虎门二桥节段拼装桥梁设计与实践
[Abstract]:Segmental assembly is a technologically advanced construction method, which accords with the modern construction idea of energy saving, environmental protection, fast and high efficiency, and can bring huge social and economic benefits. In recent years, it has been gradually applied and popularized in our country. On the basis of reviewing and summing up the development of this construction method and the present research situation at home and abroad, taking the Humen second Bridge as the engineering background, this paper makes a detailed analysis and design of the segmental assembling bridge from the point of view of engineering optimization design. First of all, on the basis of collecting a large amount of data, through the comparison of the construction period, cost, construction difficulty and other factors, the structure form, prefabrication method and assembly method of the bridge are determined, and then the structural dimensions and segmental division of the structure are defined. According to the particularity of segmental assembling bridge, the joint, prestress system and pier top 0# block of segmental assembly are designed, and then the calculation formulas and methods of segmental assembly are summarized, and the design specifications of segmental assembling bridge are compared and selected. The static design calculation of the structure is carried out, and some design indexes of the segmental assembly structure are obtained. Finally, the key technology and technical requirements of the bridge construction are expounded in combination with the field visit. Through the above design comparison, structure calculation and analysis, the advanced nature and feasibility of this kind of structure are proved. The research results of this paper can be used as reference for the design of other prefabricated segmental continuous box girders.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U442.5
【相似文献】
相关期刊论文 前10条
1 陈彪;;桥梁预制节段拼装施工技术发展概述[J];筑路机械与施工机械化;2014年03期
2 柯家满;混凝土预制节段拼装式桥梁的施工[J];华中科技大学学报(城市科学版);2005年S1期
3 杨守梅;;地铁高架预制节段拼装梁的施工[J];山西建筑;2009年21期
4 田东权;;浅谈混凝土预制节段拼装式桥梁的施工[J];民营科技;2010年03期
5 P.C.Hoffman ,许宗毓;实验性混凝土节段拼装式桥梁的温度试验研究[J];国外桥梁;1986年01期
6 蒋海里;;桥梁预制节段拼装技术在城市建设中的应用[J];城市道桥与防洪;2010年09期
7 杨元春;;高速铁路节段拼装桥梁线型控制[J];科技创业家;2013年01期
8 杨忠强;;48m箱梁节段拼装关键技术研究[J];价值工程;2013年33期
9 张燕飞,黄燕庆;预制节段拼装混凝土桥梁耐久性探讨[J];桥梁建设;2005年S1期
10 高哲凝;;预制节段拼装架设桥梁的耐久性分析[J];中国水运(学术版);2007年10期
相关会议论文 前2条
1 何维利;;城市桥梁预制节段拼装技术研究[A];中国公路学会桥梁和结构工程分会2005年全国桥梁学术会议论文集[C];2005年
2 董荣杰;张保和;李海燕;符宏峰;;城市高架建设中的节段拼装技术[A];新世纪预应力技术创新学术交流会论文集[C];2002年
相关重要报纸文章 前1条
1 徐景明;集美大桥今日开始“拼装”[N];厦门日报;2007年
相关硕士学位论文 前10条
1 汪立立;预制节段拼装桥墩有限元分析[D];郑州大学;2015年
2 刘鹏;宝兰线三阳川大桥48m节段拼装梁施工技术研究[D];石家庄铁道大学;2015年
3 许佳林;虎门二桥节段拼装桥梁设计与实践[D];华南理工大学;2015年
4 刘丰;节段拼装预应力混凝土桥墩拟静力试验和分析研究[D];同济大学;2008年
5 刘鑫;干接缝节段拼装桥墩抗震性能地震台试验研究[D];重庆交通大学;2014年
6 蔡忠奎;榫卯接缝节段拼装桥墩抗震性能数值分析[D];哈尔滨工业大学;2014年
7 何通;预制节段拼装混凝土桥墩抗震性能研究[D];长安大学;2013年
8 刘少乾;预应力节段拼装混凝土桥墩拟静力试验研究及数值分析[D];重庆交通大学;2014年
9 王渊;城市高架轨道交通节段拼装桥梁施工及控制技术研究[D];中南大学;2008年
10 王英;城市桥梁预制箱梁节段拼装关键技术的研究[D];西南交通大学;2011年
,本文编号:2273744
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2273744.html