后张预应力节段拼装CFST桥墩抗侧力学行为试验
[Abstract]:In order to develop a new type of prefabricated bridge structure system with green, high efficiency and recoverable function, a new type of prefabricated pier with concrete filled steel tube (CFST) is proposed. This paper introduces the key structure, stress state and mechanical behavior characteristics of CFST pier assembled with post-tensioned prestressing section, and establishes the design method of its key components. The test model specimen was designed and manufactured, and the pseudostatic test of lateral reciprocating loading of CFST pier was carried out, which revealed the hysteretic behavior, skeleton curve and prestress loss during horizontal reciprocating loading. Nonlinear mechanical behaviors such as energy dissipation capacity, joint opening between segments, slippage of joints between segments and plastic hinge development. The results show that the post-tensioned CFST pier has high lateral resistance and good self-reset performance, and the residual deviation rate is 0.2 when the lateral bearing capacity fails; Horizontal reciprocating displacement will cause a large loss of prestress. When failure occurs, when the maximum displacement deviation rate of horizontal displacement is 5.8, the loss of prestressing force is about 15. There is a double plastic hinge effect on the prefabricated CFST pier column, the opening of the bottom joint is larger, and the amount of the opening at the upper adjacent joint decreases significantly. After testing, there is no obvious horizontal displacement or dislocation at the joint, no obvious damage to the pier body of the precast segment, and a small amount of concrete in the steel tube in the stress concentration area at the bottom joint, which leads to the local yield of the steel tube. The energy dissipation capacity of the post-tensioned prestressed segment piers without additional energy dissipation devices is poor. It is suggested that energy dissipation devices should be installed at the joint opening. The research results can provide important reference for self-reset prefabricated CFST pier design and performance optimization.
【作者单位】: 北京工业大学城市与工程安全减灾教育部重点实验室;招商局重庆交通科研设计院有限公司桥梁工程结构动力学国家重点实验室;北京市政路桥管理养护集团有限公司;
【基金】:国家自然科学基金项目(51378033,51578030) 北京市自然科学基金项目(8162007)
【分类号】:U446.1
【相似文献】
相关期刊论文 前10条
1 张家鑫;;后张预应力轻型钢结构[J];建筑结构;1993年03期
2 陈瑜;在后张预应力桥测缺中的冲击频谱效应(择译)[J];工程质量;1998年03期
3 张建梅;;后张预应力梁板质量通病分析及防治[J];今日科苑;2013年24期
4 高波,张宝华;后张预应力法在加固码头结构构件中的应用[J];水道港口;2003年02期
5 陈艳辉;;后张预应力梁施工及检测[J];中国西部科技;2006年25期
6 关颖;;后张预应力施工的质量通病及其防治[J];科技资讯;2008年13期
7 龙云;;后张预应力体系施工故障矫治初探[J];施工技术;2009年S1期
8 王军伟;;后张预应力大孔板施工探讨[J];河南建材;2010年05期
9 李闯;;预制T梁施工中后张预应力技术的操作要点分析[J];才智;2011年04期
10 ;信息[J];工业建筑;2012年06期
相关会议论文 前9条
1 J.Martin;M.hardy;A.Usmani;M.Forde;陈瑜;;在后张预应力桥测缺中的冲击频谱效应[A];第十届全国混凝土及预应力混凝土学术交流会论文集[C];1998年
2 安琳;姬旭波;;灌浆空洞对后张预应力结构体系性能的影响研究现状[A];全国既有桥梁加固、改造与评价学术会议论文集[C];2008年
3 周建民;于少伦;吴健宏;;后张预应力凸齿块张拉端节点分析及配筋方法研究[A];“发展绿色技术,建设节约结构”——第十四届全国混凝土及预应力混凝土学术会议论文集[C];2007年
4 杨宇洲;;后张预应力管检测新技术:扫描式冲击回波方法简介[A];第九届后张预应力学术交流会论文集[C];2006年
5 房贞政;上官萍;;后张预应力先简支后连续梁桥结构体系研究[A];第五届后张预应力混凝土学术交流会论文集[C];1997年
6 张德锋;胡祖光;龚剑;钟麟强;;上海市《后张预应力施工规程》修订介绍[A];第十一届后张预应力学术交流会论文集[C];2011年
7 王绍义;;上海后张预应力新材料的开发和应用[A];第八届后张预应力学术交流会论文集[C];2004年
8 华少锋;刘航;;某多层砖混房屋后张预应力加固技术研究及应用[A];第四届全国建筑结构技术交流会论文集(下)[C];2013年
9 赵赤云;;后张预应力楼盖板设计的挠度控制方法[A];第九届全国结构工程学术会议论文集第Ⅱ卷[C];2000年
相关重要报纸文章 前1条
1 薛庆 郭延辉 郭京育 赵霄龙;后张预应力孔道灌浆专用外加剂及其工程应用[N];中国建材报;2006年
相关硕士学位论文 前2条
1 刘平伟;30米T梁后张预应力耐久性监测系统试验研究[D];广西工学院;2011年
2 华少锋;既有砖砌体结构后张预应力抗震加固技术研究[D];北京建筑大学;2013年
,本文编号:2395480
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2395480.html