组合型前板桩高桩承台结构研究与应用
发布时间:2018-05-30 10:04
本文选题:组合型结构 + 钢板桩 ; 参考:《水运工程》2017年11期
【摘要】:分析传统前板桩高桩承台结构的优缺点,针对混凝土板桩、钢板桩的耐久性、经济性等问题,提出了改进型方案即组合型前板桩高桩承台结构。采用竖向弹性地基梁法建立组合型结构的计算模型,并采用有限元软件SAP2000对混凝土桩身受力的优化方法进行解释。以上海某码头为例,验证组合型前板桩高桩承台结构的实用性和模型计算的准确性。
[Abstract]:Based on the analysis of the advantages and disadvantages of the traditional pile cap structure of the front plate pile and the durability and economy of the concrete plate pile and the steel plate pile, an improved scheme, that is, the composite front plate pile high pile cap structure, is put forward. The calculation model of composite structure is established by using vertical elastic foundation beam method, and the optimization method of concrete pile subjected to force is explained by finite element software SAP2000. Taking a wharf in Shanghai as an example, the practicability and accuracy of model calculation of composite pile cap structure are verified.
【作者单位】: 中交上海航道勘察设计研究院有限公司;
【分类号】:U656.1
【相似文献】
相关期刊论文 前10条
1 ;计算高桩承台的C法[J];桥梁建设;1974年03期
2 周泳涛;高桩承台在实际工程中的应用[J];云南交通科技;1999年06期
3 娄新,朱传宏;锚固新工艺在深水高桩承台施工应用[J];湖南交通科技;2005年02期
4 乐云祥,常英;高桩承台裂缝有限元分析[J];公路交通科技;2005年02期
5 朱冠e,
本文编号:1954891
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1954891.html