对公路隧道施工过程的力学分析及其数值模拟

发布时间:2018-07-26 08:13
【摘要】:虽然公路隧道工程的建设发展速度迅猛,但公路隧道相关理论及设计、施工技术的实践研究仍不够深入,本文依托某工程实例[1],对隧道中初期支护、二次衬砌两者的受力机理作深入研究;在改变二次衬砌刚度大小的情况下,研究二次衬砌厚度、弹性模量、泊松比以及隧道不同的埋深、改变两隧道间距离对支护体系受力性状的影响。用有限元软件FLAC[2]对该隧道作详细开挖支护数值分析,了解不同工况下隧道支护体系的内力和变形,发现左右隧道两个洞室存在相互影响;隧道中拱顶、拱腰处、仰拱中部都是受力中较为不利的薄弱位置,在设计时要做局部加强,施工时也要注意支护;通过对监测变量的分析,最大不平衡力最终趋于收敛,左右隧道支护体系拱顶的位移趋于稳定。当支护体系中二次衬砌的刚度变化时,随着二次衬砌厚度的增加,在拱顶、拱腰、拱脚处二次衬砌中围岩应力基本成线性增大,但当厚度到650mm时增加的速率有所减缓;而在拱肩处二次衬砌的应力变化大小不一,规律性不强;随着弹性模量的增加,会使拱腰、拱肩处二次衬砌中压应力变大,基本呈现线性变化,而对拱顶、拱脚处基本无影响;当改变泊松比的大小,对支护体系中二次衬砌的应力大小基本无影响;当二次衬砌的刚度增大时,不一定就会使得二次衬砌所分担的围岩压力有所增加,因为复合式衬砌的受力较为复杂,此时,还要继续分析影响刚度大小的具体因素。随着隧道埋深的增大,围岩的自重应力会相应增加,隧道支护体系中初期支护所受的围岩压力增大,这与我们主观感受的也相一致,而且增加的速率越来越快,二次衬砌的受力基本不变。随着左、右两隧道之间的距离增加时,右隧道对左隧道的影响减小,左隧道支护体系的受力减小,两隧道间的相互影响逐渐减弱。
[Abstract]:Although the construction of highway tunnel project is developing rapidly, the practical research on relevant theory and design and construction technology of highway tunnel is still not deep enough. This paper relies on an engineering example [1] to support the tunnel in the early stage. Under the condition of changing the stiffness of the secondary lining, the thickness, elastic modulus, Poisson's ratio and the different buried depth of the tunnel are studied. The influence of changing the distance between two tunnels on the mechanical behavior of supporting system. By using finite element software FLAC [2], the numerical analysis of the excavation and support of the tunnel is carried out in detail, and the internal force and deformation of the tunnel support system under different working conditions are understood, and it is found that the two caverns in the left and right tunnels have mutual influence on each other. The middle part of the inverted arch is the weak position in the stress, so it is necessary to strengthen it locally and to pay attention to the support in the construction. Through the analysis of the monitoring variables, the maximum unbalanced force tends to converge finally. The displacement of the vault of the left and right tunnel support system tends to be stable. When the stiffness of the secondary lining in the support system changes, with the increase of the thickness of the secondary lining, the stress of surrounding rock in the secondary lining at the arch top, arch waist and arch foot basically increases linearly, but the increase rate of the secondary lining increases slightly when the thickness reaches 650mm. With the increase of elastic modulus, the compressive stress in the arch waist and the secondary lining at the arch shoulder will become larger, showing a linear change, but there is no effect on the arch top and the arch foot, while the stress of the secondary lining at the arch shoulder is different, and the regularity is not strong, and with the increase of the elastic modulus, the compressive stress in the arch waist and the secondary lining at the arch shoulder will become larger and present a linear change. When the Poisson's ratio is changed, the stress of the secondary lining in the support system is not affected, and when the stiffness of the secondary lining is increased, the surrounding rock pressure of the secondary lining is not necessarily increased. Because the force of composite lining is more complicated, we should continue to analyze the specific factors that affect the stiffness. With the increase of the buried depth of the tunnel, the gravity stress of surrounding rock will increase accordingly, and the surrounding rock pressure of the initial support in the tunnel support system will increase, which is consistent with our subjective feelings, and the increasing rate is getting faster and faster. The force of the secondary lining is basically unchanged. With the increase of the distance between the left and right tunnels, the influence of the right tunnel on the left tunnel decreases, the force of the left tunnel support system decreases, and the interaction between the two tunnels weakens gradually.
【学位授予单位】:山东建筑大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U415;U455

