发布时间:2018-09-01 16:04
【摘要】:高温条件下稀浆混合料的可拌和时间显著缩短,直接影响微表处施工效果。通过提高集料温度及室外高温拌和摊铺,模拟实际工程中的高温情况,研究了乳化沥青生产时的乳化剂用量、拌和时的水泥用量、外加水量、外加水中添加乳化剂等措施,对常温和高温下改善可拌和时间的效果进行比较。结果表明:拌和时增加外加水中的乳化剂用量,是延长夏季高温时可拌和时间的有效措施。
[Abstract]:The mixing time of slurry mixture is shortened obviously under high temperature, which directly affects the construction effect of microsurfacing. By increasing the aggregate temperature and outdoor high temperature mixing and spreading, simulating the high temperature in the actual engineering, the paper studies the emulsifier dosage in emulsified asphalt production, the cement content in mixing, and the addition of emulsifier in water, etc. The effects of improving mixing time at room temperature and high temperature were compared. The results show that increasing the amount of emulsifier in added water during mixing is an effective measure to prolong the mixing time at high temperature in summer.
【作者单位】: 西安公路研究院;陕西高速机械化工程有限公司;
【基金】:陕西省交通运输厅2015年科技项目(编号:15-01K)
【分类号】:U414
本文编号:2217683
[Abstract]:The mixing time of slurry mixture is shortened obviously under high temperature, which directly affects the construction effect of microsurfacing. By increasing the aggregate temperature and outdoor high temperature mixing and spreading, simulating the high temperature in the actual engineering, the paper studies the emulsifier dosage in emulsified asphalt production, the cement content in mixing, and the addition of emulsifier in water, etc. The effects of improving mixing time at room temperature and high temperature were compared. The results show that increasing the amount of emulsifier in added water during mixing is an effective measure to prolong the mixing time at high temperature in summer.
【作者单位】: 西安公路研究院;陕西高速机械化工程有限公司;
【基金】:陕西省交通运输厅2015年科技项目(编号:15-01K)
【分类号】:U414
【相似文献】
相关期刊论文 前10条
1 李能富;曹晓凤;张秀梅;钱璞;;纤维微表处可拌和时间的影响因素分析[J];交通标准化;2011年01期
2 徐剑,秦永春;微表处混合料可拌和时间的影响因素[J];公路交通科技;2002年01期
3 弓锐;;稀浆封层混合料可拌和时间室内试验研究[J];公路;2012年12期
4 肖晶晶;宋哲玉;王振军;;微表处混合料可拌和时间的多因素影响规律研究[J];公路;2008年12期
5 秦俭;水泥稳定土路面基层过多含水量与拌和时间的影响[J];黑龙江交通科技;1995年04期
6 陈俊;侯中新;黄晓明;;稀浆混合料拌和仪在微表处混合料可拌和时间研究中的应用[J];公路交通科技;2007年11期
7 黄国威;刘飞虹;;基于正交试验研究微表处混合料可拌和时间影响因素[J];公路与汽运;2010年06期
8 项龙;;微表处稀浆混合料可拌和时间的影响因素及调整方法[J];福建建材;2014年02期
9 易征;周娜;;SBS改性乳化沥青微表处混合料可拌和时间试验研究[J];公路与汽运;2013年06期
10 邢艳新;慢裂快凝型乳化沥青稀浆封层机几个技术问题的探讨[J];辽宁交通科技;2000年03期
,本文编号:2217683
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2217683.html