PPP项目合作效率评价模型研究
[Abstract]:The PPP model is a long-term, mutually beneficial and institutionalized cooperative relationship between the public sector and the private sector for a specific public project and through the signing of a concession agreement, giving full play to the respective advantages of both the public and private sectors. To improve the efficiency of construction and operation of public goods and services is a modern financing mode based on the concept of multi-win cooperation among stakeholders. PPP model has played an indispensable role in the field of infrastructure in China, which can alleviate the pressure on government funds. It is of great significance to meet the social demand for public goods and services, but the private sector investment has dropped sharply since 2008. The main reason for this phenomenon is that the PPP project has not achieved the expected results, and its construction and operation results are uneven. At its root, their respective utility can not be realized effectively, which leads to the low degree of cooperation between the participants, pays more attention to their own utility and neglects the interests of other participants, resulting in the reduction of the efficiency of cooperation to achieve the desired purpose. In this context, this paper makes a systematic study on the efficiency of PPP project cooperation based on the practical experience, starting from the fundamental goal of the PPP project, that is, maximizing the total utility of the core stakeholders-the government, the private sector and the public. Through the questionnaire survey and statistical analysis, a grey evaluation model of PPP project cooperation efficiency based on tripartite satisfaction is established, and the key factors affecting the degree of cooperation are explored. On this basis, the elements are brought into the unified framework for tradeoff analysis, and the solutions are put forward to maximize the total utility of the three parties, so as to improve the degree of cooperation and guide the successful operation of the project. Based on the empirical analysis of Beijing Metro Line 4, this paper studies the cooperation efficiency of the whole life cycle of PPP project, and verifies the validity and applicability of the evaluation model proposed in this paper.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:F283
【参考文献】
相关期刊论文 前10条
1 叶晓u&;王志美;胡攀辉;;基于PPP模式的我国大型体育场馆运营产权配置研究[J];建筑经济;2014年06期
2 王玉梅;严丹良;;基于平衡计分卡的PPP项目绩效评价体系研究[J];会计之友;2014年02期
3 郭健;;公路基础设施PPP项目交通量风险分担策略研究[J];管理评论;2013年07期
4 孙慧;叶秀贤;;不完全契约下PPP项目剩余控制权配置模型研究[J];系统工程学报;2013年02期
5 邓小鹏;段昊智;袁竞峰;张星;;PPP模式下保障性住房的共有产权分配研究[J];工程管理学报;2012年06期
6 孙慧;申宽宽;范志清;;基于SEM方法的PPP项目绩效影响因素分析[J];天津大学学报(社会科学版);2012年06期
7 胡振;;公共项目公私合作(PPP)控制权配置的决策模型[J];西安建筑科技大学学报(自然科学版);2012年01期
8 袁竞峰;季闯;李启明;Skibniewski Miroslaw J.;;基于虚拟标杆的基础设施PPP项目绩效评价体系构建[J];现代管理科学;2011年07期
9 叶晓u&;易朋成;吴书霞;;PPP项目控制权本质探讨[J];科技进步与对策;2011年13期
10 何涛;赵国杰;;基于随机合作博弈模型的PPP项目风险分担[J];系统工程;2011年04期
相关博士学位论文 前1条
1 吴孝灵;基于博弈模型的BOT项目利益相关者利益协调机制研究[D];南京大学;2011年
相关硕士学位论文 前4条
1 许强;PPP项目风险因素分析与分担决策[D];南京大学;2013年
2 杨扬;公私合作制(PPP)项目的动态利益分配研究[D];大连理工大学;2013年
3 易朋成;基于控制权理论的PPP项目合作效率研究[D];重庆大学;2011年
4 陈菲;PPP项目利益相关者的利益协调与分配研究[D];重庆大学;2008年
,本文编号:2383034
本文链接:https://www.wllwen.com/jingjilunwen/jingjiguanlilunwen/2383034.html