岩溶空腔对大断面公路隧道稳定性的影响研究
本文选题:大断面隧道 + 数值分析 ; 参考:《西南交通大学》2017年硕士论文
【摘要】:我国西部山区山高谷深,沟壑纵横的岩溶溶蚀地貌给城市快速路网的建设带来了施工难题,尤其大、特大断面隧道穿越岩溶地层往往为该线路的控制性工程,隧道在岩溶地层的施工难题成为整条线路的控制性难题。岩溶地层因岩溶发育而形成的岩溶空腔,造成岩溶地层围岩的应力场分布与普通地层有很大区别,在岩溶空腔附近有较强的应力集中区,当隧道开挖后,这种应力分布的不均匀性还会加剧。岩溶地层的复杂性(尤其隧道临近岩溶空腔时),加之受季节性、周期性、阵发性降水影响,隧道运营期衬砌受力极为复杂。因此研究岩溶空腔对隧道施工及运营期稳定性的影响极为必要。本文依托重庆市快速路网中"三横线"的重要组成部分——双碑隧道,采用数值分析的方法研究岩溶空腔对隧道施工期及运营期稳定性的影响,主要对隧道施工期隧道开挖稳定性及运营期二次衬砌受力特性、安全性进行了研究,主要研究内容和结论如下:1)采用二维平面应变模型,当隧道背后存在隐伏岩溶空腔时,考虑空腔大小、位置、与隧道间距三种因素不同的所有工况,模拟隧道开挖并监测洞周位移、初期支护内力,研究了岩溶空腔对于隧道洞周围岩及支护结构的稳定性的影响规律。2)采用三维有限元模型,模拟岩溶空腔的三维空间结构与隧道沿纵向掘进完整的开挖工序、施工循环,选取岩溶空腔沿纵向空间尺寸变化的三个典型断面,监测并分析隧道洞周位移及围岩位移场、初期支护内力、塑性区,研究岩溶空腔对隧道纵向开挖稳定性的影响规律。3)采用渗流结构模型,监测二衬外水压力、二衬结构内力,研究临近隧道岩溶空腔的存在对隧道渗流场的影响;在设计排水系统下,得出二衬结构内力分布特征并评价其安全性。
[Abstract]:The karst dissolution geomorphology with deep mountains and high valleys and deep gullies in the western mountainous areas of China has brought construction difficulties to the construction of the urban expressway network, especially in the case of large cross-section tunnels passing through the karst strata, which are often the controlling projects of the railway line. The construction problem of tunnel in karst formation becomes the control problem of the whole line. The karst cavity formed by karst formation is very different from the ordinary strata in the distribution of stress field in the surrounding rock of karst stratum, and there is a strong stress concentration area near the karst cavity, when the tunnel is excavated, The inhomogeneity of the stress distribution will also be aggravated. The complexity of karst strata (especially when the tunnel is near the karst cavity, plus the influence of seasonal, periodic and paroxysmal precipitation), the tunnel lining force is extremely complex during the operation period. Therefore, it is necessary to study the influence of karst cavity on the stability of tunnel construction and operation. In this paper, the influence of karst cavity on the stability of the tunnel during construction and operation is studied by using the method of numerical analysis, which is an important part of "three horizontal lines" in Chongqing Expressway Road Network. In this paper, the stability of tunnel excavation during tunnel construction, the stress characteristics and safety of secondary lining during tunnel construction are studied. The main contents and conclusions are as follows: 1) the two-dimensional plane strain model is used, when there is a concealed karst cavity behind the tunnel, Considering all working conditions different from the three factors of cavity size, location and tunnel spacing, the tunnel excavation is simulated and the displacement around the hole is monitored. The influence of karst cavity on the stability of surrounding rock and supporting structure of tunnel is studied. The three-dimensional finite element model is used to simulate the three-dimensional space structure of karst cavity and the complete excavation procedure along the longitudinal tunnel. Three typical sections of karst cavity changing along longitudinal spatial size are selected to monitor and analyze the displacement field around tunnel and surrounding rock, the initial supporting internal force and plastic zone. The influence of karst cavity on the stability of tunnel excavation is studied. (3) the seepage structure model is used to monitor the external water pressure and the internal force of the two-lining structure, and the influence of the karst cavity in the adjacent tunnel on the seepage field of the tunnel is studied. Under the design of drainage system, the internal force distribution characteristics of two-liner structure are obtained and its safety is evaluated.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U451
【参考文献】
相关期刊论文 前10条
1 赖金星;汪珂;邱军领;;溶洞位置对隧道结构影响的数值模拟研究[J];公路;2015年08期
2 施有志;李建锋;李汪颖;周先齐;;扁平超大断面隧道的施工力学特征及其动力稳定性分析[J];上海交通大学学报;2015年07期
3 王一鸣;阳军生;罗禄森;林辉;;岩溶隧道衬砌水压力分布统计分析及模糊评价[J];郑州大学学报(工学版);2015年02期
4 范占锋;;隧道上部充水溶洞对围岩稳定性影响的数值模拟[J];公路交通科技;2014年05期
5 邵琳;左宇军;宋希贤;;溶洞位置对巷道围岩破裂过程的影响分析[J];地下空间与工程学报;2014年01期
6 唐侦湛;范海军;易鑫;邹澜;;溶洞分布部位对隧道稳定性影响的数值分析[J];公路工程;2013年06期
7 莫阳春;;隧道底部隐伏空腔充水对二次衬砌内力影响研究[J];水文地质工程地质;2011年05期
8 扈世民;张顶立;王梦恕;;大断面黄土隧道开挖引起的围岩力学响应[J];中国铁道科学;2011年05期
9 晋学辉;程崇国;;大断面扩建隧道施工初期支护受力分析[J];重庆交通大学学报(自然科学版);2011年04期
10 周丁恒;曹力桥;房师涛;曲海锋;马永峰;;特大断面隧道支护结构现场试验与三维效应分析[J];土木工程学报;2011年02期
相关博士学位论文 前4条
1 赖永标;隐伏溶洞与隧道间安全距离及其智能预测模型研究[D];北京交通大学;2012年
2 郭军;客运专线大断面黄土隧道施工力学及支护设计理论研究[D];西南交通大学;2008年
3 曲海锋;扁平特大断面公路隧道荷载模式及应用研究[D];同济大学;2007年
4 刘春;深埋大断面隧道施工力学性态研究[D];重庆大学;2007年
相关硕士学位论文 前10条
1 何聪;高压富水地区隧道渗流场分析与衬砌抗水压力对策研究[D];西南交通大学;2015年
2 王森;城市轨道交通富水岩溶隧道衬砌外水压力及结构受力研究[D];重庆大学;2015年
3 王一鸣;高水压岩溶隧道衬砌结构受力特征和防排水设计研究[D];中南大学;2014年
4 马云飞;有压岩溶大断面隧道安全性分析[D];石家庄铁道大学;2014年
5 薛慎骁;特大断面公路隧道结构受力特性及稳定性分析研究[D];长安大学;2014年
6 赵世科;溶洞对隧道施工的影响研究[D];西南交通大学;2012年
7 郑强;软弱围岩中特大断面超小净距隧道2扩4施工方法研究[D];华侨大学;2011年
8 张,
本文编号:1954803
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1954803.html