地铁隧道下穿雨污水管线变形分析
发布时间:2018-04-27 04:23
本文选题:Peck曲线 + 地表沉降 ; 参考:《建筑技术》2017年03期
【摘要】:基于Peck经验公式,建立地表或地层沉降与管线接口变形的内在联系,同时建立管线接口变形的计算模型。并以北京地铁十号线西土城站下穿污水管线为案例,计算管线变形值并与实测值进行对比,为类似施工提供参考与借鉴。
[Abstract]:Based on Peck's empirical formula, the internal relationship between surface or stratum subsidence and pipeline interface deformation is established, and the calculation model of pipeline interface deformation is also established. Taking the underground sewage pipeline of Xitu City Station of Beijing Metro Line 10 as an example, the deformation value of the pipeline is calculated and compared with the measured value, which provides a reference for similar construction.
【作者单位】: 北京建工集团有限责任公司;
【分类号】:TU992.2;U455