高铁隧道顶部开口缓冲结构微压波缓解规律分析及参数设计研究

发布时间:2018-06-27 16:04

  本文选题:高速铁路 + 隧道 ; 参考:《西南交通大学》2016年硕士论文


【摘要】:针对目前高速铁路隧道运营所引起的噪声问题,本文对列车时速为350km/h时隧道洞口缓冲结构降低音爆的措施进行研究分析,以无开口缓冲结构的压力梯度为基准,确定每种工况的降低率,最后给出最优方案的计算公式,便于指导设计及施工。主要结论如下:1、顶部单开口缓冲结构最优参数分析(1)顶部单开口缓冲结构随着开口距离的增加,压力梯度首波峰值递减,二次波峰值递增。当开口距离大于15m后,此时压力梯度曲线的峰值基本保持不变,说明压缩波在15m左右时完全形成,并且与开口长度和宽度无关。(2)当开口宽度为2m、3m、4m,随着开口距离的增加,最佳开口长度呈递减趋势,降低率也随着开口距离和开口宽度的增加而降低。所以当开口宽度为2m,开口距离为1m,开口长度为20m时(开口率40%),缓冲结构的降低率最大,达到45.31%。(3)延米降低率随着开口宽度增加而增加,随开口距离减小而减小。所以当开口距离为1m,开口宽度为4m、开口长度为13m时(开口率52%)延米降低率最大,其值为3.08%/m。2、顶部双开口缓冲结构最优参数分析(1)固定第一开口距离,增大第二开口距离,第一开口最佳长度递增,缓冲结构的总长和总降低率都在增大,但是延米降低率却在减小。固定第二开口距离,当增大第一开口距离时,匹配的第一开口长度递减,缓冲结构的总降低率和延米降低率都在减小后。(2)当第一、第二开口距离分别为lm和8m,第一、第二开口长度为12m和3m时,缓冲结构的总降低率最大,达到53.10%;当第一、第二开口距离为1m和6m,第一、第二开口长度分别为10m和4m时,缓冲结构的延米降低率最大,其值为2.46%/m。
[Abstract]:In view of the noise problem caused by the operation of high-speed railway tunnel at present, this paper studies and analyzes the measures to reduce the sound explosion of the tunnel opening buffer structure when the train speed is 350km/h, taking the pressure gradient of the non-opening buffer structure as the benchmark. Finally, the calculation formula of the optimal scheme is given to guide the design and construction. The main conclusions are as follows: (1) the pressure gradient first wave peak decreases and the secondary wave peak increases with the increase of opening distance. When the opening distance is greater than 15m, the peak value of the pressure gradient curve remains basically unchanged, indicating that the compression wave is completely formed at about 15m, and is independent of the opening length and width. (2) when the opening width is 2 m ~ 3 m ~ 4 m, with the increase of opening distance, The optimum opening length is decreasing and the decreasing rate decreases with the increase of opening distance and opening width. So when the opening width is 2 m, the opening distance is 1 m, the opening length is 20 m (opening ratio is 40%), the reduction rate of buffer structure reaches 45.31%. (3) the decreasing rate of lengthening rice increases with the increase of opening width and decreases with the decrease of opening distance. So when the opening distance is 1 m, the opening width is 4 m, the opening length is 13 m (the opening rate is 52%), the reduction rate is the highest, the value is 3.08 / m 路2, the optimum parameter analysis of the top double opening buffer structure (1) is to fix the first opening distance and increase the second opening distance. The optimum length of the first opening increases, the total length and the total reduction rate of the buffer structure increase, but the drop rate of the elongated rice decreases. When the distance of the second opening is fixed, when the first opening distance is increased, the length of the matching first opening decreases, and the total reduction rate of the buffer structure and the drop rate of the length of the second opening are both reduced. (2) when the first and the second opening distances are lm and 8m, respectively, the first, When the length of the second opening is 12m and 3m, the total reduction rate of the buffer structure reaches 53.100.When the first, the second opening distance is 1m and 6m, the first opening length and the second opening length are 10m and 4m, respectively, the reducing rate of the buffer structure is the largest, the value is 2.46 / m.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:U452

【相似文献】

相关期刊论文 前8条

1 ;行业动态与资讯[J];建筑节能;2007年08期

2 ;关于2010年上半年各省自治区直辖市单位GDP能耗降低率的公告[J];节能与环保;2010年10期

3 ;2010年1~3季度各省自治区直辖市单位GDP能耗降低率[J];节能与环保;2010年12期

4 任永刚;;解析万元GDP能耗降低率[J];能源与节能;2013年11期

5 ;1986年全市节能工作情况与1987年全市节能工作任务[J];北京节能;1987年Z1期

6 曾建;;北京发展踏上绿色之路[J];节能与环保;2010年01期

7 ;国家下达“十二五”各地区节能目标[J];能源与环境;2011年06期

8 ;[J];;年期

相关重要报纸文章 前10条

1 通讯员 徐国伟邋记者 洪光豫;能耗降低率好于全省平均水平[N];杭州日报;2007年

2 记者李岚峰;一季度公司节能降耗成效显著[N];华北电力报;2009年

3 记者刘光达 付卫国;公司节能会先省万元开好头[N];华北电力报;2009年

4 记者 朱朝星;全市万元工业增加值能耗降低率达7%[N];开封日报;2008年

5 方烨;29个地区没完成能耗降低率[N];经济参考报;2007年

6 记者李红梅;公司确定2010年节能目标[N];华北电力报;2010年

7 记者 柯颂 通讯员 陈程;去年单位GDP电耗降低率为14.58%[N];中山日报;2009年

8 通讯员 张丽华 陈锋斢 李爱武 记者 洪光豫;2009年我市节能降耗成效显著[N];杭州日报;2010年

9 孙法章;陈金山;临邑节能降耗 提高成本利用率[N];农民日报;2007年

10 记者 陈玮;全市万元GDP能耗降低率为3.85%[N];兰州日报;2013年

相关硕士学位论文 前1条

1 任文强;高铁隧道顶部开口缓冲结构微压波缓解规律分析及参数设计研究[D];西南交通大学;2016年



本文编号:2074467

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2074467.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户59400***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com