混凝土自锚式悬索桥合理成桥状态及体系转换研究
[Abstract]:The self-anchored suspension bridge has been paid more and more attention by the engineering field because of its beautiful appearance, good force shape and advantages not constrained by geological conditions. However, its special and reasonable completion state calculation method and construction sequence make how to determine the reasonable completion state and system transition scheme of self-anchored suspension bridge has always been the focus and difficulty of this kind of bridge type research. The aim of this paper is to obtain a reasonable state calculation method of self-anchored suspension bridge, which can meet the requirement of accuracy and avoid the complexity of nonlinear finite element calculation, and summarize the methods and steps to determine the conversion scheme of self-anchored suspension bridge system. At the same time, the system conversion scheme of the bridge is determined. In this paper, the existing main cable alignment calculation theory of suspension bridge is quoted: parabola method, piecewise catenary method and node method. The corresponding calculation program is compiled according to the algorithm, and the error of calculation results of each theory is compared by an example. Secondly, the reasonable completed bridge state calculation method based on influence matrix is improved and innovatively applied to self-anchored suspension bridge. Then, the applicability and accuracy of the calculation method are verified based on the actual engineering background of Nanjing Xiaolong Bay Bridge. Finally, the system transformation of self-anchored suspension bridge is studied. Taking Xiaolong Bay Bridge as an example, the determination method of cable tension scheme is described in detail. The feasible tensioning scheme is put forward and the optimal scheme is selected according to the advantages and disadvantages of each scheme and the field conditions. The results show that the piecewise catenary method is the most accurate method for calculating the main cable shape of suspension bridge, so the corresponding calculation program is selected below to calculate the reasonable completion state of the bridge. The reasonable completion state calculation method of self-anchored suspension bridge based on the influence matrix has high applicability and accuracy, and the determined suspension cable tension scheme is effective, which makes the example bridge transfer to the reasonable completed bridge state smoothly. So far, for the main cable shape, reasonable completed state and system transition scheme of self-anchored suspension bridge with similar examples, a set of mature calculation flow has been obtained in this paper, and a new reasonable calculation method for the completed bridge state has been obtained by breaking through the conventional method of calculating the main cable shape, the reasonable completion state and the system transition scheme of the self-anchored suspension bridge. The method of cable tension can be used as a reference for similar bridge type.
【学位授予单位】:南京理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U448.25
【参考文献】
相关期刊论文 前10条
1 杨继承;张钤;;自锚式悬索桥体系转换施工控制研究[J];重庆交通大学学报(自然科学版);2016年01期
2 戴杰;屈骏;乔建刚;秦凤江;;基于有效约束集法的混合梁斜拉桥合理成桥状态确定方法[J];科技导报;2014年34期
3 王超;檀永刚;韩义乐;;基于ANSYS与SiPESC.OPT的自锚式悬索桥合理成桥索力优化[J];沈阳大学学报(自然科学版);2013年06期
4 蔡迎春;万超;郑元勋;;中国自锚式悬索桥发展综述[J];中外公路;2013年04期
5 田志勇;唐茂林;蒲黔辉;;宁波庆丰桥静、动载试验研究[J];桥梁建设;2012年05期
6 景天虎;李桅;李青宁;张品乐;;悬索桥主缆线形确定的常用精确解析算法比较及电算高效实现方法研究[J];西安建筑科技大学学报(自然科学版);2011年06期
7 张俊平;黄海云;刘爱荣;梅力彪;李永河;;空间缆索自锚式悬索桥体系转换过程中受力行为的全桥模型试验研究[J];土木工程学报;2011年02期
8 柯红军;李传习;张玉平;董创文;;双塔大横向倾角空间主缆自锚式悬索桥体系转换方案与控制方法[J];土木工程学报;2010年11期
9 张玉平;董创文;;江东大桥双塔单跨空间主缆自锚式悬索桥的施工控制[J];公路交通科技;2010年07期
10 柯红军;;广州猎德大桥体系转换施工方法的确定及实施[J];桥梁建设;2010年02期
相关博士学位论文 前3条
1 彭苗;空间自锚式悬索桥非线性分析与成桥状态确定[D];武汉理工大学;2008年
2 唐茂林;大跨度悬索桥空间几何非线性分析与软件开发[D];西南交通大学;2003年
3 颜东煌;斜拉桥合理设计状态确定与施工控制[D];湖南大学;2001年
相关硕士学位论文 前10条
1 张炎;自锚式悬索桥主缆线形及吊索张拉方案研究[D];重庆交通大学;2014年
2 花杰;双塔混凝土自锚式悬索桥施工控制研究[D];南京林业大学;2014年
3 金鹏;大跨径自锚式悬索桥施工吊索张拉研究[D];重庆交通大学;2013年
4 王沛和;自锚式悬索桥成桥状态及吊索张拉过程研究[D];大连理工大学;2012年
5 鲁宇清;自锚式悬索桥成桥状态确定及施工阶段分析[D];长沙理工大学;2012年
6 李健宁;自锚式悬索桥吊索施工张拉控制及抗震研究[D];兰州交通大学;2012年
7 李熠;PC斜拉桥合理成桥状态研究[D];长沙理工大学;2009年
8 李小年;自锚式悬索桥合理成桥状态确定及吊索张拉优化研究[D];中南大学;2009年
9 许立强;确定斜拉桥合理成桥索力的综合方法与施工控制研究[D];武汉理工大学;2007年
10 吴皋;湘江三汊矶自锚式悬索桥施工控制技术研究[D];长沙理工大学;2007年
,本文编号:2440593
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2440593.html