南昌地铁盾构刀盘选用及刀具配置分析
发布时间:2018-04-06 01:26
本文选题:盾构 切入点:刀盘形式 出处:《施工技术》2017年S1期
【摘要】:盾构机是一种机、电、液、通讯高度集成的用于隧道施工的大型工程机械设备,隧道的开挖是通过盾构刀盘的旋转完成,刀盘选型的合适与否,是盾构施工成败的关键因素之一。通过介绍刀盘的结构型式、不同刀具的适用地层;在刀盘形式确定后,根据不同区间的水文地质特性,合理调整先行刀具的型式,以满足刀盘、刀具与掘进地层的适应性,减少施工风险,保证盾构掘进的顺利进行。
[Abstract]:Shield machine is a kind of large-scale construction machinery equipment which is used for tunnel construction with high integration of machine, electricity, fluid and communication. The excavation of tunnel is completed by rotating the cutter head of shield machine, and the selection of cutter head is appropriate or not.It is one of the key factors of shield construction.This paper introduces the structure type of cutter head and the applicable stratum of different cutting tools, after the form of cutter head is determined, according to the hydrogeological characteristics of different interval, the advance cutting tool type is adjusted reasonably to meet the adaptability of cutter head, tool and tunneling stratum.Reduce the construction risk and ensure the smooth progress of shield tunneling.
【作者单位】: 南昌轨道交通集团有限公司;
【分类号】:U231.3;U455.39
【相似文献】
相关期刊论文 前4条
1 曹亚奇;徐长胜;;盾构在圆砾层掘进的刀盘及主驱动设计[J];建筑机械化;2014年01期
2 胡燕伟;谭顺辉;郑康泰;;基于石家庄地铁地质情况的土压平衡盾构机刀盘有限元优化设计[J];科技信息;2014年11期
3 叶康慨;广州地铁二号线越~三区间盾构施工刀盘适应性分析[J];隧道建设;2002年04期
4 张立茂;张青英;吴贤国;曹靖;刘梦洁;仲景冰;;地铁隧道施工盾构刀盘失效风险分析[J];中国安全科学学报;2014年07期
相关会议论文 前1条
1 董祥宽;;重庆复合式TBM刀盘防结泥饼技术[A];2012年中铁隧道集团低碳环保优质工程修建技术专题交流会论文集[C];2012年
相关重要报纸文章 前3条
1 李名;中铁隧道第一台自主研发的盾构刀盘成功出厂[N];中国经济导报;2005年
2 伍振 齐梦学;自主创新TBM技术获得国家专利[N];经理日报;2009年
3 姜明 姜书范 詹智慧 李慧楠;铁打的队伍铁打的兵[N];中华建筑报;2014年
相关硕士学位论文 前1条
1 占国栋;钢轨铣磨车铣刀盘设计与优化研究[D];湖南大学;2016年
,本文编号:1717370
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1717370.html