超大水深及流速条件下铺排施工技术
[Abstract]:In connection with the first and second phase of the regulation of the 12.5 m deep water channel under the Yangtze River in Nanjing, the skateboard supported deep-water laying ship was adopted. In the first phase of the project, the deep-water laying construction under the condition of 35 m water depth and 2 m / s velocity was completed. The deep water laying construction method has been formed, and the laying construction under the condition of 46m super-deep water depth has been completed in the second phase of the project. This technology has innovated the construction method of the traditional waterway regulation and laying equipment using the sliding hoist floating laying equipment. The construction efficiency of paving can be up to 1 222.2 m2 / h, and the longest one piece is 642.6 m.
【作者单位】: 中交一航局第二工程有限公司;中国交建海岸工程水动力重点试验室;
【分类号】:U617
【参考文献】
相关期刊论文 前4条
1 冯海暴;徐加峰;周良玉;冯好娣;刘国辉;韩帅;;超短基线软体排深水水下定位检测系统设计思路[J];水运工程;2014年06期
2 冯海暴;;长江航道整治工程恶劣工况深水铺排悬链线理论研究及应用[J];中国港湾建设;2014年01期
3 刘德进;冯海暴;;用概率法结合ANSYS分析深水航道整治铺排锚缆在恶劣工况下的受力[J];水运工程;2013年12期
4 单国辉;李玉峰;;不同型号锚在粉细砂地质中锚抓力大小测定[J];科技创新导报;2013年05期
【共引文献】
相关期刊论文 前3条
1 冯海暴;曲俐俐;;超大水深及流速条件下铺排施工技术[J];水运工程;2017年02期
2 冯海暴;徐国明;;深水航道施工船舶间靠泊撞击力研究与取值分析[J];港工技术;2015年06期
3 阮学成;王翔;刘滔;;长江南京以下12.5m深水航道工程深水软体排设计施工[J];中国港湾建设;2014年12期
【二级参考文献】
相关期刊论文 前8条
1 焦永强;田维新;潘贤亮;;超短基线测量技术在铺排施工中的应用[J];中国港湾建设;2013年03期
2 吴济铭;马贺;刘海蛟;杜丽华;;某铺排船舷侧铰链板有限元计算分析[J];船舶工程;2012年S2期
3 吴学文;包更生;陶春辉;顾春华;张恺;;超短基线水下声学定位数据处理[J];杭州电子科技大学学报;2011年04期
4 石石;冉莉娜;;基于概率法的油气储量不确定性分析[J];天然气勘探与开发;2011年01期
5 周望;邱琼海;张全军;;泰州长江大桥南锚碇沉井空气吸泥下沉施工技术[J];铁道标准设计;2009年04期
6 方子帆;吴建华;;钢丝绳类索结构模型的动力学仿真研究[J];起重运输机械;2009年02期
7 谭庆;岳小静;;C++语言中引用的使用探讨[J];福建电脑;2007年10期
8 吴永亭,周兴华,杨龙;水下声学定位系统及其应用[J];海洋测绘;2003年04期
【相似文献】
相关期刊论文 前1条
1 贺松林;劳治声;;上海高桥石化公司拟建码头岸段水深条件分析[J];上海水利;1992年04期
,本文编号:2237152
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2237152.html