高速铁路建设单位风险管理研究
[Abstract]:The construction scale of high-speed railway in China has become the first in the world, and the development of high-speed railway is still accelerating. In addition, the construction project of high-speed railway has the characteristics of long construction period, high technical requirements, difficult management, involving a large number of participating units, huge investment, and so on. As the high-speed railway construction unit is the core subject of the construction project and runs through the whole process of the construction project, it is of great significance to study the risk management of the high-speed railway construction project from the perspective of the construction unit. Personnel to implement risk response measures to provide reference suggestions, so that more construction units attach importance to risk management, and thus improve the level of risk management of high-speed railway construction projects in China.
Firstly, the paper introduces the general situation of the development of high-speed railway in China, the characteristics of construction projects and the relevant policies and systems of risk management, discusses the significance of this study, and collates the literature on risk management, construction project risk management and high-speed railway construction risk management at home and abroad. Secondly, it studies the literature by searching for information. Based on the study of foreign literatures and analysis of cases, this paper summarizes the successful experience of risk management of foreign construction projects, and provides reference for the implementation of risk management of high-speed railway in China. Risk characteristics of construction projects are identified from the perspective of risk management of high-speed railway construction units. Risk factors are divided into external environmental risks, internal risks of construction units and risks from other participating units. Lists of risk identification are listed and all risk factors are analyzed in detail. On the basis of this, the paper puts forward some suggestions from the angle of system guarantee for implementing risk management, and at the same time expounds in detail the measures taken by construction units to implement risk management.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F284;F532
【参考文献】
相关期刊论文 前10条
1 卿姚;王月明;;我国工程项目风险管理研究综述[J];四川建筑科学研究;2007年02期
2 张杰;丁保山;;浅谈如何防范铁路建设资金风险[J];财经界(学术版);2008年11期
3 毛儒;;轨道交通安全风险管理[J];都市快轨交通;2007年04期
4 周智勇,何华;建筑工程风险管理系统的建立[J];江西农业大学学报(社会科学版);2004年01期
5 王红卫;;建设项目风险管理问题研究:美国经验及其启示[J];技术经济与管理研究;2008年05期
6 朱珊;国际工程承包中的项目风险管理[J];建筑经济;2004年05期
7 李森;;高速铁路投资项目的风险分析与控制[J];科技创业月刊;2006年07期
8 仉瑞红;孙鹏;;建设工程项目业主风险管理中的合同管理[J];科技信息;2011年04期
9 陈筑;;业主方工程风险预警机制初探[J];水利水电工程造价;2008年04期
10 陈义志;;武广客运专线工程建设风险管理方案[J];铁道标准设计;2010年11期
相关硕士学位论文 前6条
1 管百海;中铁五局秦沈指挥部典型工程项目风险管理及分析[D];西南交通大学;2002年
2 王菊凤;工程项目的风险评价研究[D];西南交通大学;2006年
3 冉龙华;铁路工程项目施工风险管理及对策研究[D];西南交通大学;2007年
4 叶国东;城市轨道交通项目前期风险管理研究[D];中南大学;2008年
5 严健;铁路客运专线BOT项目融资风险管理研究[D];西南交通大学;2008年
6 文进坤;基于风险传导模型的供应链风险评估方法研究[D];中南大学;2009年
,本文编号:2188616
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2188616.html