当前位置:主页 > 科技论文 > 路桥论文 >

非对称大吨位预制箱梁分幅架设试验研究

发布时间:2018-10-16 16:41
【摘要】:近年来,预制装配化技术以其施工速度快、安全、环保及对周围交通环境影响小等优点在桥梁建设中得到了越来越广泛的应用。作为桥梁上部结构,大吨位整孔预制混凝土箱梁也顺应着时代在逐渐发展。大吨位整孔预制箱梁架设技术的发展对我国城市化建设及桥梁建设水平的提高有积极的影响。当在既有道路上修建高架桥时,由于受已有道路宽度要求的限制,非对称大吨位预制混凝土箱梁的使用,必将成为桥梁建设发展的必然趋势。目前主要对对称大吨位预制箱梁架设过程中箱梁及下部结构受力情况进行了研究,对非对称大吨位预制箱梁分幅架设过程中箱梁及下部结构受力情况研究相对较少。某高速公路工程桥梁上部结构为非对称大吨位混凝土箱梁,采用工厂化集中预制、梁上运梁、分幅架设的技术方案,在我国陆地常规公路桥梁中首次采用。为更加深入的了解非对称大吨位预制箱梁分幅架设过程中箱梁及下部结构的受力情况,本文依托工程背景,采用有限元数值分析和现场试验测试的方法,对箱梁及下部结构的受力情况进行研究。主要有以下研究内容:(1)对非对称大吨位预制箱梁分幅架设施工工艺进行介绍,明确箱梁分幅架设过程中各荷载工况。运用Midas/Civil建立非对称大吨位预制箱梁梁单元有限元模型,并采用架梁过程中各荷载工况对箱梁进行加载得到相应分析结果。研究表明,运梁车运梁到位工况为箱梁最不利工况;(2)运用ANSYS对箱梁进行最不利工况和横移到位工况下实体单元模型分析,以研究箱梁局部受力情况。研究表明,箱梁在最不利工况下纵向拉应力变化最大值出现在跨中短翼缘侧底腹板,压应力变化最大值出现在跨中短翼缘侧顶腹板;箱梁横向拉应力变化最大值出现在横移到位工况下架桥机中支腿之间;(3)对非对称大吨位预制箱梁分幅架设过程中箱梁及下部结构在各工况下的受力状态进行现场试验测试分析,比较箱梁和下部结构在各工况下的受力差异,并与理论结果进行比较。通过研究发现,运梁车运梁到位工况为箱梁最不利工况,横移到位工况为下部结构最不利工况,实测结果与理论计算结果吻合较好。
[Abstract]:In recent years, prefabricated assembly technology has been more and more widely used in bridge construction because of its advantages such as fast construction speed, safety, environmental protection and small impact on the surrounding traffic environment. As the superstructure of the bridge, the large-tonnage prefabricated concrete box girder conforms to the development of the times. The development of large-tonnage prefabricated box girder erection technology has a positive impact on the urbanization construction and the improvement of bridge construction level in China. When the viaduct is built on the existing road, the use of asymmetric large-tonnage precast concrete box girder is bound to become the inevitable trend of the bridge construction development due to the restriction of the width of the existing road. At present, the stress situation of box girder and its substructure during the erection of symmetrical large-tonnage prefabricated box girder is mainly studied, and the research on the stress situation of box girder and its substructure in the course of asymmetric large-tonnage precast box girder erection is relatively few. The superstructure of a highway bridge is an asymmetric large-tonnage concrete box girder, which is first adopted in the conventional highway bridges on land in our country. In order to understand the stress of the box girder and its substructure during the erection of asymmetric large-tonnage prefabricated box girder, the finite element numerical analysis and field test method are adopted in this paper, based on the engineering background. The stress of box girder and substructure is studied. The main research contents are as follows: (1) the construction technology of asymmetric large-tonnage prefabricated box girder is introduced. The finite element model of asymmetric large-tonnage prefabricated box girder element is established by using Midas/Civil, and the corresponding analysis results are obtained by loading the box girder under various load conditions during the beam erection process. The results show that the most unfavorable condition of the box girder is the working condition of carrying beam in place. (2) using ANSYS to analyze the entity element model of the box girder under the most unfavorable working condition and the transversely moving condition to study the local force situation of the box girder. The results show that the maximum of longitudinal tensile stress of box girder under the most unfavorable working condition appears in the side web of span short flange and the maximum of compressive stress appears in the top web of side top of span short flange. The maximum change of transverse tensile stress of box girder appears between the supporting legs of the bridge erector under the condition of transverse displacement. (3) the field test and analysis of the stress state of the box girder and its substructure under various working conditions during the erection of asymmetric large-tonnage prefabricated box girder are carried out. The stress differences between box girder and substructure under different working conditions are compared and compared with the theoretical results. Through the research, it is found that the box girder is the most unfavorable working condition and the transversal position is the most unfavorable working condition. The measured results are in good agreement with the theoretical calculation results.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U445.4;U446

