我国高速铁路成本效益研究
[Abstract]:As a national transportation facility, high-speed railway is the product of the development of the national economy to a certain stage and the social productive forces. In the rapid development of high-speed railway, high cost has become an unavoidable problem. Compared with ordinary railways, high-speed rail has the advantages of large investment, high technical difficulty and long return period. Therefore, in order to realize the sustainable development of high-speed railway, it is necessary to correctly identify the cost and benefit of high-speed railway. In seeking ways to reduce costs while taking into account the benefits of high-speed rail, deal with the relationship between the two. Based on the experience of developing high-speed railways in Japan and Europe, the financial losses brought about by the initial construction of high-speed railways are inevitable, because the construction costs of high-speed railways are so high that they cannot proceed smoothly without strong financial support. After the dark days of development, Japanese and European high-speed railways are on a profitable path. China's high-speed railway is still in its early stage of development, and its revenue is far from being able to make up for the cost. However, people often ignore some social externalities, for example, high-speed railway promotes the development of economy along the line, reduces environmental pollution and noise pollution, and so on. In terms of cost, it also ignores the extra social externalities caused by the construction of high-speed railway. And these can't be shown financially. Thus, it seems that there is a deviation in the conclusion that high-speed rail is a loss only from the financial point of view of the costs and benefits of high-speed rail. This paper will discuss the cost and benefit of high speed railway, not only from the financial aspect, but also from the cost and income caused by the construction of high speed railway, especially the analysis of the cost and benefit which is difficult to quantify directly. Based on the characteristics and present situation of high-speed railway, this paper mainly studies the construction cost, technical cost, safety cost, environmental cost and the impact of these costs on the benefit of high-speed railway. It is of great significance to realize the sustainable development of high-speed railway.
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F532.5
【参考文献】
相关期刊论文 前10条
1 冯华;薛鹏;;中国高速铁路的综合效益与支持政策探析[J];广东社会科学;2011年03期
2 梁宝文;;铁路工程项目建筑施工成本效益分析[J];消费导刊;2010年06期
3 李世钰;;推行责任成本控制 提高铁路施工企业效益——中国铁道建筑系统推行责任成本管理的做法和体会[J];财务与会计;2000年04期
4 丁瑾;;市场经济下的企业成本效益[J];黑龙江科技信息;2009年07期
5 曹振龙;;模糊层次分析法在工程造价管理中的应用[J];合作经济与科技;2011年01期
6 郭红燕;樊峰鸣;;绿色GDP的环境成本核算研究[J];经济问题;2007年07期
7 沈良峰;基于模糊技术的建筑施工方案择优[J];技术经济;2003年10期
8 沈立波;;浅析价值工程在施工项目的成本控制中的运用[J];价值工程;2010年03期
9 刘辉;;对高速铁路成本研究管理的若干思考[J];价值工程;2012年11期
10 林晓枝;刘元芳;张荣福;;FAHP在工程施工阶段成本风险评价中的应用[J];福建工程学院学报;2008年06期
相关博士学位论文 前4条
1 张光远;高速铁路行车安全机理及相关应用问题研究[D];西南交通大学;2010年
2 陈春阳;中国机车车辆业创新战略研究[D];北京交通大学;2007年
3 韩同银;铁路建设项目管理模式发展与变革研究[D];河北工业大学;2007年
4 余卫平;轨道交通及其外部性研究[D];吉林大学;2008年
相关硕士学位论文 前4条
1 朱辉;基于模糊理论的生产计划的控制研究[D];哈尔滨工程大学;2005年
2 范继斌;我国高速铁路投融资问题研究[D];北京交通大学;2009年
3 马婷;高速列车总装制造业T公司的质量成本管理研究[D];北京交通大学;2010年
4 韦原清;铁路项目融资模式选择和融资结构影响因素研究[D];西南交通大学;2009年
,本文编号:2416741
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2416741.html