城市综合客运交通枢纽规划研究
[Abstract]:The integrated hub is an important part of the regional integrated transportation system and the intersection of different transportation modes. The scientific planning of the integrated transportation hub plays an important role in the efficient operation of the integrated transportation network in the region where it is located. At the same time, the integrated hub plays a very important role in the formation and development of the cities it relies on. It is the bridge and link between the urban traffic and the urban transportation system, and it is closely related to the urban transportation system. This paper takes the integrated passenger transport hub in the integrated transportation system as the research object, and studies the integrated traffic hub with the thought and method of systematic analysis. The paper mainly consists of three parts: the system analysis of integrated passenger transport hub, the demand forecast of integrated passenger transportation system and the layout planning of integrated passenger transportation hub. Firstly, this paper analyzes the characteristics and functions of the integrated traffic hub and the components of each subsystem. Then, the forecasting model of passenger flow suitable for integrated traffic hub is analyzed. Taking Xi'an integrated traffic hub as an example, the flow and flow direction of passenger flow under different modes are calculated. Under the condition of known passenger traffic demand, this paper studies the overall layout planning method of urban integrated transportation hub, establishes the planning model, and studies the connection design and traffic organization method of different transportation modes in the hub. Finally, taking the layout planning of Xi'an North Station as an example, the empirical analysis is carried out by using the analysis theory and method proposed in this paper, which achieves the goal of combining the theoretical research with the actual situation.
【学位授予单位】:兰州交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U115
【相似文献】
相关期刊论文 前10条
1 李书尧;螺丝池水电站枢纽布置与防沙[J];四川水力发电;1993年S1期
2 方大凤;天生桥一级水电站枢纽布置及水工建筑物设计[J];红水河;1995年04期
3 李伯益;都平水电站枢纽布置若干问题的回顾[J];人民珠江;1998年06期
4 郝元麟,何顺宾;冶勒水电站枢纽布置设计[J];四川水力发电;2003年04期
5 王小毛,吴效红;湖北五峰锁金山水电站枢纽布置设计[J];人民长江;2004年02期
6 邓毅国;纪辉;;土卡河水电站枢纽布置设计综述[J];云南水力发电;2006年06期
7 银正涛;张毅;刘安辉;;长滩水电站闸坝枢纽布置探讨[J];中国农村水利水电;2007年07期
8 李金合;普晓刚;王志纯;;湘江长沙综合枢纽平面布置研究[J];水道港口;2008年05期
9 李少科;;龙潭水电站枢纽布置及基础处理设计[J];吉林水利;2009年05期
10 黄军;;缅甸古浪水电站枢纽布置[J];红水河;2012年02期
相关会议论文 前8条
1 邱静;黄本胜;杜涓;王丽雯;;剑潭水利枢纽布置方案研究[A];第十八届全国水动力学研讨会文集[C];2004年
2 李海涛;;招徕河水电站枢纽布置设计[A];庆祝坑口碾压混凝土坝建成20周年暨龙滩200m级碾压混凝土坝技术交流会论文汇编[C];2006年
3 丘宜平;薛丽金;林美兰;万鹏;练伟航;;韶关湾头电站模型试验及枢纽布置中若干问题探讨[A];第十八届全国水动力学研讨会文集[C];2004年
4 罗洪波;姚元成;;沙沱水电站枢纽布置特点[A];2010年度碾压混凝土筑坝技术交流研讨会会议资料[C];2010年
5 邱静;杜涓;黄本胜;赖冠文;;低水头拦河水利枢纽布置的探讨[A];第十七届全国水动力学研讨会暨第六届全国水动力学学术会议文集[C];2003年
6 侯志军;高际平;何蕊;;枢纽布置方式对减少过机泥沙的初步分析[A];第十四届全国水动力学研讨会文集[C];2000年
7 冯树荣;罗俊军;肖峰;;龙滩水电站枢纽主要建筑物的设计特点[A];2007年湖南水电科普论坛论文集[C];2007年
8 郑如义;;高红水库拦河闸设计[A];山西省第十一届青年优秀水利科技论文选集[C];2012年
相关重要报纸文章 前1条
1 记者施勇峰;葛洲坝和三峡枢纽将统一调度[N];人民日报海外版;2003年
相关博士学位论文 前1条
1 王晶;基于绿色换乘的高铁枢纽交通接驳规划理论研究[D];天津大学;2011年
相关硕士学位论文 前6条
1 杨东;高速铁路引入枢纽客运站布局方案评价[D];兰州交通大学;2015年
2 吴昊;SD公司HY电航枢纽工程投资计划书[D];华南理工大学;2015年
3 闫智晶;城市综合客运交通枢纽规划研究[D];兰州交通大学;2015年
4 吴延芳;综合货运枢纽场站布局规划研究[D];北京交通大学;2011年
5 屈磊飞;闸站枢纽进水流动计算与研究[D];扬州大学;2006年
6 汪鸣泉;面向广域交通的综合枢纽规划研究[D];同济大学;2008年
,本文编号:2448002
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2448002.html