跨既有铁路线连续箱梁桥转体施工技术研究
[Abstract]:At present, China's transportation industry is developing rapidly, every year there are a large number of high-speed railways, roads can be built. When a new road project meets with the need to span existing lines, it will have to face problems such as affecting operation and difficult construction. In order to avoid or minimize the impact on the operation of existing lines, and to ensure the safety of all aspects of existing lines, More and more bridge rotating construction technology has been adopted, but the rotary construction is often faced with problems such as short construction period, high construction risk, strict technical requirements, compact technological process, and high quality control requirements in construction links. It is very difficult to predict and evaluate the risk, so it is necessary to discuss the technology of bridge rotation construction. Lucha Chong Bridge is the key project of the project from Yangjie to Jijie of the Inner Mongolia-Zicheng Expressway. It is the first trans-railway highway turnaround bridge in Yunnan Province. It has the characteristics of large weight of plane rotation and high construction precision. In this paper, combined with engineering examples, the rotating construction technology of continuous box girder bridge spanning existing railway lines is studied in order to provide reference for future construction of the same type of engineering. The main contents of this paper are as follows: 1, Combined with engineering examples, this paper expounds the concrete construction scheme and main construction process of the bridge rotation method, analyzes on the technical problems existing in the construction process, puts forward some new opinions on the key points of the process quality of the rotating body system, and provides construction suggestions. 2, optimize the turnaround construction scheme, make optimal design in process control, preparation before turning, calculation and control of rotation time, bridge rotation, etc. Through the research, we should pay special attention to the monitoring and control in the construction. Monitor and measure the whole construction process of the key parts, guide the construction according to the real-time data; 3, comprehensive analysis and evaluation of the safety risk of bridge rotation construction, and risk matrix method to calculate the risk of the comprehensive grade of risk sources, through the study shows that the quality of concrete pouring, lifting equipment, High altitude object fall is a high risk type; 4. The construction safety risk and labor safety risk existed in construction are studied and judged, and the control measures are put forward. At the same time, the emergency plan design is carried out, which provides a reference scheme for the construction organization design of the same type of engineering.
【学位授予单位】:山东大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 秦立方,梁来;贵阳都拉营T构桥水平转体施工技术[J];施工技术;2000年06期
2 李子义;陈美妮;;桥梁转体施工技术的应用[J];商品与质量;2009年S6期
3 王勇明;;京杭运河大桥转体施工的技术要点[J];工程质量;2010年12期
4 蔡惠华;桥梁“T构”转体施工的一种高效实用方法[J];长沙铁道学院学报;1995年03期
5 雷俊卿;桥梁转体施工新技术的研究[J];西安公路交通大学学报;1998年S2期
6 陈宝春,孙潮,陈友杰;桥梁转体施工方法在我国的应用与发展[J];公路交通科技;2001年02期
7 雷正辉,陈皓;铁路T形刚构立交桥的转体施工[J];铁道建筑;2002年04期
8 左军;桥梁转体施工验算[J];中外建筑;2002年04期
9 田忠政;新岭大桥转体施工技术[J];福建建筑;2003年01期
10 韩洪举;8500吨转体施工关键工艺介绍[J];公路交通技术;2003年05期
相关会议论文 前10条
1 范应心;梁来;;都拉营大桥T构转体施工[A];中国土木工程学会桥梁及结构工程学会第十三届年会论文集(下册)[C];1998年
2 程懋方;;拱桥采用钢管混凝土骨架转体施工[A];全国桥梁结构学术大会论文集(上册)[C];1992年
3 何福元;;平衡重转体施工桥梁的实践与展望[A];第一届全国公路科技创新高层论坛论文集公路设计与施工卷[C];2002年
4 范应心;;160m钢管混凝土拱转体施工[A];中国土木工程学会桥梁及结构工程学会第十二届年会论文集(上册)[C];1996年
5 周如鹄;;拱桥无平衡重转体施工——湖南资兴游垅桥简介[A];中国土木工程学会市政工程专业委员会第一次城市桥梁学术会议论文集[C];1987年
6 程懋方;;钢管混凝土在桥梁转体施工中的应用[A];中国钢协钢-混凝土组合结构协会第三次年会论文集[C];1991年
7 任回兴;贺茂生;李进;;球绞在客运专线大跨度连续梁转体施工中的应用[A];全国城市公路学会第十八届学术年会论文集[C];2009年
8 蒋伟;杨黔军;许卿;冯泉钧;;跨沪宁高速公路大吨位钢球铰转体施工工艺[A];全国城市公路学会第二十次学术年会论文集[C];2011年
9 王武勤;;斜拉桥的平面转体施工[A];中国土木工程学会桥梁及结构工程学会第十三届年会论文集(下册)[C];1998年
10 张强;孙俊梅;;特大型钢箱梁平面转体施工技术[A];第三届全国钢结构工程技术交流会论文集[C];2010年
相关重要报纸文章 前10条
1 记者 何明;广西高铁首例特大桥“转体施工”成功对接[N];广西日报;2011年
2 通讯员 吴玉龙 陈春华 李崇智;高铁128米连续梁桥转体施工技术行业领先[N];中国铁道建筑报;2010年
3 清徐县交通局 牛培铭;桥梁转体施工工艺[N];山西科技报;2002年
4 通讯员 谢挺;首例铁路V型墩转体开工[N];中国铁道建筑报;2007年
5 记者 刘新红;铁四院设计的首座跨高铁连续梁转体成功[N];中国铁道建筑报;2011年
6 赵江平;二百米长的桥梁是怎样旋转的?[N];科技日报;2005年
7 张波;大桥成功转体背后的技术推力[N];人民铁道;2010年
8 通讯员 杨春杰 鲁苗苗;十七局集团五公司“特大吨位T型刚构转体技术”国内领先[N];中国铁道建筑报;2010年
9 通讯员 吴玉龙 冯学亮;京石客专大跨度铁路转体连续梁成功对接[N];中国铁道建筑报;2010年
10 通讯员 杨春杰;大跨度T构桥转体成功[N];中国铁道建筑报;2009年
相关硕士学位论文 前10条
1 刘国华;交叉桥梁转体施工安全评估方法研究[D];长安大学;2015年
2 王刚;跨铁路曲线桥水平转体施工及监控技术研究[D];石家庄铁道大学;2015年
3 王剑宏;(48+48)m铁路T型刚构桥转体施工监测与控制技术研究[D];石家庄铁道大学;2015年
4 张照龙;无平衡重高位拼装桥梁转体施工控制研究[D];石家庄铁道大学;2014年
5 王志刚;T型刚构桥转体施工监测与控制技术研究[D];石家庄铁道大学;2014年
6 许桂生;箱型刚构桥水平转体施工监控及应力与挠度影响因素的研究[D];兰州交通大学;2015年
7 陈晓玲;张呼线(48+80+48)m连续梁桥高墩墩顶转体施工控制技术研究[D];石家庄铁道大学;2016年
8 费家林;张唐铁路转体桥施工技术研究[D];合肥工业大学;2016年
9 张航;连续梁桥墩顶水平转体施工监控技术研究[D];湖南科技大学;2016年
10 陈贤;跨高速公路桥梁转体施工工程的成本优势分析[D];南昌大学;2016年
,本文编号:2462743
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2462743.html