大型垂直升船机钢丝绳组件安装技术
[Abstract]:Aiming at the characteristics and difficulties of wire rope assembly installation of large vertical ship lift and the deficiency of traditional installation method, a scientific and practical installation technique and operation method of wire rope assembly for ship lift are put forward. Some technical measures, such as precise location of wire rope exit point, full winding of multi-rope common groove combined with rope winding frame, are adopted to solve the problems of large installation quantity, large rope diameter, narrow construction site, long and short rope common groove winding. The technology has been applied in Jinghong, three Gorges and other ship lift projects, and the effect is remarkable.
【作者单位】: 中国葛洲坝集团机电建设有限公司;
【分类号】:U642.61
【相似文献】
相关期刊论文 前10条
1 ;世界首座全平衡钢丝卷扬垂直升船机在闽江水口电站投入试通航[J];水利科技;2005年02期
2 ;2,000吨卷扬式垂直升船机[J];水运工程;1976年03期
3 牛智仁;高坝大型湿运垂直升船机的保安和升降平稳问题[J];水运工程;1992年05期
4 李波;大型垂直升船机制造成功[J];起重运输机械;1998年01期
5 ;两院院士潘家铮副院长在岩滩垂直升船机新技术研究及应用技术鉴定会上的讲话[J];红水河;2000年04期
6 禾;我国第一台垂直升船机在岩滩枢纽试运行成功[J];珠江水运;2000年04期
7 周贞;清江高坝洲垂直升船机方案比选[J];水力发电;2002年03期
8 彭雪松;夹江厂生产的岩滩垂直升船机获奖[J];水力发电;2002年07期
9 龙文;吴伟;;陆水枢纽垂直升船机下降限位研究[J];长江工程职业技术学院学报;2005年04期
10 闵朝斌;浮筒式垂直升船机[J];水运工程;2005年03期
相关会议论文 前5条
1 徐秋生;石端伟;邹怀武;;基于虚拟样机技术的大型垂直升船机机电耦合研究[A];制造业与未来中国——2002年中国机械工程学会年会论文集[C];2002年
2 黄文利;;向家坝水电站一级垂直升船机设计[A];水工机械技术2008年论文集[C];2007年
3 徐勋倩;吴胜兴;殷鹏威;;龙滩垂直升船机设计风压的确定[A];第十届全国结构工程学术会议论文集第Ⅰ卷[C];2001年
4 谭守林;;思林水电站500t级垂直升船机设计布置[A];水工机械技术2008年论文集[C];2007年
5 汪云祥;扈晓雯;;水口水电站2×500t级垂直升船机总体设计[A];水工机械技术2008年论文集[C];2007年
相关重要报纸文章 前1条
1 记者 周呈思 通讯员 惠斌;三峡垂直升船机进入全面建设[N];湖北日报;2013年