基于CE-BP模型的公路施工企业定额编制方法研究
[Abstract]:Highway engineering enterprise quota is the standard of unit product consumption and other expenses compiled by enterprises according to their own construction technology level and project management level, which reflects the productivity level of enterprises. It is an important basis for highway construction enterprises to carry out bidding quotation and engineering cost accounting. Under the mode of bill of quantities valuation, enterprise quota has become the key factor restricting the smooth operation of list valuation market. Most of the original data of highway engineering enterprise quota are obtained by field technical measurement. Because of its high cost and long measuring period, it is difficult to carry out the method in most construction enterprises. This paper analyzes the important position and function of enterprise quota and various methods of compiling enterprise quota at present, and puts forward the analysis and screening of original enterprise quota data from the engineering basic data accumulated by enterprises. From the angle of statistical analysis, the establishment method of highway engineering enterprise quota is studied systematically. On the basis of analyzing the characteristics of basic data of highway engineering, the sources of basic data in each period and stage of highway construction project are studied. The basic data of highway engineering are classified into three categories: spatial data, attribute data and thematic data. This paper expounds the important role of engineering basic data in enterprise quota compilation and the concept of similar engineering, summarizes the influencing factors of similarity degree of similar engineering, and establishes the screening model of similar engineering by using fuzzy cluster analysis method. The clustering of many complex projects is realized, which makes the original data more comparable. Then, the original quota data is studied by using cross-entropy theory and BP neural network method, and the enterprise quota calculation model based on CE-BP is constructed, and the quota value is calculated. Finally, combining with the engineering example of a highway construction enterprise, using the constructed model to carry on the empirical analysis and to verify the scientific nature of the model based on the theory and the feasibility of the model itself. It provides theoretical basis and practical and reliable operation method for the establishment of quota for highway engineering construction enterprises.
【学位授予单位】:长沙理工大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F542;U415.2;TU723.3
【参考文献】
相关期刊论文 前8条
1 毛玲,孙即祥,季虎;基于交叉熵和新转移函数的模糊神经网络分类器[J];国防科技大学学报;2004年05期
2 杜洪烈;;公路工程实行市场定价后定额的作用[J];公路;2010年10期
3 习晓兰,兰茗;建筑施工企业定额现状调查分析[J];经济师;2003年12期
4 温国锋;陈立文;;已完建筑工程数据仓库的建立与应用研究[J];计算机工程与应用;2011年04期
5 余宏泰;;浅谈新疆沙漠公路工程定额编制[J];科学咨询(决策管理);2007年05期
6 苏兴华;;基于数据仓库的钻井工程数据集成技术研究[J];石油工业计算机应用;2009年01期
7 全宇;王忠庆;何苗;;基于交叉熵的神经网络在病理图像分析中的应用[J];中国医科大学学报;2009年06期
8 王首绪;公路施工企业快速建立定额系统的方法研究[J];中南公路工程;2000年02期
相关硕士学位论文 前8条
1 乔鹏;公路工程基础定额数据测定方法选择及多因素数据差异性研究[D];长沙理工大学;2010年
2 胡媛;基于清单计价模式的企业定额研究[D];中南林业科技大学;2010年
3 刘雄伟;夏热冬暖地区公共建筑能耗定额编制方法研究[D];重庆大学;2010年
4 孙艺;基于神经网络技术的公路工程补充定额的编制与研究[D];长沙理工大学;2011年
5 王春梅;建筑施工企业定额的编制研究[D];河北农业大学;2006年
6 李栋;总体幅度差系数计算方法在公路预算定额编制过程中应用[D];长沙理工大学;2009年
7 唐秀丽;蒙特卡洛模拟技术在企业定额制定中的应用研究[D];首都经济贸易大学;2009年
8 郭超;基于遗传神经网络的工时定额计算方法研究[D];中国工程物理研究院;2009年
本文编号:2294035
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2294035.html