城市高架桥采用大跨径承台梁跨越地铁车站设计研究
发布时间:2018-08-26 09:25
【摘要】:沈阳市迎宾路高架桥工程部分线位与地铁1号线重叠,桥梁基础为避开地铁车站及区间,采用大跨度预应力承台梁接桩基方案跨越地铁结构。本文以该工程为背景,采用实体单元建立有限元模型,对典型跨度承台梁的施工及使用阶段进行受力分析。计算结果表明,设计方案安全可靠。为保证承台梁施工及运营期间地铁车站的结构安全,采用压顶梁、桩基础钢护筒跟进工艺、承台梁分部浇筑等施工措施,有效解决了车站结构主体抗浮问题,确保桥梁结构荷载不传递至车站结构主体。
[Abstract]:Some lines of the viaduct project of Yingbin Road in Shenyang City overlap with Metro Line 1. The bridge foundation is to avoid the subway station and section, and the long-span prestressed cap beam connecting pile foundation scheme is adopted to span the subway structure. Based on this project, the finite element model is established by using solid element, and the stress analysis of typical span cap girder is carried out in the stage of construction and use. The calculation results show that the design scheme is safe and reliable. In order to ensure the structural safety of the subway station during the construction and operation of the cap beam, the construction measures, such as pressing the top beam, following up the steel tube of the pile foundation and the partial pouring of the cap beam, have effectively solved the problem of anti-floating of the main body of the station structure. Ensure that the load of bridge structure is not transferred to the main body of station structure.
【作者单位】: 中铁九局集团有限公司勘察设计院;
【分类号】:U442.5
本文编号:2204431
[Abstract]:Some lines of the viaduct project of Yingbin Road in Shenyang City overlap with Metro Line 1. The bridge foundation is to avoid the subway station and section, and the long-span prestressed cap beam connecting pile foundation scheme is adopted to span the subway structure. Based on this project, the finite element model is established by using solid element, and the stress analysis of typical span cap girder is carried out in the stage of construction and use. The calculation results show that the design scheme is safe and reliable. In order to ensure the structural safety of the subway station during the construction and operation of the cap beam, the construction measures, such as pressing the top beam, following up the steel tube of the pile foundation and the partial pouring of the cap beam, have effectively solved the problem of anti-floating of the main body of the station structure. Ensure that the load of bridge structure is not transferred to the main body of station structure.
【作者单位】: 中铁九局集团有限公司勘察设计院;
【分类号】:U442.5
【相似文献】
相关期刊论文 前10条
1 刘爱国;混合结构中桩基础承台梁设计方法的探讨[J];铁道标准设计;1995年09期
2 方建辉,朱大明;墙梁法计算墙下桩基连续承台梁[J];西部探矿工程;2005年01期
3 李伟;张丽荣;;浅谈特定条件下承台梁的承载作用及施工要点[J];民营科技;2010年04期
4 茅卫兵;葛崇勋;陈蕾;;条形承台梁下单排管桩偏位时承台梁的配筋设计探讨[J];江苏建筑;2010年01期
5 刘慧;高洪波;马虹;;条形承台梁与桩基的有限元分析[J];山西建筑;2006年13期
6 谢晓明,刘凤伟,吴国宝;承台的设计计算[J];电力建设;1998年08期
7 邵同高,赵明华,徐文栋;考虑基桩承载力差异随机性的承台梁内力分析[J];湖南大学学报(自然科学版);2000年02期
8 刘全宇,刘曼;单排振动沉管灌注桩横向移位时承台梁的抗扭加固[J];建筑结构;2000年03期
9 于秀君;;对桩与承台下地基能否共同承受上部荷载的探讨[J];黑龙江科技信息;2003年02期
10 刘铮,,孙俊;考虑承台—桩—土共同工作的桩基计算分析[J];云南工业大学学报;1996年04期
相关会议论文 前1条
1 鄢玉英;;条形基础承台梁下桩与土共同工作分析[A];第十届全国结构工程学术会议论文集第Ⅱ卷[C];2001年
相关硕士学位论文 前1条
1 邵同高;桩—土—承台共同工作及随机概率分析[D];湖南大学;2002年