兰州轨道交通1号线一期工程已有16座车站主体结构封顶
发布时间:2018-02-21 18:41
本文关键词: 车站主体 结构封顶 一期工程 盾构区间 土方开挖 主体结构工程 陈官 官营 围护桩 附属结构 出处:《施工技术》2017年14期 论文类型:期刊论文
【摘要】:正截至2017年7月17日,兰州轨道交通1号线一期工程全线20座车站已有16座车站主体结构封顶,17个盾构区间已有15个实现双线贯通。1)20座车站16座封顶4座未封顶的车站依次为陈官营站、省政府站、东方红广场站、焦家湾站。陈官营站土方开挖已全部完成,主体结构工程量完成94%,站台板累计完成160m,占总量95.2%;轨顶风道全部完成。省政府站受前期
[Abstract]:As of July 17th 2017, In the first phase of Lanzhou Rail Transit Line 1, 16 main structures have been sealed at the 20 stations on the whole line, and 15 stations with double lines through .1and 20 stations with 4 unsealed tops have been established in 17 shield sections, which are Chenguanying Station and Provincial Government Station, respectively. Dongfanghong square station, Jiaojiawan station. Chen Guanying station earthwork excavation has been completed, the main structure engineering quantity has been completed 94, platform board has completed 160 m, the total amount is 95. 2%; the track top wind passage is all completed. The provincial government station is in the early stage
【分类号】:F572.88
【相似文献】
相关期刊论文 前1条
1 佘金龙;;地下车站主体土建工程造价探析[J];建筑经济;2012年02期
相关重要报纸文章 前10条
1 记者 张新民;9座车站主体完工[N];天津日报;2008年
2 周炜;二号线体育场车站主体封顶[N];西安日报;2008年
3 记者 周炜;8月底主体全部封顶[N];西安日报;2009年
4 张新民;地铁6座车站主体完工[N];天津日报;2008年
5 记者 杜一鸣;地铁一号线22座车站主体工程全部竣工[N];沈阳日报;2009年
6 记者 轩辕杨子 实习生 周晨曦;二号线9月28日试运营[N];西安日报;2011年
7 吕晶 记者 卢军;地铁一期5座车站主体已完工[N];黑龙江日报;2009年
8 广东建设报记者 邓新灵 通讯员 钟声;苏泽群调研广州地铁建设[N];广东建设报;2010年
9 晏明智 记者 刘兴;“像爱护生命一样爱护每一棵树”[N];南昌日报;2011年
10 记者 周炜邋实习生 李峰;地铁二号线凤城五路站提前封顶[N];西安日报;2008年
,本文编号:1522583
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/1522583.html