当前位置:主页 > 科技论文 > 路桥论文 >

成都地铁盾构滞后沉降的探地雷达波场数值模拟研究

发布时间:2018-04-29 18:31

  本文选题:探地雷达 + 成都地铁 ; 参考:《西南交通大学》2015年硕士论文


【摘要】:随着城市地铁不断修建,由修建产生的众多地表塌陷问题也越来越严重。在监测地表沉降问题上,可以使用探地雷达作为探测手段,具有很好的效果。成都地铁地表具有特殊地质背景,地表下伏的是富水的砂卵石地层。成都地铁施工全部采用盾构施工法,该施工方法施工时,会引起地面机械振动、地下土与砂石流失等,很容易产生地表沉陷。从成都地铁1号线探地雷达探测资料来看,成都地铁地表所产生的地面沉陷并不是瞬时的即时沉陷,而是具有一定的“滞后性”。这种特殊的滞后沉降很难确定沉降时间,因此具备很大的不可预见性,给预防治理工作带来不便。时域有限差分法(Finite-Domain Finite-Time Method, FDTD)作为一种成熟的电磁数值计算方法,具有精度高,计算准确等特点。本论文从成都地铁特殊地质背景出发,建立了以空隙率、空隙大小和空隙流体介质为表征的三个数值模型来模拟成都地铁地下介质不密实带特征,运用FDTD法对其进行数值模拟,并通过MATLAB绘图显示、直达波去除和色标值统一等处理,分析对比各组模型探地雷达波场结果,得到了不同参数下的探地雷达波场响应特征。由于成都地铁地表沉降具有明显的滞后性,对其监测具有时长性。通过建立成都地铁2号线滞后沉降的监测方案,运用探地雷达进行滞后沉降探测。结合探地雷达数值模拟,分析对比四期雷达监测结果,得出成都地铁滞后沉降变化规律,为地铁滞后沉降防治提供理论基础和解决方案。
[Abstract]:With the continuous construction of urban subway, many problems of surface collapse caused by construction are becoming more and more serious. The ground penetrating radar can be used as a detection method to monitor the surface subsidence, and it has a good effect. The surface of Chengdu Metro has a special geological background. The shield construction method is used in the construction of Chengdu metro, which will cause ground mechanical vibration, soil and sand loss and so on, which can easily cause ground subsidence. From the ground penetrating radar data of Chengdu Metro Line 1, the ground subsidence caused by Chengdu Metro is not an instantaneous subsidence, but has a certain "lag property". This special delayed settlement is difficult to determine the settlement time, so it has great unpredictability and brings inconvenience to the prevention and treatment work. Finite-Domain Finite-Time method (FDTD) is a mature electromagnetic numerical method with high accuracy and accuracy. In this paper, based on the special geological background of Chengdu Metro, three numerical models, which are characterized by porosity, pore size and void fluid medium, are established to simulate the characteristics of undense zone of underground media in Chengdu Metro. The numerical simulation is carried out by using FDTD method. The results of direct wave removal and color calibration are analyzed and compared by MATLAB drawing. The response characteristics of GPR wave field under different parameters are obtained by analyzing and comparing the results of each group of model GPR wavefields. Because of the obvious lag of ground subsidence in Chengdu Metro, the monitoring time is long. Through the establishment of the monitoring scheme of delayed settlement of Chengdu Metro Line 2, the ground penetrating radar is used to detect the delayed settlement. Combined with the numerical simulation of ground penetrating radar, this paper analyzes and compares the results of four phases of radar monitoring, and obtains the variation law of the delay settlement of Chengdu metro, which provides the theoretical basis and solution for the prevention and treatment of the delay settlement of the subway.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U231.3;U456.3

【参考文献】

相关期刊论文 前9条

1 冯德山;戴前伟;何继善;何刚;;探地雷达GPR正演模拟的时域有限差分实现(英文)[J];地球物理学进展;2006年02期

2 王振信;;盾构法施工地面沉降的机理及防止对策[J];地下工程与隧道;1990年02期

3 张英德,刘江平,刘良琼;Hilbert变换在地质雷达数据处理中的应用[J];工程地球物理学报;2004年04期

4 肖立锋;;铁路路基病害地质雷达检测方法[J];工程地球物理学报;2012年03期

5 陆柏华,徐灿华;浅谈城市建设抽地下水的滞后沉降对房屋的影响[J];广东科技;2005年11期

6 吴向州;;盾构隧道施工建(构)筑物的保护技术[J];隧道建设;2006年S2期

7 徐波;蒙爱军;吴凤昌;;利用数值模拟仿真探地雷达地下障碍物探测[J];路基工程;2010年05期

8 钱洪,唐荣昌;成都平原的形成与演化[J];四川地震;1997年03期

9 周燕,邸小坛,陶里;混凝土内部雷达探测仪的工程应用[J];施工技术;1997年06期

相关博士学位论文 前2条

1 胡平;探地雷达数值模拟技术的应用研究[D];中国地质大学(北京);2005年

2 王晖;青兰高速公路沿线北八特采空区地表沉陷机理及其数值模拟[D];中国地质大学(北京);2009年

相关硕士学位论文 前3条

1 裴建新;衰减介质中地质雷达数据正演模拟和叠前偏移方法研究[D];中国海洋大学;2004年

2 刘英利;地质雷达在工程物探中的应用研究[D];成都理工大学;2008年

3 余凯;基于于希尔伯特—黄变换的探地雷达信号处理与分析[D];中南大学;2010年



本文编号:1821085

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1821085.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户9f810***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com