公路工程新旧估算指标对比分析
发布时间:2018-12-18 14:05
【摘要】:该文通过西藏国道317线岗托至江达段某隧道新建工程工可估算编制案例,使用新估算编制办法及配套指标对其进行测算,对比新旧估算,分析两者主要差异,测算及验证新估算指标的调整幅度和指标水平的合理性。
[Abstract]:In this paper, a case study on the estimation of a new tunnel built in Jiangda section from Gangtuo to Jiangda section of Tibet National Road 317 is carried out, and the new method and supporting indexes are used to calculate it. The main differences between the two are analyzed by comparing the new and old estimates. Calculate and verify the adjustment range of the new estimate index and the rationality of the index level.
【作者单位】: 中交第二公路勘察设计研究院有限公司;
【分类号】:U415.13;U455.1
本文编号:2385956
[Abstract]:In this paper, a case study on the estimation of a new tunnel built in Jiangda section from Gangtuo to Jiangda section of Tibet National Road 317 is carried out, and the new method and supporting indexes are used to calculate it. The main differences between the two are analyzed by comparing the new and old estimates. Calculate and verify the adjustment range of the new estimate index and the rationality of the index level.
【作者单位】: 中交第二公路勘察设计研究院有限公司;
【分类号】:U415.13;U455.1
【相似文献】
相关期刊论文 前1条
1 杜稳平;;估算指标的编制程序及有关问题的探讨[J];中国公路;2002年21期
,本文编号:2385956
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2385956.html