盾构隧道圆形工作井管片衬砌结构优化及其适应性研究
[Abstract]:In this paper, taking the receiving well of Nantanhai cross river shield tunnel as the research object, the numerical results and field test data of deformation and force on the ground connection wall and lining of the shield tunnel working well are compared. The distribution of force and deformation of supporting structure under formation pressure in circular working well during construction is studied, and the distribution coefficient of pressure between vertical wall and lining is found, and the inner lining of circular working well is optimized and made into the lining of assembled pipe piece. The aim is to solve the problems of low mechanization and long construction period in shield working wells in soft soil area. Based on the existing design theory of shield segment, the influence of different structural selection and assembling mode on the stress and deformation of lining segment is analyzed, and the design scheme of segment selection is determined. Through the research in this paper, the following conclusions are drawn: (1) through numerical analysis, the distribution of internal force and deformation of supporting structure under the action of formation pressure in circular working well is studied. It is obtained that the control section of the supporting structure design of the working well is located in the 2m section from the bottom of the well to the bottom of the hole (buried depth H=12m-14m): 2. The influence of the lining time on the stress and deformation of the lining and the ground connecting wall is studied. It is concluded that the variation of lining time has little effect on the earth pressure of the earth connecting wall, and has a great effect on the lining. 3) the lining of the receiving well of Nantanhai Shield Tunnel is constructed according to the following method. It is concluded that the pressure ratio of the ground connection wall to the lining is between 0.21 and 0.28 in the vicinity of the bottom of the shaft. By analyzing the influence of each parameter change on the internal force and deformation of the segment structure, it is obtained that the segment thickness is 400 mm, the width is 2 m, each ring is divided into 8 blocks and the staggered joints are assembled.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U455.43
【参考文献】
相关期刊论文 前10条
1 朱正国;安辰亮;朱永全;刘灼;;地铁深竖井土压力理论研究[J];岩石力学与工程学报;2013年S2期
2 彭益成;丁文其;闫治国;黄星程;肖冰峰;;修正惯用法中弯曲刚度有效率的影响因素分析及计算方法[J];岩土工程学报;2013年S1期
3 葛世平;谢东武;丁文其;欧阳文彪;;盾构管片接头简化数值模拟方法[J];岩土工程学报;2013年09期
4 张运良;聂子云;李凤翔;王昌胜;;数值分析在基坑变形预测中的应用[J];岩土工程学报;2012年S1期
5 冯冀蒙;仇文革;王航;;隧道复合式衬砌初期支护极限状态模型试验研究[J];岩土力学;2012年11期
6 李彦东;梁发云;褚峰;;软土地区深基坑变形特性三维数值模拟与验证[J];地下空间与工程学报;2011年06期
7 郑荣跃;曹茜茜;刘干斌;刘晓虎;;深基坑变形控制研究进展及在宁波地区的实践[J];工程力学;2011年S2期
8 何本贵;刘芳;高谦;王秀丽;;深基坑数值模拟与现场监测分析[J];施工技术;2011年19期
9 李金科;张贤福;刘韫砚;;外压圆筒的计算及数值计算稳定性分析[J];压力容器;2011年07期
10 晏启祥;张增;程曦;;泄水式管片衬砌地层结构相似模型试验研究[J];铁道标准设计;2011年02期
相关会议论文 前5条
1 章青;刘仲秋;;考虑渗流-应力耦合效应的深埋引水隧洞衬砌损伤演化分析[A];第十二次全国岩石力学与工程学术大会会议论文摘要集[C];2012年
2 陈群;何昌荣;赖紫辉;;地基情况对重力式桩基托梁挡土墙应力和变形的影响研究[A];第三届全国岩土与工程学术大会论文集[C];2009年
3 李永盛;;基坑围护混凝土支撑的设计理论与工程实践[A];岩石力学理论与工程实践[C];1997年
4 朱合华;杨林德;陈清军;桥本正;;盾构隧道管片接头衬砌系统的两种受力设计模型[A];第五届全国结构工程学术会议论文集(第三卷)[C];1996年
5 朱合华;杨林德;丁文其;;盾构隧道衬砌的梁—接头模型与水土压力的反演推定[A];中国土木工程学会隧道与地下工程学会地铁专业委员会第十二届学术交流会论文集[C];1998年
相关博士学位论文 前6条
1 周济民;水下盾构法隧道双层衬砌结构力学特性[D];西南交通大学;2012年
2 封坤;大断面水下盾构隧道管片衬砌结构的力学行为研究[D];西南交通大学;2012年
3 崔国华;盾构管片拼装机的设计及动态性能研究[D];吉林大学;2009年
4 刘发前;圆形基坑土压力分布模式研究[D];上海交通大学;2008年
5 黄正荣;基于壳—弹簧模型的盾构衬砌管片受力特性研究[D];河海大学;2007年
6 钟小春;盾构隧道管片土压力的研究[D];河海大学;2005年
相关硕士学位论文 前10条
1 申奇;盾构隧道圆形工作井围护结构优化研究[D];西南交通大学;2014年
2 刘贺丰;大直径圆形地下连续墙墙体厚度对基坑水平位移的影响[D];兰州大学;2014年
3 崔浩;高寒地区深竖井支护厚度优化[D];南华大学;2014年
4 王杰;考虑土拱效应的挡墙土压力理论研究[D];浙江大学;2014年
5 齐键旭;铁路隧道复合式衬砌计算模型及结构可靠度分析[D];石家庄铁道大学;2014年
6 宋晓蕊;大断面黄土隧道的扁平率及复合式衬砌受力研究[D];兰州理工大学;2013年
7 吴亭亭;地铁区间隧道复合式衬砌系统可靠度研究[D];石家庄铁道大学;2013年
8 彭信;隧道复合式衬砌计算模型及力学机理研究[D];石家庄铁道大学;2012年
9 张志华;盾构管片优化排版方法研究[D];华中科技大学;2012年
10 李鹏涛;TBM施工隧洞衬砌管片内力分析模型研究[D];西北农林科技大学;2009年
,本文编号:2139682