大跨度斜拉桥运营期性能监测与评估
[Abstract]:In order to study the performance monitoring and evaluation method of long-span cable-stayed bridges during operation, and to establish a stable and efficient health monitoring system, based on summarizing the problems existing in the health monitoring of cable-stayed bridges in the past, The following aspects are studied: 1. Aiming at the characteristics of the large number of sensors in cable-stayed bridge, the topology of the network system is optimized and applied by bus technology. The sensor system is set up as a comprehensive system of fieldbus network structure combined with star network structure, and the layout scheme of cable-stayed bridge based on bus-type fiber-optic sensor network is studied. Especially, the structure optimization scheme based on bus technology and the wireless transmission scheme of system monitoring information are studied. 2. The characteristics of nonlinear vibration of cable-stayed bridge are analyzed, and the nonlinear vibration of cable is analyzed. The nonlinear internal resonance, parametric vibration and vortex vibration are theoretically analyzed and calculated. Based on the analysis results, a method for evaluating the overall vortex-vibration stability of cable system (cable system vortex-induced vibration stability, CSVVS) is proposed. On the basis of wind environment monitoring information and cable frequency information, the operation state of cable is evaluated as a whole and the potential operational risk is forecasted. 3. Based on the existing data analysis software, rain flow counting analysis method is adopted. The fatigue load spectrum of structures and components is statistically analyzed, and the fatigue is evaluated based on the statistical results, and a fitting analysis method based on a small amount of test data is given. It is pointed out that when the test data are complete, the statistical analysis method should be used first, so as to avoid the analysis error caused by missing the isolated amplitude value of the fitting analysis method. An improved rain flow analysis program is developed on the Maple platform. The validity of the algorithm is verified by the human working graph analysis of a set of simulated data. 4. The corrosion of the cable system is considered to be an important factor affecting the durability and safety of the structure. Because the corrosion monitoring of cable system is still in the primary stage, based on the analysis and summary of various monitoring methods, the paper puts forward the anchor video monitoring combined with cable end acoustic emission monitoring. In view of the efficiency of CWT calculation, the discretization of CWT is studied in view of the comprehensive monitoring scheme of self-climbing flux leakage monitoring in the middle part of cable body. Due to the characteristic of repeated calculation of multiple discrete dot products in DWT at present, an algorithm with translation parameter b is proposed, and a DWT algorithm with parameters is compiled on the