公路项目设计阶段的造价控制研究
[Abstract]:At present, a large amount of funds are invested in the construction of highway projects in our country, but the poor cost management results in the waste of a large amount of funds. Therefore, how to carry on the effective cost control to the highway project is very important. It is urgent to carry out the research on the cost control in the design stage and the cost control in the design stage. In this paper, the insufficient cost control in the design stage of highway project is studied and the improvement measures are put forward. This paper summarizes the application of cost control in the design stage of highway project at home and abroad as well as the present research situation, analyzes the problems existing in the cost control in the design phase of our country at present, and expounds the significance of the cost control in the stage of research and design. And the concept and content of the design management of the design project and the design content of the preliminary design stage and the construction drawing design stage in the design phase. The content of design management includes two aspects: design quality management and design schedule control. The work flow of cost control in design stage is divided and the goal of cost control in design phase is analyzed. By using the principle of value engineering and the fuzzy comprehensive evaluation method of AHP, the design schemes in the preliminary design are compared and selected, and the concepts of value engineering, quota design, life cycle cost and the significance of their application in the design stage are expounded respectively. Use quota design for design scheme comparison. The construction conditions and objectives of the model are constructed, the factors influencing the cost control in the design stage are studied, the weight of the influencing factors is determined, and the value coefficient is calculated by using the value engineering method. The results show that the higher the value coefficient is, the higher the engineering value is. The reliability of the value coefficient is verified and an optimal scheme is obtained based on the actual engineering examples. Aiming at the deficiency of quota design at present, the improvement measures of quota design are put forward. The measures to improve the cost control in the process of design management are put forward. The research provides a theoretical basis for the cost control of highway project design in China, and its research content has certain theoretical reference and practical application value.
【学位授予单位】:长沙理工大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F542;U412
【参考文献】
相关期刊论文 前6条
1 李杰,谢龙江,祖文;浅谈价值工程在道路设计中的应用[J];城市道桥与防洪;2002年02期
2 张伟华;国内外公路工程造价管理模式浅析[J];中外公路;2003年01期
3 张长海,朱俊峰;世界主要国家交通基础设施投资模式的启示[J];技术经济与管理研究;2005年06期
4 王固琴;;中加工程造价管理对比与借鉴[J];建筑经济;2006年12期
5 刘黎萍;浅议公路工程设计阶段的造价控制[J];中南公路工程;2000年04期
6 周澜;王征;;浙江公路建设工程造价管理存在的问题及应对措施[J];中国水运(下半月);2009年12期
相关博士学位论文 前1条
1 袁剑波;公路建设项目管理模式与方法研究[D];中南大学;2006年
相关硕士学位论文 前10条
1 刘艳;公路建设项目全过程造价控制方案评价方法研究[D];中南大学;2010年
2 魏蓉;房地产建设项目设计阶段的造价控制研究[D];中南林业科技大学;2011年
3 邵宏;浙江省公路工程造价控制研究[D];浙江大学;2002年
4 郑顺炽;建设项目施工阶段造价控制的理论与实践研究[D];武汉理工大学;2003年
5 王丽君;政府投资项目全过程造价管理与控制[D];内蒙古大学;2006年
6 黄文苗;BOT模式在高速公路项目中应用性研究[D];对外经济贸易大学;2006年
7 崔惠德;公路工程造价控制研究[D];吉林大学;2006年
8 钟艳艳;建设项目设计阶段造价控制研究[D];重庆大学;2007年
9 马林;有关工程项目实施过程中造价管理的跟踪研究和探讨[D];同济大学;2007年
10 连海燕;建设项目实施阶段工程造价的确定与控制研究[D];西南交通大学;2008年
本文编号:2150698
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2150698.html