【相似文献】

相关期刊论文 前10条

1 崔立将;;隧洞二次衬砌缺陷的产生原因及处理技术探讨[J];山西建筑;2008年12期

2 黄建良;石光荣;薛宁;夏德胜;王波;;兰渝线罗沙隧道非常规地段的二次衬砌施工[J];隧道建设;2010年02期

3 王超;聂玉文;李国安;;二次衬砌钢筋保护层安全影响性数值模拟分析[J];山西建筑;2010年36期

4 李德武;马为功;;二次衬砌施作时机的弹粘塑性有限元分析[J];现代隧道技术;2012年04期

5 王金;陈晓东;;浅谈公路隧道混凝土二次衬砌的施工技术[J];黑龙江科技信息;2012年33期

6 刘永华;;二次衬砌结构拱顶存在空洞或裂缝的数值模拟[J];公路隧道;2006年03期

7 耿长青;;余厝隧道洞体开挖与二次衬砌施工质量控制[J];安徽建筑;2010年02期

8 杜丰岩;王命平;赵铁军;;青岛地铁3号线二次衬砌混凝土耐久性设计[J];海岸工程;2011年03期

9 李婷婷;郑国荣;周明凯;李北星;;粉煤灰对二次衬砌混凝土性能的影响[J];粉煤灰综合利用;2009年03期

10 唐颖;公路隧道模注混凝土二次衬砌的设计[J];华东公路;1998年03期

相关会议论文 前5条

1 王光杰;;新奥法二次衬砌施工中几个问题的探讨[A];科技、工程与经济社会协调发展——河南省第四届青年学术年会论文集(下册)[C];2004年

2 王光杰;陈建平;;新奥法二次衬砌施工中几个问题的探讨[A];中国公路学会2002年学术交流论文集[C];2002年

3 陈永模;;北京地铁大跨度单拱单柱暗挖车站二次衬砌施工探讨[A];中国交通土建工程学术论文集(2006)[C];2006年

4 张凤翔;于宁;徐前卫;;降低管片成本的方法分析[A];中国土木工程学会第十二届年会暨隧道及地下工程分会第十四届年会论文集[C];2006年

5 范恒秀;;乌鞘岭特长隧道F_7断层围岩大变形段二次衬砌安全度分析[A];铁路长大隧道设计施工技术研讨会论文集[C];2004年

相关重要报纸文章 前5条

1 通讯员 梁文庸 记者 侯宪台;华冶马梧项目部精心打造样板工程[N];中国冶金报;2007年

2 记者 罗炜 杜鹏;谈山隧道实现全线贯通[N];黄石日报;2010年

3 崔武;八成土建结构任务完成[N];青岛日报;2010年

4 肖影邋赵光远;奉云高速公路分界梁隧道成为全线亮点工程[N];人民铁道;2007年

5 宋宝华邋罗进;太行山隧道左线石家庄方向掘至分界里程[N];人民铁道;2007年

相关硕士学位论文 前10条

1 伍圣华;岑溪大隧道二次衬砌结构安全性评价[D];长安大学;2015年

2 魏源泉;径向注浆对富水软弱围岩隧道二次衬砌的影响研究[D];重庆交通大学;2016年

3 夏文;浅埋暗挖地铁隧道二次衬砌受力特性研究[D];青岛理工大学;2016年

4 梁华尊;对公路隧道施工过程的力学分析及其数值模拟[D];山东建筑大学;2017年

5 张宁宁;高速铁路隧道二次衬砌力学特性研究[D];北京交通大学;2015年

6 周振华;隧道喷混凝土和二次衬砌强度无损检测与概率与分布特征分析[D];西南交通大学;2002年

7 潘世强;公路隧道动态施工过程数值模拟与二次衬砌结构安全性分析[D];重庆交通大学;2010年

8 王永辉;小坝田隧道支护结构优化及二次衬砌施作时机研究[D];兰州交通大学;2014年

9 刘永华;高速公路隧道安全性评价研究[D];西南交通大学;2004年

10 齐龙飞;初期支护设计方法优化及二次衬砌施作时机研究[D];石家庄铁道大学;2014年



本文编号:2145401

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2145401.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户8894a***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com