【相似文献】

相关期刊论文 前10条

1 段坚;;客运专线预制箱梁防裂纹施工措施[J];山西建筑;2009年18期

2 周彪;;浅析预制箱梁混凝土质量通病的防治措施[J];科技与企业;2013年03期

3 何家祥;在特殊场地架设大吨位预制箱梁的施工工艺[J];公路交通技术;2002年01期

4 沈阳云;东海大桥预制箱梁滑移运输施工技术[J];公路;2004年05期

5 白建文;浅谈预制箱梁施工的质量控制[J];山西交通科技;2004年S1期

6 沈阳云,郑机;东海大桥2000t预制箱梁滑移运输工艺研究[J];铁道工程学报;2005年02期

7 王万文;;洋河大桥预制箱梁施工工艺控制[J];河北工程技术高等专科学校学报;2006年01期

8 李兴旺;;预制箱梁混凝土质量通病成因及防治措施[J];科技资讯;2007年06期

9 李其惠;;高速铁路预制箱梁耐久性混凝土质量控制[J];科技资讯;2007年20期

10 刘泾堂;;后张法预应力混凝土预制箱梁的施工工艺[J];城市道桥与防洪;2007年09期

相关会议论文 前10条

1 李攀;朱湖;;浅谈预制箱梁施工[A];土木建筑学术文库(第13卷)[C];2010年

2 沈阳云;郑机;;东海大桥2000t预制箱梁滑移运输工艺研究[A];科技、工程与经济社会协调发展——中国科协第五届青年学术年会论文集[C];2004年

3 白建文;;浅谈预制箱梁施工的质量控制[A];长治—晋城高速公路总结大会专辑[C];2004年

4 吴东华;;预制箱梁施工质量管控要点[A];2012年中铁隧道集团低碳环保优质工程修建技术专题交流会论文集[C];2012年

5 李树德;;铁路客运专线900 t级双线预制箱梁液压内模的研究[A];客运专线工程技术学术研讨会论文集(上)[C];2008年

6 范海花;曹洪亮;;30米预制箱梁安装、运输计算[A];公路交通与建设论坛(2009)[C];2010年

7 赵剑发;谭国顺;王毅;;杭州湾跨海大桥70m预制箱梁海工耐久混凝土裂缝控制技术[A];中国公路学会桥梁和结构工程分会2005年全国桥梁学术会议论文集[C];2005年

8 房会彬;黄敏;;客运专线900t预制箱梁横移技术[A];河南省铁道学会2007年学术活动月优秀论文选集[C];2007年

9 房会彬;黄敏;;客运专线900t预制箱梁横移技术[A];河南省铁道学会2007年学术活动月优秀论文集[C];2007年

10 房会彬;黄敏;;客运专线900t预制箱梁横移技术[A];第十届中国科协年会中部地区物流产业体系建设论坛专辑[C];2008年

相关重要报纸文章 前10条

1 记者 尹登明 通讯员 彭英 王孚;十天高速35标预制箱梁浇注完毕[N];中国铁道建筑报;2010年

2 伍振 王桂辉;青藏高原首孔900吨 简支预制箱梁成功架设[N];中华建筑报;2011年

3 记者 王立武 通讯员 刘亚林;十六局集团郑西客专喜讯连连[N];中国铁道建筑报;2006年

4 通讯员 刘桂萍 余立强;我国客运专线首片900吨有砟轨道钢筋混凝土预制箱梁诞生[N];人民铁道;2006年

5 记者 施育玲;我市向通火车迈进一大步[N];汕尾日报;2009年

6 张天国;青春的乐章[N];科技日报;2007年

7 石治荣邋洪克林;金塘大桥60米预制箱梁蒸汽养护自动化控制技术通过鉴定[N];人民铁道;2008年

8 刘福昌 管清慧;为彭城添新彩[N];中国铁道建筑报;2000年

9 记者 朱宇邋徐本梁 王新杰;一座大桥创造5项“世界第一”[N];宁波日报;2007年

10 吴晓月邋陈红梅 吴远根;杭州湾大桥创造五项“世界第一”[N];中国建设报;2007年

相关硕士学位论文 前8条

1 王雪莲;青海高原地区预制箱梁混凝土质量控制技术研究[D];长安大学;2015年

2 张军豪;非对称大吨位预制箱梁分幅架设试验研究[D];郑州大学;2017年

3 郭瑞;武广客运专线900吨预制箱梁施工关键技术研究[D];中国地质大学(北京);2010年

4 李圣荣;现浇箱梁暨预制箱梁施工关键技术[D];同济大学;2008年

5 毛元平;客运专线预应力混凝土预制箱梁高性能混凝土配合比研究[D];长安大学;2010年

6 唐维军;高速铁路预制箱梁内模的研究与开发[D];上海交通大学;2010年

7 王立军;铁路客运专线大吨位预制箱梁制、移、运、架施工技术研究[D];同济大学;2007年

8 郭阔;桥面整体化层与预制箱梁共同工作性能有限元分析[D];长安大学;2009年



本文编号:2275004

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2275004.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f9e5b***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com