池州长江公路大桥主桥桥塔上横梁锚固结构设计

发布时间:2018-10-31 13:52
【摘要】:池州长江公路大桥主桥为主跨828m的双塔双索面单侧混合梁斜拉桥。桥塔上塔柱设置6道钢结构上横梁,上横梁均采用箱形断面,竖向中心距均为13.5m。单个钢横梁长7m、宽5.5m、高7m,划分为4个块段,各块段间采用M30高强度螺栓进行拼接。斜拉索分组锚固于各道钢横梁横隔板之间的锚固构造内,形成索塔体外锚固体系。钢横梁端部与桥塔上塔柱接触位置设置预埋钢板,通过高强度螺杆及剪力钉将钢横梁与混凝土上塔柱牢固连接。每道钢横梁外部设置封闭钢珠结构。采用有限元软件对桥塔上横梁锚固结构进行受力分析,结果表明结构受力均满足规范要求。
[Abstract]:The main bridge of Chizhou Changjiang River Highway Bridge is a cable-stayed bridge with two towers and two cable-plane single side mixed beams with main span of 828 m. There are 6 steel structure upper crossbeams on the tower, all of them adopt box section, and the vertical center distance is 13.5m. The single steel beam is 7 m long, 5.5 m wide and 7 m high. It is divided into 4 blocks, and M30 high strength bolts are used in each segment. The cable-stayed cable group is anchored in the Anchorage structure between the steel beams and the transverse divisions to form the external Anchorage system of the cable tower. A steel plate is set at the end of the steel beam and the tower column of the bridge tower. The steel crossbeam is firmly connected with the tower column of concrete by high strength screw and shear nail. Each steel beam is provided with a closed steel ball structure outside. The finite element software is used to analyze the stress of the Anchorage structure on the bridge tower, and the results show that the stress of the structure meets the requirements of the code.
【作者单位】: 中铁大桥勘测设计院集团有限公司;
【分类号】:U448.27

【相似文献】

相关期刊论文 前6条

1 王福田;;大型水压机上横梁安装精益求精[J];冶金建筑;1964年05期

2 常志军;;南宁大冲邕江特大桥北岸索塔上横梁施工技术[J];铁道建筑技术;2014年S1期

3 徐维生,王凤莲,牟春雷;松花江斜拉桥主塔上横梁的施工工艺[J];黑龙江交通科技;2003年08期

4 易季爰;宋达;易继武;;荆岳长江公路大桥29~#墩索塔上横梁施工新工艺[J];中外公路;2010年05期

5 陈文博;;高空大吨位预应力混凝土上横梁施工技术[J];公路交通科技(应用技术版);2013年03期

6 ;[J];;年期

相关硕士学位论文 前1条

1 王瀚;板桁结合斜拉桥钢桥面板支撑体系受力分析及构造优化研究[D];长沙理工大学;2015年



本文编号:2302433

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2302433.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户366da***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com