朝阳路潮汐车道运行效果评价
发布时间:2019-04-09 12:43
【摘要】:利用朝阳路潮汐车道实施前后的实地交通流调查数据,对北京市朝阳路潮汐车道的实施效果进了评价分析。在定性分析朝阳路潮汐车道可实施性的基础上,从潮汐车道设置方案、实施前后平均行驶车速和车流量变化等方面,综合评价了北京市朝阳路潮汐车道的实施对朝阳路晚高峰期间交通流的影响,以及对周边功能相近道路交通状况的影响。研究结果表明:朝阳路潮汐车道实施后,出城方向的平均车速变化不明显,而周边道路出城方向的平均车速有明显的提高;出城方向车流量增加明显,说明朝阳路对周边出城道路的车流量产生了明显吸引作用;朝阳路潮汐车道的实施缓解了晚高峰期间双向交通的不平衡性,实现了出城车流量的均衡分配和潮汐车道资源充分利用的目的。
[Abstract]:Based on the on-the-spot traffic flow survey data before and after the implementation of Chaoyang Road tidal lane, the implementation effect of Chaoyang Road tidal lane in Beijing was evaluated and analyzed. On the basis of qualitative analysis of the enforceability of tidal lane in Chaoyang Road, this paper discusses the setting scheme of tidal lane, the change of average driving speed and traffic flow before and after the implementation, and so on. The influence of tidal lane of Chaoyang Road in Beijing on the traffic flow during the late peak period of Chaoyang Road and the traffic condition of the road with similar function were comprehensively evaluated in this paper. The results show that after the tidal lane of Chaoyang Road is implemented, the average vehicle speed in the direction of exit is not obviously changed, but the average speed in the direction of exit of the surrounding road is obviously increased. The increase of traffic flow in the direction of leaving the city shows that Chaoyang Road has an obvious attraction effect on the traffic flow of the road out of the city around the city. The implementation of tidal lane in Chaoyang Road alleviates the imbalance of two-way traffic during the late peak period, realizes the balanced distribution of traffic flow out of the city and the purpose of making full use of the tidal lane resources.
【作者单位】: 北京交通大学城市交通复杂系统理论与技术教育部重点实验室;北京市公安局交通管理局;
【基金】:国家自然科学基金青年基金项目(61104163);国家自然科学基金项目(71210001) 国家“973”计划项目(2011AA110303) 中央高校基本科研业务费专项资金项目(2013JBM008)
【分类号】:U491.1;U491.22
[Abstract]:Based on the on-the-spot traffic flow survey data before and after the implementation of Chaoyang Road tidal lane, the implementation effect of Chaoyang Road tidal lane in Beijing was evaluated and analyzed. On the basis of qualitative analysis of the enforceability of tidal lane in Chaoyang Road, this paper discusses the setting scheme of tidal lane, the change of average driving speed and traffic flow before and after the implementation, and so on. The influence of tidal lane of Chaoyang Road in Beijing on the traffic flow during the late peak period of Chaoyang Road and the traffic condition of the road with similar function were comprehensively evaluated in this paper. The results show that after the tidal lane of Chaoyang Road is implemented, the average vehicle speed in the direction of exit is not obviously changed, but the average speed in the direction of exit of the surrounding road is obviously increased. The increase of traffic flow in the direction of leaving the city shows that Chaoyang Road has an obvious attraction effect on the traffic flow of the road out of the city around the city. The implementation of tidal lane in Chaoyang Road alleviates the imbalance of two-way traffic during the late peak period, realizes the balanced distribution of traffic flow out of the city and the purpose of making full use of the tidal lane resources.
【作者单位】: 北京交通大学城市交通复杂系统理论与技术教育部重点实验室;北京市公安局交通管理局;
【基金】:国家自然科学基金青年基金项目(61104163);国家自然科学基金项目(71210001) 国家“973”计划项目(2011AA110303) 中央高校基本科研业务费专项资金项目(2013JBM008)
【分类号】:U491.1;U491.22
【参考文献】
相关期刊论文 前8条
1 崔妍;刘东;;北京市朝阳路可变车道交通组织研究[J];道路交通与安全;2006年09期
2 李丽丽;曲昭伟;陈永恒;王殿海;;可变车道的控制方法[J];吉林大学学报(工学版);2009年S1期
3 代磊磊;顾金刚;俞春俊;邱红桐;;潮汐车道交通流特性与设置方案仿真研究[J];交通信息与安全;2012年01期
4 曹静;宫建;杨孝宽;;解决北京市潮汐性交通拥堵的措施研究[J];武汉理工大学学报(交通科学与工程版);2009年06期
5 刘鹏;刘英舜;;潮汐式交通特性分析及应对措施研究[J];交通科技与经济;2011年03期
6 张国华;;关于城市道路潮汐车道的设置研究[J];交通科技;2012年03期
7 宫晓燕;康胜;;“潮汐式”交通中可变通道的通行方向切换算法的研究与应用[J];交通运输系统工程与信息;2006年06期
8 张好智;高自友;;可变车道的道路交通网络设计优化方法[J];中国管理科学;2007年02期
【共引文献】
相关期刊论文 前10条
1 陈坚;霍娅敏;;典型潮汐车流路段可变车道设置方案研究[J];重庆交通大学学报(自然科学版);2008年06期
2 岳雷;徐天东;夏海平;杜豫川;;上海世博会可变车道设置方案研究[J];城市交通;2010年02期
3 韩璧t,
本文编号:2455196