basis of the general mathematical analysis software Maple. The damage analysis of DWT applied to time-domain test is verified by the established cable-stayed bridge model under selected time-history load conditions. The results show that DWT inherits all the advantages of CWT. This method can effectively identify the structural damage related information contained in the time-history data, at the same time, the computational efficiency is significantly improved compared with the traditional method. 6, in view of the variety of failure forms of cable-stayed bridge, In this paper, several typical failure modes are studied. It is pointed out that the deflection and stress failure of the main beam are the most basic failure modes of cable-stayed bridges based on cable stress failure. The reliability of the structure is analyzed by Monte Carlo random sampling and multi-parameter response surface analysis.
【学位授予单位】:西南交通大学
【学位级别】:博士
【学位授予年份】:2015
【分类号】:U446;U448.27
【相似文献】
相关期刊论文 前10条
1 刘扬熙;斜拉桥拉索参数共振现象的理论分析[J];乐山师范学院学报;2000年03期
2 谭也平,szu.edu.cn;斜拉桥初应变增量索力调整[J];深圳大学学报;2000年01期
3 乐鹏飞;;低塔斜拉桥[J];海威姆预应力技术;2001年01期
4 高德虎,刘桂凤,苏达根;斜拉桥拉索失效分析探讨[J];广东公路交通;2002年04期
5 邹小燕,黎世彬;《斜拉桥热挤聚乙烯高强钢丝拉索技术条件》的编制及应用[J];公路;2002年11期
6 王伯惠;斜拉桥拉索静力计算[J];公路;2003年06期
7 王俊义;国内第一座部分斜拉桥——漳州战备大桥设计[J];华东公路;2003年01期
8 王修勇,陈政清中南大学 ,倪一清;斜拉桥拉索风雨振观测及其控制[J];土木工程学报;2003年06期
9 陈水生,秦鸣,陈勇,孙炳楠;斜拉桥拉索的振动及控制现场试验[J];长安大学学报(自然科学版);2003年02期
10 经柏林,谢华鸾;斜拉桥拉索研究综述[J];中国市政工程;2003年06期
相关会议论文 前10条
1 项海帆;史家钧;;斜拉桥的拉索振动及其控制[A];全国索结构学术交流会论文集[C];1991年
2 何宪飞;陈艾荣;项海帆;;多跨斜拉桥斜拉索疲劳分析[A];中国土木工程学会桥梁及结构工程学会第十三届年会论文集(上册)[C];1998年
3 乐鹏飞;;低塔斜拉桥[A];二○○○年湖北省桥梁学术讨论会论文集(下册)[C];2000年
4 詹胜;徐幼麟;沈其民;周海俊;;斜拉桥拉索风雨振动试验新装置[A];第15届全国结构工程学术会议论文集(第Ⅲ册)[C];2006年
5 李寿英;陈政清;;斜拉桥拉索安装亮化灯具的风致稳定性研究[A];第16届全国结构工程学术会议论文集(第Ⅱ册)[C];2007年
6 李毅佳;陈志华;王小盾;;斜拉桥索的抑振措施研究[A];第六届全国现代结构工程学术研讨会论文集[C];2006年
7 顾明;黄麟;王国砚;;斜拉桥拉索风雨激振机理的理论研究[A];第八届全国振动理论及应用学术会议论文集摘要[C];2003年
8 余康烨;杨文兵;;中跨斜拉桥拉索振动及其抑振研究[A];第二届湖北省力学学会青年学术研讨会论文集[C];2006年
9 钱雪松;;斜拉桥拉索的减振措施[A];中国公路学会桥梁和结构工程分会2004年全国桥梁学术会议论文集[C];2004年
10 周亚刚;孙利民;;斜拉桥减振辅助索的参数分析[A];第八届全国振动理论及应用学术会议论文集摘要[C];2003年
相关重要报纸文章 前2条
1 徐兰山;激情化作彩虹飞[N];科技日报;2004年
2 李雪林;让桥梁在大风中巍然屹立[N];文汇报;2008年
相关博士学位论文 前10条
1 陈向东;轻轨车辆与斜拉桥动态耦合系统的数值模拟方法及应用[D];上海交通大学;2009年
2 雷宇;组合梁斜拉桥静力稳定性研究[D];西南交通大学;2009年
3 侯立群;大型斜拉桥基于健康监测的模型修正、损伤诊断与预警方法[D];哈尔滨工业大学;2009年
4 唐涛;斜拉桥结构体系使用安全性评估理论与方法研究[D];同济大学;2006年
5 赵翔;拉索损伤对斜拉桥结构性能影响的研究[D];东南大学;2005年
6 王福春;预应力混凝土折线塔斜拉桥力学特性的研究[D];东北大学;2011年
7 王修勇;斜拉桥拉索振动控制新技术研究[D];中南大学;2002年
8 江锋;薄壁箱梁混合单元及其在斜拉桥双重非线性分析中的应用研究[D];中南大学;2004年
9 禹见达;磁流变阻尼器对斜拉桥拉索振动控制的理论与试验研究[D];湖南大学;2007年
10 布占宇;斜拉桥地震响应分析中的索桥耦合振动和阻尼特性研究[D];浙江大学;2005年
相关硕士学位论文 前10条
1 杨新刚;索力变化对斜拉桥特性及承载能力的影响[D];大连理工大学;2009年
2 周国凯;大跨度组合梁斜拉桥静力稳定性分析[D];西南交通大学;2009年
3 韩福前;天津永定河斜拉桥维修加固关键技术研究[D];天津大学;2009年
4 李健伟;拉索损伤的斜拉桥静动力分析和试验[D];东北林业大学;2010年
5 高大卫;斜拉桥结构系统可靠性分析[D];南京林业大学;2010年
6 闫翔宇;新型斜拉桥和摩天轮组合结构研究[D];天津大学;2004年
7 杨正华;斜拉桥结构体系及力学性能研究[D];西安建筑科技大学;2006年
8 汪波;斜塔无背索部分斜拉桥结构设计计算研究[D];东南大学;2006年
9 王胜;部分斜拉桥的结构行为与设计实践[D];西南交通大学;2004年
10 扈春霞;斜拉桥三维可视化的研究[D];大连理工大学;2008年
,本文编号:2284206
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2284206.html