短线匹配法节段箱梁施工技术应用研究
[Abstract]:Short-line matching section box girder construction technology is a relatively new construction technology in recent years. It was first used in Sutong Yangtze River Highway Bridge in China in 2003. The technology has the advantages of rapid and flexible prefabrication schedule, high degree of mechanization and automation, and can save a lot of manpower and material resources. At the same time, because each segment is 2-5m long, there is no need for huge prefabricated space. Minimize the impact and damage caused by construction. In the construction of bridges abroad, the technology has been relatively mature. In the domestic aspect, the improvement and innovation of site construction of the major bridges, such as Sutong Yangtze River Highway Bridge, Xiamen Jimei Bridge, Chong Qi Yangtze River Highway Bridge and Nanjing Yangtze River fourth Bridge, were carried out in China. The construction technology of short-line matching segmental box girder is becoming more and more mature. In this paper, the construction technology of box girder with short-line matching method is comprehensively analyzed and studied based on the engineering example of the fourth Nanjing Yangtze River Bridge. The main contents are as follows: the process principle of segment box girder construction by short-line matching method, the construction technology and process of segment box girder prefabrication and the problems needing attention in the construction process, the process monitoring of short-line matching method during prefabrication and installation of segmental box girder, and the construction process monitoring of segment box girder by short-line matching method. The design and whole assembly of bridge erecting machine, the construction technology and procedure of segmental box girder installation and the problems that should be paid attention to in the course of construction. Finally, the advantages and disadvantages of the short-line matching segmental box girder construction technology are summarized, and the application scope and the future development prospect of the technology are prospected.
【学位授予单位】:山东大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 李冰;浅谈首体桥箱梁施工[J];北京水利;2000年02期
2 黄东青,利矛,祝鹤;浅谈大跨度预应力混凝土箱梁施工中的若干技术问题[J];华南建设学院西院学报;2000年03期
3 程灏;;30m跨连续弯箱梁施工技术[J];贵州工业大学学报(自然科学版);2008年01期
4 邓敏;;高速公路箱梁施工工艺及质量控制分析[J];科技资讯;2010年24期
5 李世龙;;电液比例控制技术在大型箱梁施工设备中的应用[J];建设机械技术与管理;2011年02期
6 丁国志;;论30米箱梁施工常见通病及预防[J];黑龙江科技信息;2011年09期
7 万智勇;;钢箱梁施工中质量控制方法研究[J];筑路机械与施工机械化;2011年07期
8 尚鹏臻;邱巍;;浅谈钢箱梁施工过程的控制[J];公路交通科技(应用技术版);2011年10期
9 王江水;;对预制砼箱梁施工工艺的探讨[J];科技创新导报;2012年07期
10 汪晨;;浅谈冬季箱梁施工的质量控制[J];科技致富向导;2013年06期
相关会议论文 前9条
1 王刚;黄成;;现浇预应力混凝土箱梁施工[A];土木建筑学术文库(第15卷)[C];2011年
2 张建彬;王运震;;后张法预应力混凝土箱梁施工技术[A];土木建筑学术文库(第8卷)[C];2007年
3 阮新伟;王克文;;轨道交通大兴线工程钢箱梁施工技术[A];'2011全国钢结构学术年会论文集[C];2011年
4 郑亚男;吴纪东;;分段张拉曲线桥箱梁施工技术[A];河南省土木建筑学会2009年学术年会论文集[C];2009年
5 郜振宇;孙晓军;万巍;;钢箱梁施工中的吊装及测控技术[A];全国城市公路学会第十七届(2008)学术年会论文集[C];2008年
6 张仁峰;刘洪成;;浅谈混凝土预制箱梁施工中常见的质量缺陷及其防治措施[A];建设工程理论与实践(第二辑)[C];2005年
7 王振玲;董佳节;秦树东;;京承高速跨三环钢-砼组合曲线箱梁施工技术[A];施工机械化新技术交流会论文集(第六辑)[C];2005年
8 廖卓清;林荣有;;洛溪大桥箱梁施工挠度观测和标高控制[A];'95预应力混凝土连续梁和刚构桥学术会议论文集[C];1995年
9 李杰;王嘉谦;王少峰;杨振东;;天津西站跨铁路上客高架桥钢箱梁施工技术[A];中国建筑学会建筑施工分会、中国工程机械工业协会施工机械化分会2012年会暨机械化施工新技术经验交流会会刊[C];2012年
相关重要报纸文章 前1条
1 记者 王立武 通讯员 产运节 徐娜;率先完成箱梁施工[N];中国铁道建筑报;2008年
相关硕士学位论文 前2条
1 彭群兴;复杂环境下新光快速路南洲立交桥钢箱梁施工方案的风险研究[D];西安建筑科技大学;2015年
2 张校昌;短线匹配法节段箱梁施工技术应用研究[D];山东大学;2015年
,本文编号:2455466
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2455466.html