土木工程安全与耐久教育部重点实验室(清华大学);内蒙古蒙西工程设计有限公司;
【分类号】:TU398.2
【相似文献】
相关期刊论文 前10条
1 石光兴;预制楼板地面顺板向裂缝的原因及防治[J];塔里木农垦大学学报;2004年02期
2 董金国;预制楼板顺板缝方向缝的防治[J];科技资讯;2005年22期
3 路兴旺;;预制楼板地面沿板缝方向裂缝的原因与防治[J];油气田地面工程;2007年05期
4 张霞;周超;;浅谈如何防治预制楼板天棚顺板缝方向的裂缝[J];华商;2007年Z3期
5 李亚力;;预制楼板板缝开裂的防治[J];煤炭技术;2008年04期
6 张显龙;李悦;;论如何预防预制楼板地面顺板缝方向的开裂[J];河南建材;2008年04期
7 成春到;;把好水泥预制楼板的质量关[J];建材工业信息;1987年21期
8 张虹;预制楼板板缝方向裂缝的原因及防治[J];鞍山钢铁学院学报;2000年03期
9 张大勇,周国强;在施工中如何避免预制楼板沿板跨方向出现裂缝[J];林业科技情报;2000年03期
10 韩陆军 ,张宏艳;预制楼板棚顶抹灰开裂的预防[J];黑河科技;2002年01期
相关会议论文 前3条
1 高渊;王怀胜;;预制楼板顺板裂缝的防治[A];河南省建筑业行业优秀论文集(2005)[C];2005年
2 李建军;;粘钢板网加固预制楼板板底性能分析[A];2014年7月建筑科技与管理学术交流会论文集[C];2014年
3 刘斌;黄坤耀;;某改建工程中的预制楼板加固[A];建筑结构(2009·增刊)——第二届全国建筑结构技术交流会论文集[C];2009年
相关重要报纸文章 前1条
1 牛彦君;将严格限制使用预制楼板[N];甘肃日报;2008年